<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	xmlns:media="http://search.yahoo.com/mrss/"
	>

<channel>
	<title>Fortitude Valley News</title>
	<atom:link href="https://fortitudevalleynews.com.au/newsmashuprss3" rel="self" type="application/rss+xml" />
	<link>https://fortitudevalleynews.com.au</link>
	<description>News and other stories about real people, places, and events in Fortitude Valley and nearby suburbs.</description>
	<lastBuildDate>Thu, 12 Nov 2026 02:03:20 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>	
	<sy:updateFrequency>1</sy:updateFrequency>
		<generator>https://wordpress.org/?v=7.0.8</generator>

<image>
	<url>https://fortitudevalleynews.com.au/wp-content/uploads/2021/04/favicon-150x150.png</url>
	<title>Fortitude Valley News</title>
	<link>https://fortitudevalleynews.com.au</link>
	<width>32</width>
	<height>32</height>
</image> 
<item>
<title><![CDATA[Heavy Rain Floods Brisbane Roads as More Storms Threaten South East Queensland]]></title>
<link>https://westendtoday.com.au/brisbane-roads-flood-more-storms-south-east-queensland/brisbane-roads-flood-more-storms-south-east-queensland</link>
<media:content url="https://westendtoday.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires-scaled.png" medium="image"/>
<media:thumbnail url="https://westendtoday.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires-scaled.png"/>
<enclosure url="https://westendtoday.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires-scaled.png" length="1191465" type="image/png"/>
<pubDate>Thu, 12 Nov 2026 02:03:23 +0000</pubDate>
<dc:creator><![CDATA[West End Today]]></dc:creator>
<guid isPermaLink="true">https://westendtoday.com.au/brisbane-roads-flood-more-storms-south-east-queensland/</guid>
<description><![CDATA[


Heavy rain has flooded roads across parts of Brisbane as residents in Moreton Bay, Redlands and surrounding South East Queensland communities prepare for another round of potentially severe thunderstorms following Wednesday's destructive weather.



The Bureau of Meteorology has warned that further storms could develop on Thursday, 12 November, bringing damaging winds, large hail and heavy rainfall capable of causing flash flooding.



The renewed threat comes as emergency crews continue clearing fallen trees, repairing damaged powerlines and responding to storm-related property damage. More than 80,000 homes and businesses across South East Queensland lost electricity at the height of Wednesday's storms, with tens of thousands still without power on Thursday morning.



Brisbane, Redlands and Moreton Bay were all affected by intense storm activity, with rainfall observations showing how quickly conditions deteriorated across southern and eastern suburbs.



Intense rainfall floods Brisbane streets



Some of Wednesday's heaviest rainfall was recorded in Brisbane's southern and eastern suburbs, where intense downpours delivered substantial amounts of rain in just half an hour.



Bureau of Meteorology observations recorded 78 millimetres at Wishart in the 30 minutes to 4:39 p.m., while Chandler received 75 millimetres in the 30 minutes to 4:52 p.m. Nearby Burbank recorded 59 millimetres over a similar period.



The short, intense bursts of rainfall created flash-flooding hazards on local roads and placed additional pressure on drainage systems.&nbsp;



In Gumdale, Formosa Road was closed to through traffic between Stanbrough Road and Dairy Swamp Road because of flash flooding. Emergency crews were also called to Gumdale on Wednesday evening after a vehicle became stranded in floodwater. Swiftwater rescue personnel assisted the driver to safety.



Elsewhere in Brisbane, a falling tree struck two vehicles on Logan Road at Eight Mile Plains as severe winds swept through the area.



Brisbane Airport recorded a wind gust of 96 kilometres per hour at 5:03 p.m. on Wednesday, with the severe weather causing flight delays, cancellations and temporary operational disruption.



Motorists are being urged to check road conditions before travelling, particularly in areas affected by heavy rain and fallen trees. Road restrictions may be lifted or introduced as conditions change.




BRISBANE EMERGENCY DASHBOARD








Redlands hit by heavy rain as storms move towards the bay



Redlands also experienced intense rainfall as Wednesday's thunderstorms moved across eastern Brisbane and towards Moreton Bay.



The Bureau recorded 75 millimetres of rain at Leslie Harrison Dam in the 30 minutes to 4:47 p.m., placing the area among the locations that experienced the most intense short-duration rainfall during the event.



At 5:19 p.m., the Bureau issued a severe thunderstorm warning covering parts of Redland City, Brisbane and Moreton Bay. Storms detected around Ormiston and Brisbane Airport were capable of producing damaging winds and heavy rainfall that could lead to flash flooding.



Cleveland, Victoria Point, Ormiston and nearby islands were among the locations identified in warnings as the storms developed during the afternoon.



The State Emergency Service received 16 requests for assistance across Redlands following Wednesday's weather, adding to hundreds of calls received throughout South East Queensland.



Residents in Cleveland, Capalaba, Wellington Point, Victoria Point and surrounding suburbs can check the Redlands Coast Disaster Dashboard for local warnings, road closures, electricity interruptions and emergency information.




REDLANDS COAST DISASTER DASHBOARD








The dashboard also provides evacuation information when relevant. No widespread evacuation order affecting Redlands has been established in the reports reviewed for this article.



Moreton Bay suburbs face further storm threat



Communities across Moreton Bay were also within the path of Wednesday's severe weather, with storm cells developing near Caboolture and Burpengary before moving towards the coast.



The Bureau's afternoon warnings identified conditions capable of producing damaging winds, large hail and intense rainfall across parts of the Moreton Bay region.



By early evening, the warning area extended towards the waters off Redcliffe, with Redcliffe and Scarborough among the locations forecast to be affected as the storms moved north and northeast.



Electricity interruptions were reported across the wider Moreton Bay region during Wednesday's severe weather, although the largest concentration of damage to the Energex network occurred further south in Logan and the Scenic Rim.



For residents in Caboolture, Morayfield, Burpengary, North Lakes, Redcliffe and neighbouring suburbs, the City of Moreton Bay Disaster Dashboard provides a central source of local emergency updates.




CITY OF MORETON BAY DISASTER DASHBOARD








The council's dashboard includes weather warnings, road conditions, power outages and information about emergency facilities and available disaster support services.



Residents should continue checking official updates, particularly where local roads, waterways or properties remain vulnerable to another period of heavy rainfall.



Electricity restoration continues across the south-east



Restoring electricity remains one of the largest recovery operations following Wednesday's storms, with widespread damage to powerlines, poles and other infrastructure.



Energex reported more than 400 sections of powerline brought down across South East Queensland, while more than 120,000 lightning strikes were recorded during the severe weather.



The worst electrical damage was concentrated in Logan and the Scenic Rim, where falling trees and damaged infrastructure left tens of thousands of properties disconnected.



By Thursday morning, approximately 55,000 properties across the region remained without power, according to ABC News reporting based on Energex information. Repair crews were being reinforced as assessments identified damaged poles and lines requiring replacement.



Some customers may face prolonged interruptions, particularly where access is obstructed or major infrastructure repairs are required.



Residents in Brisbane, Redlands and Moreton Bay can use the Energex Outage Finder to check reported power interruptions, affected locations and available restoration estimates.




ENERGEX OUTAGE FINDER








Energex has warned residents to remain clear of fallen electrical wires and to treat damaged powerlines as live. Electrical emergencies can be reported on 13 19 62.



School closures and transport disruption



Wednesday's storms also disrupted education across South East Queensland, with schools in the hardest-hit districts unable to operate normally because of damage and electricity interruptions.



Eleven state schools in the Logan City Council area were reported closed on Thursday morning, including campuses in Marsden, Crestmead, Jimboomba and Yarrabilba. Subsequent reporting placed the number of affected schools in the broader Logan and Jimboomba area at 13.



Within Brisbane, Mansfield State School cancelled a prep orientation session after experiencing telephone and internet disruption.



Parents across Brisbane, Moreton Bay and Redlands can check the Queensland Government's current emergency school closures register for information about affected state, independent and Catholic schools.




QLD SCHOOL CLOSURES








The register should be checked before travelling, as schools may reopen once power, access and safety conditions have been assessed. Families should also consult their school's own communications for local arrangements.



Transport disruption has extended beyond flooded roads. Brisbane Airport experienced delays and cancellations during Wednesday's storms, while local road hazards included fallen branches, damaged traffic infrastructure and standing water.



Drivers can check QLDTraffic or the Transport and Main Roads Road Status Update for restrictions affecting state-controlled roads. Council emergency dashboards provide additional local information.




TMR ROAD STATUS UPDATE








Emergency crews respond to hundreds of calls



The State Emergency Service received more than 320 requests for assistance across South East Queensland after Wednesday's storms.



Logan accounted for the majority of the calls, but emergency crews were also deployed across Brisbane, Redlands and other affected areas.



The requests largely involved fallen trees, damaged roofs, blocked access to properties and other storm-related hazards. Brisbane recorded 41 requests, while Redlands recorded 16.



Emergency workers have been clearing debris, securing damaged structures and helping residents protect properties exposed to further rainfall.



Authorities are also urging residents to avoid floodwater and stay away from fallen electrical infrastructure. Even shallow floodwater can conceal damaged road surfaces, debris and strong currents.



More severe thunderstorms possible



The Bureau of Meteorology has forecast another period of unsettled weather across South East Queensland on Thursday, with severe thunderstorms possible from the Gold Coast through Brisbane and the Sunshine Coast towards Bundaberg.



Forecasters have identified damaging winds, large hail and heavy rainfall leading to flash flooding as the main hazards.



The threat is particularly concerning for communities still dealing with damaged buildings, blocked access and electricity interruptions from Wednesday's storms.



Storm activity may ease in some districts on Friday before increasing again over the weekend as another weather system develops across inland Queensland.



Residents should monitor the Bureau of Meteorology's Queensland warnings and check their local council's emergency information before making travel plans.




BOM QUEENSLAND WARNINGS









  What residents should do
  
    Check weather warnings before travelling
    Avoid flooded roads and never drive through floodwater
    Stay clear of fallen powerlines
    Charge phones and devices while power is available
    Secure loose outdoor items where safe
    Call SES on 132 500 for non-life-threatening storm damage
    Call 000 in a life-threatening emergency
  




Published 12-Nov-2026
]]></description>
<content:encoded><![CDATA[


Heavy rain has flooded roads across parts of Brisbane as residents in Moreton Bay, Redlands and surrounding South East Queensland communities prepare for another round of potentially severe thunderstorms following Wednesday's destructive weather.



The Bureau of Meteorology has warned that further storms could develop on Thursday, 12 November, bringing damaging winds, large hail and heavy rainfall capable of causing flash flooding.



The renewed threat comes as emergency crews continue clearing fallen trees, repairing damaged powerlines and responding to storm-related property damage. More than 80,000 homes and businesses across South East Queensland lost electricity at the height of Wednesday's storms, with tens of thousands still without power on Thursday morning.



Brisbane, Redlands and Moreton Bay were all affected by intense storm activity, with rainfall observations showing how quickly conditions deteriorated across southern and eastern suburbs.



Intense rainfall floods Brisbane streets



Some of Wednesday's heaviest rainfall was recorded in Brisbane's southern and eastern suburbs, where intense downpours delivered substantial amounts of rain in just half an hour.



Bureau of Meteorology observations recorded 78 millimetres at Wishart in the 30 minutes to 4:39 p.m., while Chandler received 75 millimetres in the 30 minutes to 4:52 p.m. Nearby Burbank recorded 59 millimetres over a similar period.



The short, intense bursts of rainfall created flash-flooding hazards on local roads and placed additional pressure on drainage systems.&nbsp;



In Gumdale, Formosa Road was closed to through traffic between Stanbrough Road and Dairy Swamp Road because of flash flooding. Emergency crews were also called to Gumdale on Wednesday evening after a vehicle became stranded in floodwater. Swiftwater rescue personnel assisted the driver to safety.



Elsewhere in Brisbane, a falling tree struck two vehicles on Logan Road at Eight Mile Plains as severe winds swept through the area.



Brisbane Airport recorded a wind gust of 96 kilometres per hour at 5:03 p.m. on Wednesday, with the severe weather causing flight delays, cancellations and temporary operational disruption.



Motorists are being urged to check road conditions before travelling, particularly in areas affected by heavy rain and fallen trees. Road restrictions may be lifted or introduced as conditions change.




BRISBANE EMERGENCY DASHBOARD








Redlands hit by heavy rain as storms move towards the bay



Redlands also experienced intense rainfall as Wednesday's thunderstorms moved across eastern Brisbane and towards Moreton Bay.



The Bureau recorded 75 millimetres of rain at Leslie Harrison Dam in the 30 minutes to 4:47 p.m., placing the area among the locations that experienced the most intense short-duration rainfall during the event.



At 5:19 p.m., the Bureau issued a severe thunderstorm warning covering parts of Redland City, Brisbane and Moreton Bay. Storms detected around Ormiston and Brisbane Airport were capable of producing damaging winds and heavy rainfall that could lead to flash flooding.



Cleveland, Victoria Point, Ormiston and nearby islands were among the locations identified in warnings as the storms developed during the afternoon.



The State Emergency Service received 16 requests for assistance across Redlands following Wednesday's weather, adding to hundreds of calls received throughout South East Queensland.



Residents in Cleveland, Capalaba, Wellington Point, Victoria Point and surrounding suburbs can check the Redlands Coast Disaster Dashboard for local warnings, road closures, electricity interruptions and emergency information.




REDLANDS COAST DISASTER DASHBOARD








The dashboard also provides evacuation information when relevant. No widespread evacuation order affecting Redlands has been established in the reports reviewed for this article.



Moreton Bay suburbs face further storm threat



Communities across Moreton Bay were also within the path of Wednesday's severe weather, with storm cells developing near Caboolture and Burpengary before moving towards the coast.



The Bureau's afternoon warnings identified conditions capable of producing damaging winds, large hail and intense rainfall across parts of the Moreton Bay region.



By early evening, the warning area extended towards the waters off Redcliffe, with Redcliffe and Scarborough among the locations forecast to be affected as the storms moved north and northeast.



Electricity interruptions were reported across the wider Moreton Bay region during Wednesday's severe weather, although the largest concentration of damage to the Energex network occurred further south in Logan and the Scenic Rim.



For residents in Caboolture, Morayfield, Burpengary, North Lakes, Redcliffe and neighbouring suburbs, the City of Moreton Bay Disaster Dashboard provides a central source of local emergency updates.




CITY OF MORETON BAY DISASTER DASHBOARD








The council's dashboard includes weather warnings, road conditions, power outages and information about emergency facilities and available disaster support services.



Residents should continue checking official updates, particularly where local roads, waterways or properties remain vulnerable to another period of heavy rainfall.



Electricity restoration continues across the south-east



Restoring electricity remains one of the largest recovery operations following Wednesday's storms, with widespread damage to powerlines, poles and other infrastructure.



Energex reported more than 400 sections of powerline brought down across South East Queensland, while more than 120,000 lightning strikes were recorded during the severe weather.



The worst electrical damage was concentrated in Logan and the Scenic Rim, where falling trees and damaged infrastructure left tens of thousands of properties disconnected.



By Thursday morning, approximately 55,000 properties across the region remained without power, according to ABC News reporting based on Energex information. Repair crews were being reinforced as assessments identified damaged poles and lines requiring replacement.



Some customers may face prolonged interruptions, particularly where access is obstructed or major infrastructure repairs are required.



Residents in Brisbane, Redlands and Moreton Bay can use the Energex Outage Finder to check reported power interruptions, affected locations and available restoration estimates.




ENERGEX OUTAGE FINDER








Energex has warned residents to remain clear of fallen electrical wires and to treat damaged powerlines as live. Electrical emergencies can be reported on 13 19 62.



School closures and transport disruption



Wednesday's storms also disrupted education across South East Queensland, with schools in the hardest-hit districts unable to operate normally because of damage and electricity interruptions.



Eleven state schools in the Logan City Council area were reported closed on Thursday morning, including campuses in Marsden, Crestmead, Jimboomba and Yarrabilba. Subsequent reporting placed the number of affected schools in the broader Logan and Jimboomba area at 13.



Within Brisbane, Mansfield State School cancelled a prep orientation session after experiencing telephone and internet disruption.



Parents across Brisbane, Moreton Bay and Redlands can check the Queensland Government's current emergency school closures register for information about affected state, independent and Catholic schools.




QLD SCHOOL CLOSURES








The register should be checked before travelling, as schools may reopen once power, access and safety conditions have been assessed. Families should also consult their school's own communications for local arrangements.



Transport disruption has extended beyond flooded roads. Brisbane Airport experienced delays and cancellations during Wednesday's storms, while local road hazards included fallen branches, damaged traffic infrastructure and standing water.



Drivers can check QLDTraffic or the Transport and Main Roads Road Status Update for restrictions affecting state-controlled roads. Council emergency dashboards provide additional local information.




TMR ROAD STATUS UPDATE








Emergency crews respond to hundreds of calls



The State Emergency Service received more than 320 requests for assistance across South East Queensland after Wednesday's storms.



Logan accounted for the majority of the calls, but emergency crews were also deployed across Brisbane, Redlands and other affected areas.



The requests largely involved fallen trees, damaged roofs, blocked access to properties and other storm-related hazards. Brisbane recorded 41 requests, while Redlands recorded 16.



Emergency workers have been clearing debris, securing damaged structures and helping residents protect properties exposed to further rainfall.



Authorities are also urging residents to avoid floodwater and stay away from fallen electrical infrastructure. Even shallow floodwater can conceal damaged road surfaces, debris and strong currents.



More severe thunderstorms possible



The Bureau of Meteorology has forecast another period of unsettled weather across South East Queensland on Thursday, with severe thunderstorms possible from the Gold Coast through Brisbane and the Sunshine Coast towards Bundaberg.



Forecasters have identified damaging winds, large hail and heavy rainfall leading to flash flooding as the main hazards.



The threat is particularly concerning for communities still dealing with damaged buildings, blocked access and electricity interruptions from Wednesday's storms.



Storm activity may ease in some districts on Friday before increasing again over the weekend as another weather system develops across inland Queensland.



Residents should monitor the Bureau of Meteorology's Queensland warnings and check their local council's emergency information before making travel plans.




BOM QUEENSLAND WARNINGS









  What residents should do
  
    Check weather warnings before travelling
    Avoid flooded roads and never drive through floodwater
    Stay clear of fallen powerlines
    Charge phones and devices while power is available
    Secure loose outdoor items where safe
    Call SES on 132 500 for non-life-threatening storm damage
    Call 000 in a life-threatening emergency
  




Published 12-Nov-2026
]]></content:encoded>
</item><item>
<title><![CDATA[West End Markets Adds Extra Christmas Shopping Day Ahead of Festive Rush]]></title>
<link>https://westendtoday.com.au/west-end-markets-adds-extra-christmas-shopping-day-ahead-of-festive-rush</link>
<media:content url="https://westendtoday.com.au/wp-content/uploads/2026/11/West-End-popup-market-scaled.png" medium="image"/>
<media:thumbnail url="https://westendtoday.com.au/wp-content/uploads/2026/11/West-End-popup-market-scaled.png"/>
<enclosure url="https://westendtoday.com.au/wp-content/uploads/2026/11/West-End-popup-market-scaled.png" length="916843" type="image/png"/>
<pubDate>Wed, 11 Nov 2026 03:14:22 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[artisan markets]]></category>
<category><![CDATA[Brisbane Christmas markets]]></category>
<category><![CDATA[Christmas gifts]]></category>
<category><![CDATA[Christmas shopping Brisbane]]></category>
<category><![CDATA[community markets]]></category>
<category><![CDATA[local markets]]></category>
<category><![CDATA[Queensland producers]]></category>
<category><![CDATA[West End Brisbane]]></category>
<category><![CDATA[West End Markets]]></category>
<dc:creator><![CDATA[West End Today]]></dc:creator>
<guid isPermaLink="true">https://westendtoday.com.au/?page_id=17842</guid>
<description><![CDATA[
West End shoppers will have an extra chance to stock up on fresh festive food and locally made gifts before Christmas as West End Markets adds a special seasonal market day.



Read: West End Fundraiser Backs Legal Challenge to Vulture Street Project



A Midweek Boost for Christmas Preparations



Photo Credit: Supplied



In a move aimed at helping residents prepare for the holiday season, West End Markets Christmas Pop-Up will give shoppers an additional opportunity to buy produce, specialty foods and gifts outside the market's regular Saturday trading schedule. The extra market is set to take place just days before Christmas, offering an alternative for those hoping to avoid crowded shopping centres and supermarket queues.



The pop-up event is expected to bring together local growers, food producers, fishers and specialty traders from across the region. Organisers say visitors will be able to browse a wide range of seasonal ingredients and festive provisions as households make final preparations for Christmas gatherings.



Local Produce Takes Centre Stage



Fresh food is expected to be a major focus of the event, with traders offering seasonal fruit, seafood, meats, baked goods and other Christmas favourites. Organisers say the market will showcase produce sourced from local suppliers, giving shoppers an opportunity to support Queensland businesses while purchasing ingredients for holiday meals.



For many families, the lead-up to Christmas often involves multiple trips to busy retail centres. The additional market day is designed to provide another option, particularly for those who prefer shopping directly from producers and independent traders.



Supporting Small Businesses



Photo Credit: Supplied



Beyond food shopping, the event is also expected to feature a range of artisan products, handmade goods and gift ideas from local makers. That could prove valuable for shoppers still searching for last-minute presents while keeping spending within the local economy.



Community markets have become an important outlet for many small businesses, offering direct access to customers and helping independent operators reach audiences they may not otherwise attract through traditional retail channels. The Christmas pop-up gives those traders an extra opportunity during one of the busiest shopping periods of the year.



Practical Details for Visitors



According to organisers, parking will be available through Souths Leagues Club, with additional on-street parking available in surrounding areas where permitted. Visitors are encouraged to check local signage and arrive early, particularly as demand is typically higher during the final days before Christmas.



The special market is scheduled for Wednesday, 23 December, from 7 a.m. to noon at the corner of Montague Road and Jane Street in West End.



Read: West End CityCat Trips Could Include Onboard Drinks Under Proposed Trial



Summer Trading Continues



While the Christmas event adds a one-off date to the calendar, West End Markets will continue operating throughout the summer period. Regular Saturday markets will remain in place, giving residents ongoing access to fresh produce, artisan goods and local traders beyond the festive season.



For many Brisbane residents, that means the community market experience will continue well after the Christmas celebrations have ended.



Published Date 11-November-2026
]]></description>
<content:encoded><![CDATA[
West End shoppers will have an extra chance to stock up on fresh festive food and locally made gifts before Christmas as West End Markets adds a special seasonal market day.



Read: West End Fundraiser Backs Legal Challenge to Vulture Street Project



A Midweek Boost for Christmas Preparations



Photo Credit: Supplied



In a move aimed at helping residents prepare for the holiday season, West End Markets Christmas Pop-Up will give shoppers an additional opportunity to buy produce, specialty foods and gifts outside the market's regular Saturday trading schedule. The extra market is set to take place just days before Christmas, offering an alternative for those hoping to avoid crowded shopping centres and supermarket queues.



The pop-up event is expected to bring together local growers, food producers, fishers and specialty traders from across the region. Organisers say visitors will be able to browse a wide range of seasonal ingredients and festive provisions as households make final preparations for Christmas gatherings.



Local Produce Takes Centre Stage



Fresh food is expected to be a major focus of the event, with traders offering seasonal fruit, seafood, meats, baked goods and other Christmas favourites. Organisers say the market will showcase produce sourced from local suppliers, giving shoppers an opportunity to support Queensland businesses while purchasing ingredients for holiday meals.



For many families, the lead-up to Christmas often involves multiple trips to busy retail centres. The additional market day is designed to provide another option, particularly for those who prefer shopping directly from producers and independent traders.



Supporting Small Businesses



Photo Credit: Supplied



Beyond food shopping, the event is also expected to feature a range of artisan products, handmade goods and gift ideas from local makers. That could prove valuable for shoppers still searching for last-minute presents while keeping spending within the local economy.



Community markets have become an important outlet for many small businesses, offering direct access to customers and helping independent operators reach audiences they may not otherwise attract through traditional retail channels. The Christmas pop-up gives those traders an extra opportunity during one of the busiest shopping periods of the year.



Practical Details for Visitors



According to organisers, parking will be available through Souths Leagues Club, with additional on-street parking available in surrounding areas where permitted. Visitors are encouraged to check local signage and arrive early, particularly as demand is typically higher during the final days before Christmas.



The special market is scheduled for Wednesday, 23 December, from 7 a.m. to noon at the corner of Montague Road and Jane Street in West End.



Read: West End CityCat Trips Could Include Onboard Drinks Under Proposed Trial



Summer Trading Continues



While the Christmas event adds a one-off date to the calendar, West End Markets will continue operating throughout the summer period. Regular Saturday markets will remain in place, giving residents ongoing access to fresh produce, artisan goods and local traders beyond the festive season.



For many Brisbane residents, that means the community market experience will continue well after the Christmas celebrations have ended.



Published Date 11-November-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Queensland E-Bike Assurance Scheme: What Owners Need to Know]]></title>
<link>https://westendtoday.com.au/queensland-e-bike-assurance-scheme-inspection-centres-2026/queensland-e-bike-assurance-scheme-inspection-centres-2026</link>
<media:content url="https://westendtoday.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes-scaled.png" medium="image"/>
<media:thumbnail url="https://westendtoday.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes-scaled.png"/>
<enclosure url="https://westendtoday.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes-scaled.png" length="959869" type="image/png"/>
<pubDate>Wed, 11 Nov 2026 03:16:22 +0000</pubDate>
<dc:creator><![CDATA[West End Today]]></dc:creator>
<guid isPermaLink="true">https://westendtoday.com.au/queensland-e-bike-assurance-scheme-inspection-centres-2026/</guid>
<description><![CDATA[


Queensland e-bike owners facing new compliance requirements have only nine authorised inspection centres available statewide, with no locations currently listed in several major regional cities.



The Electrically Power-Assisted Cycle (EPAC) Assurance Scheme commenced on 2 November 2026, allowing owners of eligible older e-bikes to have their devices inspected and approved for continued legal use. However, the initial network consists entirely of Trek bicycle stores, most of them concentrated in south-east Queensland.



The state's official directory of authorised verifiers lists three centres in Brisbane, two on the Gold Coast, and one each in Ipswich, Moreton Bay, the Sunshine Coast and Rockhampton. There are no authorised locations currently listed in Townsville, Cairns, Toowoomba or Mackay.



Owners requiring verification must book an appointment and bring their e-bike to an approved retailer. The Department of Transport and Main Roads advises that appointments may take a couple of weeks, depending on individual store capacity.



The department expects additional retailers to join the program over the coming months. Alternative arrangements are also being developed for rural and remote residents without reasonable access to a verifier, with further details expected in early 2027.



Which e-bikes need inspection?



The scheme primarily covers eligible e-bikes manufactured before 1 July 2026 that do not meet the European EN 15194 standard or lack the required compliance label.



To qualify, these older bicycles must have pedals as their primary source of power, a maximum continuous rated motor output of 250 watts, and motor assistance that stops at 25 km/h. Where throttle control is fitted, throttle-only assistance must be limited to 6 km/h to help riders start moving.



Devices must also satisfy other technical and safety requirements before an authorised retailer can approve them. E-bikes that already meet EN 15194 and display the required compliance label do not need another inspection.



For eligible older bicycles, the initial pre-screening is free. A formal assessment may cost up to $50, with a further $20 permitted for issuing a permanent compliance label and recording the verification.



Owners covered by the transition arrangements have until 28 February 2027 to obtain the required label. From 1 March 2027, e-bikes that need verification must display the appropriate compliance label to continue being ridden legally in public.



The scheme cannot be used to legalise high-powered, high-speed or illegally modified devices. It also provides a separate pathway for certain e-bikes and e-trikes designed or adapted for people with disabilities or medical conditions.



A label issued through the scheme confirms that an eligible device has met Queensland's verification requirements. It does not certify full compliance with the European EN 15194 standard.






  
    Queensland E-Bike Inspections: What Owners Need to Know
  

  
    Queensland's new EPAC Assurance Scheme allows eligible older e-bikes to be inspected and approved for continued legal use.
  

  
    Scheme commenced: 2 November 2026
    Compliance deadline: 28 February 2027
    Initial screening: Free
    Formal inspection: Up to $50
    Compliance label: Up to $20
    Total possible cost: $70
    Authorised locations: Nine across Queensland at launch
    Already compliant? E-bikes meeting EN 15194 and displaying the required label do not need another inspection.
    Bookings: Appointments must be arranged with an authorised retailer.
  

  
    Important: The scheme does not legalise high-powered, high-speed or illegally modified devices.
  

  
    Source:
    
      Queensland Department of Transport and Main Roads – EPAC Assurance Scheme
    
  






Cycling advocates highlight the cost of compliance



Bicycle Queensland has supported clearer rules distinguishing lawful pedal-assisted bicycles from illegal high-powered devices, while the cost and accessibility of verification remain concerns for cycling advocates.



In its published explanation of the new laws, the organisation outlines the inspection process and the potential $70 charge facing owners whose existing bicycles require verification.



The fee applies to the formal assessment and labelling process rather than every e-bike owner. Riders whose bicycles already carry the correct EN 15194 label are not required to pay for another inspection.



The limited number of participating retailers also presents a practical question for people living far from an inspection centre, particularly those who rely on their e-bikes for everyday transport.



Bicycle Industries Australia has welcomed the scheme. Its general manager, Peter Bourke, has supported measures that help riders access safe, legal products and said the program would allow bicycle businesses to assist owners in establishing whether their devices meet Queensland's requirements.



The Department of Transport and Main Roads has described the scheme as a practical way for owners of legitimate existing e-bikes to continue riding, while keeping dangerous high-powered and high-speed devices off public roads and paths.



Research shows e-bikes are used across Queensland



The availability of inspection centres takes on wider significance when considered alongside new research into the growing number of Queenslanders using electric bicycles and other e-mobility devices.



A University of Queensland study, released on 21 October 2026, estimated that Queenslanders owned approximately 587,000 e-bikes, accounting for 61 per cent of privately owned e-mobility devices. The study also estimated 352,100 e-scooters and 30,400 other devices.



Researchers found that one in three Queensland households owned an e-mobility device, with total household spending on the devices estimated at $2.2 billion. Ownership was not confined to metropolitan areas. The study found that 28 per cent of households in remote Queensland reported owning an e-mobility device, reinforcing the importance of access to transport options outside major cities.



For one in four e-mobility users surveyed, a private car was their only alternative means of transport. More than half of the primary users of privately owned devices were aged 50 or older. The findings point to the role electric transport now plays in everyday travel, from commuting and shopping to recreation and maintaining independence.



However, the estimated 587,000 e-bikes do not represent the number requiring inspection under the new scheme. Many already meet the relevant standards, while others may be ineligible for verification.



The research also identified safety concerns. About half of privately owned e-mobility devices were classified as non-compliant based on owners' self-reported speed, motor power and throttle characteristics.



Researchers cautioned that the findings covered different types of e-mobility devices and did not establish how many existing e-bikes would require inspection or replacement compliance labels.



Safety reforms target illegal high-powered devices



The assurance scheme forms part of Queensland's broader e-mobility reforms, introduced amid concerns about serious injuries, unsafe riding and devices capable of travelling well beyond the permitted limits.



New rules introduced during 2026 include restrictions on motor power and speed, tighter age and licensing requirements, and expanded police enforcement powers.



Under the state's current e-bike rules, bicycles powered by motors exceeding 250 watts of maximum continuous rated output cannot legally be ridden on public roads or paths as ordinary e-bikes. Devices that depend entirely on throttle power, rather than pedalling, are also prohibited, apart from the limited starting assistance permitted under the rules. Police can issue significant fines and seize illegal devices.



Transport authorities say the verification process is intended to distinguish suitable older bicycles from machines that fail the state's safety requirements. The scheme gives owners of qualifying existing e-bikes a means of keeping their bicycles on the road without requiring them to meet every provision of the European standard introduced for newer devices.



Where owners can get their e-bikes checked



As of 11 November 2026, the Queensland Government lists nine authorised inspection centres, all operated by Trek Bicycle.



RegionAuthorised inspection centreBrisbaneTrek CarindaleBrisbaneTrek WindsorBrisbaneTrek WoolloongabbaIpswichTrek Ipswich, East IpswichMoreton BayTrek North LakesGold CoastTrek Ashmore, MolendinarGold CoastTrek Burleigh HeadsSunshine CoastTrek Sunshine Coast, MinyamaCentral QueenslandTrek Rockhampton, Norman Gardens



Source: Queensland Department of Transport and Main Roads, EPAC Assurance Scheme authorised verifier directory. The government has advised owners to check the directory regularly as more retailers join the scheme.



Owners must contact an authorised retailer to arrange an inspection before visiting. The department recommends bringing any available information about the bicycle's make, model, purchase date and technical specifications.



For eligible riders whose bicycles still need verification, the transition period provides an opportunity to arrange an inspection before the February deadline. Whether the expanding network reaches more regional communities before then remains an important question as the scheme progresses.



Published 10-Nov-2026Featured Image Credit: Brisbane City Council




]]></description>
<content:encoded><![CDATA[


Queensland e-bike owners facing new compliance requirements have only nine authorised inspection centres available statewide, with no locations currently listed in several major regional cities.



The Electrically Power-Assisted Cycle (EPAC) Assurance Scheme commenced on 2 November 2026, allowing owners of eligible older e-bikes to have their devices inspected and approved for continued legal use. However, the initial network consists entirely of Trek bicycle stores, most of them concentrated in south-east Queensland.



The state's official directory of authorised verifiers lists three centres in Brisbane, two on the Gold Coast, and one each in Ipswich, Moreton Bay, the Sunshine Coast and Rockhampton. There are no authorised locations currently listed in Townsville, Cairns, Toowoomba or Mackay.



Owners requiring verification must book an appointment and bring their e-bike to an approved retailer. The Department of Transport and Main Roads advises that appointments may take a couple of weeks, depending on individual store capacity.



The department expects additional retailers to join the program over the coming months. Alternative arrangements are also being developed for rural and remote residents without reasonable access to a verifier, with further details expected in early 2027.



Which e-bikes need inspection?



The scheme primarily covers eligible e-bikes manufactured before 1 July 2026 that do not meet the European EN 15194 standard or lack the required compliance label.



To qualify, these older bicycles must have pedals as their primary source of power, a maximum continuous rated motor output of 250 watts, and motor assistance that stops at 25 km/h. Where throttle control is fitted, throttle-only assistance must be limited to 6 km/h to help riders start moving.



Devices must also satisfy other technical and safety requirements before an authorised retailer can approve them. E-bikes that already meet EN 15194 and display the required compliance label do not need another inspection.



For eligible older bicycles, the initial pre-screening is free. A formal assessment may cost up to $50, with a further $20 permitted for issuing a permanent compliance label and recording the verification.



Owners covered by the transition arrangements have until 28 February 2027 to obtain the required label. From 1 March 2027, e-bikes that need verification must display the appropriate compliance label to continue being ridden legally in public.



The scheme cannot be used to legalise high-powered, high-speed or illegally modified devices. It also provides a separate pathway for certain e-bikes and e-trikes designed or adapted for people with disabilities or medical conditions.



A label issued through the scheme confirms that an eligible device has met Queensland's verification requirements. It does not certify full compliance with the European EN 15194 standard.






  
    Queensland E-Bike Inspections: What Owners Need to Know
  

  
    Queensland's new EPAC Assurance Scheme allows eligible older e-bikes to be inspected and approved for continued legal use.
  

  
    Scheme commenced: 2 November 2026
    Compliance deadline: 28 February 2027
    Initial screening: Free
    Formal inspection: Up to $50
    Compliance label: Up to $20
    Total possible cost: $70
    Authorised locations: Nine across Queensland at launch
    Already compliant? E-bikes meeting EN 15194 and displaying the required label do not need another inspection.
    Bookings: Appointments must be arranged with an authorised retailer.
  

  
    Important: The scheme does not legalise high-powered, high-speed or illegally modified devices.
  

  
    Source:
    
      Queensland Department of Transport and Main Roads – EPAC Assurance Scheme
    
  






Cycling advocates highlight the cost of compliance



Bicycle Queensland has supported clearer rules distinguishing lawful pedal-assisted bicycles from illegal high-powered devices, while the cost and accessibility of verification remain concerns for cycling advocates.



In its published explanation of the new laws, the organisation outlines the inspection process and the potential $70 charge facing owners whose existing bicycles require verification.



The fee applies to the formal assessment and labelling process rather than every e-bike owner. Riders whose bicycles already carry the correct EN 15194 label are not required to pay for another inspection.



The limited number of participating retailers also presents a practical question for people living far from an inspection centre, particularly those who rely on their e-bikes for everyday transport.



Bicycle Industries Australia has welcomed the scheme. Its general manager, Peter Bourke, has supported measures that help riders access safe, legal products and said the program would allow bicycle businesses to assist owners in establishing whether their devices meet Queensland's requirements.



The Department of Transport and Main Roads has described the scheme as a practical way for owners of legitimate existing e-bikes to continue riding, while keeping dangerous high-powered and high-speed devices off public roads and paths.



Research shows e-bikes are used across Queensland



The availability of inspection centres takes on wider significance when considered alongside new research into the growing number of Queenslanders using electric bicycles and other e-mobility devices.



A University of Queensland study, released on 21 October 2026, estimated that Queenslanders owned approximately 587,000 e-bikes, accounting for 61 per cent of privately owned e-mobility devices. The study also estimated 352,100 e-scooters and 30,400 other devices.



Researchers found that one in three Queensland households owned an e-mobility device, with total household spending on the devices estimated at $2.2 billion. Ownership was not confined to metropolitan areas. The study found that 28 per cent of households in remote Queensland reported owning an e-mobility device, reinforcing the importance of access to transport options outside major cities.



For one in four e-mobility users surveyed, a private car was their only alternative means of transport. More than half of the primary users of privately owned devices were aged 50 or older. The findings point to the role electric transport now plays in everyday travel, from commuting and shopping to recreation and maintaining independence.



However, the estimated 587,000 e-bikes do not represent the number requiring inspection under the new scheme. Many already meet the relevant standards, while others may be ineligible for verification.



The research also identified safety concerns. About half of privately owned e-mobility devices were classified as non-compliant based on owners' self-reported speed, motor power and throttle characteristics.



Researchers cautioned that the findings covered different types of e-mobility devices and did not establish how many existing e-bikes would require inspection or replacement compliance labels.



Safety reforms target illegal high-powered devices



The assurance scheme forms part of Queensland's broader e-mobility reforms, introduced amid concerns about serious injuries, unsafe riding and devices capable of travelling well beyond the permitted limits.



New rules introduced during 2026 include restrictions on motor power and speed, tighter age and licensing requirements, and expanded police enforcement powers.



Under the state's current e-bike rules, bicycles powered by motors exceeding 250 watts of maximum continuous rated output cannot legally be ridden on public roads or paths as ordinary e-bikes. Devices that depend entirely on throttle power, rather than pedalling, are also prohibited, apart from the limited starting assistance permitted under the rules. Police can issue significant fines and seize illegal devices.



Transport authorities say the verification process is intended to distinguish suitable older bicycles from machines that fail the state's safety requirements. The scheme gives owners of qualifying existing e-bikes a means of keeping their bicycles on the road without requiring them to meet every provision of the European standard introduced for newer devices.



Where owners can get their e-bikes checked



As of 11 November 2026, the Queensland Government lists nine authorised inspection centres, all operated by Trek Bicycle.



RegionAuthorised inspection centreBrisbaneTrek CarindaleBrisbaneTrek WindsorBrisbaneTrek WoolloongabbaIpswichTrek Ipswich, East IpswichMoreton BayTrek North LakesGold CoastTrek Ashmore, MolendinarGold CoastTrek Burleigh HeadsSunshine CoastTrek Sunshine Coast, MinyamaCentral QueenslandTrek Rockhampton, Norman Gardens



Source: Queensland Department of Transport and Main Roads, EPAC Assurance Scheme authorised verifier directory. The government has advised owners to check the directory regularly as more retailers join the scheme.



Owners must contact an authorised retailer to arrange an inspection before visiting. The department recommends bringing any available information about the bicycle's make, model, purchase date and technical specifications.



For eligible riders whose bicycles still need verification, the transition period provides an opportunity to arrange an inspection before the February deadline. Whether the expanding network reaches more regional communities before then remains an important question as the scheme progresses.



Published 10-Nov-2026Featured Image Credit: Brisbane City Council




]]></content:encoded>
</item><item>
<title><![CDATA[West End Fundraiser Backs Legal Challenge to Vulture Street Project]]></title>
<link>https://westendtoday.com.au/west-end-vulture-street-development-appeal</link>
<media:content url="https://westendtoday.com.au/wp-content/uploads/2026/10/FI-for-OMC-52-scaled.webp" medium="image"/>
<media:thumbnail url="https://westendtoday.com.au/wp-content/uploads/2026/10/FI-for-OMC-52-scaled.webp"/>
<enclosure url="https://westendtoday.com.au/wp-content/uploads/2026/10/FI-for-OMC-52-scaled.webp" length="45768" type="image/webp"/>
<pubDate>Wed, 28 Oct 2026 23:30:18 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[33 Vulture Street]]></category>
<category><![CDATA[Stockwell]]></category>
<category><![CDATA[Vulture Street]]></category>
<category><![CDATA[West End development]]></category>
<dc:creator><![CDATA[West End Today]]></dc:creator>
<guid isPermaLink="true">https://westendtoday.com.au/?page_id=17816</guid>
<description><![CDATA[
A community group is seeking $40,000 through an online fundraising campaign to challenge the approval of a 14-storey development in West End, with the money intended to cover legal and expert advice as the dispute over the project moves towards mediation.







Read: 14-Storey West End Apartment Development Approved Opposite Primary School







The campaign, organised by the Paris and Turin Streets' Committee, concerns Stockwell Development Group's approved plans for 33 Vulture Street, opposite West End State School. Organisers argued the development is too large for its setting and could add pressure to surrounding infrastructure, while the approved scheme provides new apartments, commercial space, and communal facilities.



The GoFundMe appeal was launched in October 2026. The campaign page lists a $40,000 target to fund the next stage of the legal challenge.




  
    .fundraising-box {
      box-sizing: border-box;
      width: 100%;
      max-width: 680px;
      margin: 1.5rem auto;
      padding: 1.25rem;
      border: 1px solid #d5d5d5;
      border-radius: 10px;
      color: #222;
      background: #fff;
      font-family: Arial, sans-serif;
    }
    .fundraising-box h3 {
      margin: 0 0 1rem;
      font-size: 1.15rem;
      line-height: 1.4;
    }
    .fundraising-box dl {
      display: grid;
      grid-template-columns: repeat(2, minmax(0, 1fr));
      gap: 1rem;
      margin: 0;
    }
    .fundraising-box dl div {
      min-width: 0;
    }
    .fundraising-box dt {
      margin-bottom: 0.35rem;
      font-size: 0.875rem;
      color: #555;
    }
    .fundraising-box dd {
      margin: 0;
      font-size: 1.35rem;
      font-weight: 700;
      overflow-wrap: anywhere;
    }
    .fundraising-box p {
      margin: 1rem 0 0;
      font-size: 0.875rem;
      line-height: 1.5;
    }
    .fundraising-box a {
      color: #174f86;
      text-decoration: underline;
    }
    @media (max-width: 360px) {
      .fundraising-box {
        padding: 0.9rem;
      }
      .fundraising-box dl {
        grid-template-columns: 1fr;
      }
    }
  
  33 Vulture Street Appeal
  
    
      Fundraising target
      $40,000
    
    
      Raised as at 29 October 2026
      $6,703
    
    
      Donations recorded
      19
    
    
      Next stated milestone
      12 November
    
  
  
    Figures are a snapshot and may change. The mediation date is
    reported by the campaign organisers. See the
    
      fundraising page
     for updates.
  




Seven residents directly affected by the development lodged an appeal in the Planning and Environment Court on 25 September, according to the campaign organisers. They said 26 local residents contributed $8,000 towards the initial legal work and filing fees. The current fundraising drive is intended to finance the next stage of the proceedings.



What the Approved Development Includes



Photo credit: Stockwell



The approved plans provide for 112 residences in two-, three- and four-bedroom layouts, alongside retail and commercial space. Stockwell's published project information also lists rooftop amenities including a swimming pool, spa, sauna, gym and function room.



The site occupies the corner of Vulture, Paris, and Turin Streets and was previously associated with the Queensland Can Factory. The approved plans retain existing heritage street facades along Paris and Turin Streets, with parking accommodated in podium levels behind them.



Photo credit: Stockwell



The project differs from the original proposal, which sought a 16-storey building containing 132 apartments. The approved version has been reduced to 14 storeys and 112 residences.



Despite that reduction, the height remains a central point of dispute. The campaign committee argued that the approved building exceeds the eight-storey acceptable outcome identified in the relevant neighbourhood planning framework. That figure is a planning benchmark, rather than an absolute height cap, and the approval does not by itself establish whether the decision was legally flawed.



The development attracted 399 objections and 18 letters of support. Concerns raised by opponents include building scale, setbacks, traffic, and the site's position directly opposite West End State School.



Appeal Moves Towards Mediation



The committee said the next stage will require an estimated $40,000 in legal and expert adviser costs. A mediation session is scheduled for 12 November, according to the campaign page, although a court hearing date has not been announced.



The appeal is not the only legal challenge to the approval. Organisers say the owner of the Dello Mano building and the owners of two adjoining Paris Street properties have also lodged appeals. The planning portal records the application as appealed, with the outcome pending.



School capacity and child safety feature prominently in the fundraising group's case. Organisers point to West End State School's location opposite the site and raise concerns about traffic and overlooking. They also cite enrolment pressures at Brisbane State High School.



Stockwell's published project information confirms the approved development's size and residential mix. The developer has also publicly confirmed that the project received approval from Brisbane.



The committee said contributors will receive updates by email and at regular meetings. It also states that any funds left over from this stage will be refunded proportionally to donors.







Read: West End Residents Push Back Against 16-Storey Tower Near Primary School







The court process will determine the outcome of the appeals. Until then, the development remains approved but contested, with the legal challenge focused on whether the decision should stand.



Published 29-October-2026




]]></description>
<content:encoded><![CDATA[
A community group is seeking $40,000 through an online fundraising campaign to challenge the approval of a 14-storey development in West End, with the money intended to cover legal and expert advice as the dispute over the project moves towards mediation.







Read: 14-Storey West End Apartment Development Approved Opposite Primary School







The campaign, organised by the Paris and Turin Streets' Committee, concerns Stockwell Development Group's approved plans for 33 Vulture Street, opposite West End State School. Organisers argued the development is too large for its setting and could add pressure to surrounding infrastructure, while the approved scheme provides new apartments, commercial space, and communal facilities.



The GoFundMe appeal was launched in October 2026. The campaign page lists a $40,000 target to fund the next stage of the legal challenge.




  
    .fundraising-box {
      box-sizing: border-box;
      width: 100%;
      max-width: 680px;
      margin: 1.5rem auto;
      padding: 1.25rem;
      border: 1px solid #d5d5d5;
      border-radius: 10px;
      color: #222;
      background: #fff;
      font-family: Arial, sans-serif;
    }
    .fundraising-box h3 {
      margin: 0 0 1rem;
      font-size: 1.15rem;
      line-height: 1.4;
    }
    .fundraising-box dl {
      display: grid;
      grid-template-columns: repeat(2, minmax(0, 1fr));
      gap: 1rem;
      margin: 0;
    }
    .fundraising-box dl div {
      min-width: 0;
    }
    .fundraising-box dt {
      margin-bottom: 0.35rem;
      font-size: 0.875rem;
      color: #555;
    }
    .fundraising-box dd {
      margin: 0;
      font-size: 1.35rem;
      font-weight: 700;
      overflow-wrap: anywhere;
    }
    .fundraising-box p {
      margin: 1rem 0 0;
      font-size: 0.875rem;
      line-height: 1.5;
    }
    .fundraising-box a {
      color: #174f86;
      text-decoration: underline;
    }
    @media (max-width: 360px) {
      .fundraising-box {
        padding: 0.9rem;
      }
      .fundraising-box dl {
        grid-template-columns: 1fr;
      }
    }
  
  33 Vulture Street Appeal
  
    
      Fundraising target
      $40,000
    
    
      Raised as at 29 October 2026
      $6,703
    
    
      Donations recorded
      19
    
    
      Next stated milestone
      12 November
    
  
  
    Figures are a snapshot and may change. The mediation date is
    reported by the campaign organisers. See the
    
      fundraising page
     for updates.
  




Seven residents directly affected by the development lodged an appeal in the Planning and Environment Court on 25 September, according to the campaign organisers. They said 26 local residents contributed $8,000 towards the initial legal work and filing fees. The current fundraising drive is intended to finance the next stage of the proceedings.



What the Approved Development Includes



Photo credit: Stockwell



The approved plans provide for 112 residences in two-, three- and four-bedroom layouts, alongside retail and commercial space. Stockwell's published project information also lists rooftop amenities including a swimming pool, spa, sauna, gym and function room.



The site occupies the corner of Vulture, Paris, and Turin Streets and was previously associated with the Queensland Can Factory. The approved plans retain existing heritage street facades along Paris and Turin Streets, with parking accommodated in podium levels behind them.



Photo credit: Stockwell



The project differs from the original proposal, which sought a 16-storey building containing 132 apartments. The approved version has been reduced to 14 storeys and 112 residences.



Despite that reduction, the height remains a central point of dispute. The campaign committee argued that the approved building exceeds the eight-storey acceptable outcome identified in the relevant neighbourhood planning framework. That figure is a planning benchmark, rather than an absolute height cap, and the approval does not by itself establish whether the decision was legally flawed.



The development attracted 399 objections and 18 letters of support. Concerns raised by opponents include building scale, setbacks, traffic, and the site's position directly opposite West End State School.



Appeal Moves Towards Mediation



The committee said the next stage will require an estimated $40,000 in legal and expert adviser costs. A mediation session is scheduled for 12 November, according to the campaign page, although a court hearing date has not been announced.



The appeal is not the only legal challenge to the approval. Organisers say the owner of the Dello Mano building and the owners of two adjoining Paris Street properties have also lodged appeals. The planning portal records the application as appealed, with the outcome pending.



School capacity and child safety feature prominently in the fundraising group's case. Organisers point to West End State School's location opposite the site and raise concerns about traffic and overlooking. They also cite enrolment pressures at Brisbane State High School.



Stockwell's published project information confirms the approved development's size and residential mix. The developer has also publicly confirmed that the project received approval from Brisbane.



The committee said contributors will receive updates by email and at regular meetings. It also states that any funds left over from this stage will be refunded proportionally to donors.







Read: West End Residents Push Back Against 16-Storey Tower Near Primary School







The court process will determine the outcome of the appeals. Until then, the development remains approved but contested, with the legal challenge focused on whether the decision should stand.



Published 29-October-2026




]]></content:encoded>
</item><item>
<title><![CDATA[Baby Rhyme Time Brings a Little Rhythm to Brisbane’s Libraries]]></title>
<link>https://westendtoday.com.au/baby-rhyme-time-brings-a-little-rhythm-to-brisbanes-libraries/baby-rhyme-time-brings-a-little-rhythm-to-brisbanes-libraries</link>
<media:content url="https://westendtoday.com.au/wp-content/uploads/2026/10/BSON_First5Forever-1-scaled.jpg" medium="image"/>
<media:thumbnail url="https://westendtoday.com.au/wp-content/uploads/2026/10/BSON_First5Forever-1-scaled.jpg"/>
<enclosure url="https://westendtoday.com.au/wp-content/uploads/2026/10/BSON_First5Forever-1-scaled.jpg" length="68165" type="image/jpeg"/>
<pubDate>Wed, 28 Oct 2026 06:36:46 +0000</pubDate>
<dc:creator><![CDATA[West End Today]]></dc:creator>
<guid isPermaLink="true">https://westendtoday.com.au/baby-rhyme-time-brings-a-little-rhythm-to-brisbanes-libraries/</guid>
<description><![CDATA[


Baby rhyme time is one of those small library events that quietly earns its keep. It is free, simple and aimed at babies up to one year old. The November schedule shows it at Indooroopilly, with the wider run also reaching libraries across Brisbane. That makes it an easy one for local families to actually use.



A quick outing that feels close to home 



The event page keeps things plain. Families can meet other parents and babies for singing, clapping and dancing. There is no booking needed, which keeps the whole thing easy. At the same time, places are limited, so a session can close if it fills up.



That balance suits a library pretty well. It is open, but not chaotic. It is friendly, but still orderly. For parents juggling naps, bottles and everything else, that sort of setup matters more than people might think. 



The bigger schedule gives the program a wider reach. Alongside Indooroopilly, it also shows sessions at places like Holland Park, Chermside, Carina, Banyo, Nundah and Zillmere. So this is not just one nice little event in one suburb. It is a regular community rhythm across several parts of the city. 



The kind of noise libraries can welcome 



Baby rhyme time works because it is built for the early months. The event listing says the songs and action rhymes help nurture pre-literacy, communication, language and social skills. That sounds formal, but the idea behind it is pretty simple. Babies hear words, watch faces and start getting used to the sound of language. 



That is where libraries come into their own. They are already calm places. They already belong to the community. So a session like this feels natural there, not bolted on. 



And honestly, that is part of the appeal. Parents do not need a grand plan for the morning. They just need something local, useful and low-fuss. Baby rhyme time gives them that. 



A small session worth repeating 



First 5 Forever backs the program, with the State Library of Queensland coordinating it in partnership with local government. That gives the session a proper public purpose, but the benefit is still felt at the local level. One suburb gets a room full of songs. Another suburb gets the same thing on a different day. 



That is the charm of it. Baby rhyme time is not trying to be bigger than it needs to be. It just gives babies, parents and carers a warm little place to start. In a city as busy as Brisbane, that feels worth keeping on the calendar.




  
    
      Place
      Date
      Time
    
  
  
    Annerley Library11/6/20269:15AM - 9:45 AM
    Annerley Library11/13/20269:15AM - 9:45 AM
    Annerley Library11/20/20269:15AM - 9:45 AM
    Annerley Library11/27/20269:15AM - 9:45 AM

    Ashgrove Library11/4/20269:30AM - 10:00 AM
    Ashgrove Library11/11/20269:30AM - 10:00 AM
    Ashgrove Library11/18/20269:30AM - 10:00 AM
    Ashgrove Library11/25/20269:30AM - 10:00 AM

    Banyo Library11/5/202611:30AM - 12:00PM
    Banyo Library11/12/202611:30AM - 12:00PM
    Banyo Library11/19/202611:30AM - 12:00PM
    Banyo Library11/26/202611:30AM - 12:00PM

    Bracken Ridge Library11/6/202610:00AM - 10:30 AM
    Bracken Ridge Library11/13/202610:00AM - 10:30 AM
    Bracken Ridge Library11/20/202610:00AM - 10:30 AM
    Bracken Ridge Library11/27/202610:00AM - 10:30 AM

    Brisbane Square Library11/5/202611:30AM - 12:00PM
    Brisbane Square Library11/12/202611:30AM - 12:00PM
    Brisbane Square Library11/19/202611:30AM - 12:00PM
    Brisbane Square Library11/26/202611:30AM - 12:00PM

    Bulimba Library11/5/202610:00AM - 10:30 AM
    Bulimba Library11/12/202610:00AM - 10:30 AM
    Bulimba Library11/19/202610:00AM - 10:30 AM
    Bulimba Library11/26/202610:00AM - 10:30 AM

    Carina Library11/2/202610:30AM- 11:00AM
    Carina Library11/9/202610:30AM- 11:00AM
    Carina Library11/16/202610:30AM- 11:00AM
    Carina Library11/23/202610:30AM- 11:00AM
    Carina Library11/30/202610:30AM- 11:00AM

    Carindale Library11/3/202610:45AM - 11:15AM
    Carindale Library11/4/202610:30AM- 11:00AM
    Carindale Library11/10/202610:45AM - 11:15AM
    Carindale Library11/11/202610:00AM - 10:30 AM
    Carindale Library11/17/202610:45AM - 11:15AM
    Carindale Library11/18/202610:00AM - 10:30 AM
    Carindale Library11/24/202610:45AM - 11:15AM
    Carindale Library11/25/202610:00AM - 10:30 AM

    Chermside Library11/3/202610:00AM - 10:30 AM
    Chermside Library11/3/202611:00AM - 11:30 AM
    Chermside Library11/4/202611:00AM - 11:30 AM
    Chermside Library11/10/202610:00AM - 10:30 AM
    Chermside Library11/10/202611:00AM - 11:30 AM
    Chermside Library11/11/202611:00AM - 11:30 AM
    Chermside Library11/17/202610:00AM - 10:30 AM
    Chermside Library11/17/202611:00AM - 11:30 AM
    Chermside Library11/18/202611:00AM - 11:30 AM
    Chermside Library11/24/202610:00AM - 10:30 AM
    Chermside Library11/24/202611:00AM - 11:30 AM
    Chermside Library11/25/202611:00AM - 11:30 AM

    Coopers Plain Library11/5/202610:00AM - 10:30 AM
    Coopers Plain Library11/12/202610:00AM - 10:30 AM
    Coopers Plain Library11/19/202610:00AM - 10:30 AM
    Coopers Plain Library11/26/202610:00AM - 10:30 AM

    Corinda Library11/6/20269:15AM - 9:45 AM
    Corinda Library11/13/20269:15AM - 9:45 AM
    Corinda Library11/20/20269:15AM - 9:45 AM
    Corinda Library11/27/20269:15AM - 9:45 AM

    Everton Park LIbrary11/3/202611:00AM - 11:30 AM
    Everton Park LIbrary11/10/202611:00AM - 11:30 AM
    Everton Park LIbrary11/17/202611:00AM - 11:30 AM
    Everton Park LIbrary11/24/202611:00AM - 11:30 AM

    Fairfield Library11/4/20269:30AM - 10:00 AM
    Fairfield Library11/11/20269:30AM - 10:00 AM
    Fairfield Library11/18/20269:30AM - 10:00 AM
    Fairfield Library11/25/20269:30AM - 10:00 AM

    Garden City Library11/2/202610:30AM- 11:00AM
    Garden City Library11/4/202610:30AM- 11:00AM
    Garden City Library11/9/202610:30AM- 11:00AM
    Garden City Library11/11/202610:30AM- 11:00AM
    Garden City Library11/16/202610:30AM- 11:00AM
    Garden City Library11/18/202610:30AM- 11:00AM
    Garden City Library11/23/202610:30AM- 11:00AM
    Garden City Library11/25/202610:30AM- 11:00AM
    Garden City Library11/30/202610:30AM- 11:00AM

    Grange Library11/5/202611:15AM - 11:45AM
    Grange Library11/12/202611:15AM - 11:45AM
    Grange Library11/19/202611:15AM - 11:45AM
    Grange Library11/26/202611:15AM - 11:45AM

    Holland Park Library11/4/20262:00PM - 2:30PM
    Holland Park Library11/11/20262:00PM - 2:30PM
    Holland Park Library11/18/20262:00PM - 2:30PM
    Holland Park Library11/25/20262:00PM - 2:30PM

    Inala Library11/3/20262:00PM - 2:30PM
    Inala Library11/10/20262:00PM - 2:30PM
    Inala Library11/17/20262:00PM - 2:30PM
    Inala Library11/24/20262:00PM - 2:30PM

    Indooroopilly Library11/2/202610:15AM - 10:45AM
    Indooroopilly Library11/6/202610:15AM - 10:45AM
    Indooroopilly Library11/9/202610:15AM - 10:45AM
    Indooroopilly Library11/13/202610:15AM - 10:45AM
    Indooroopilly Library11/16/202610:15AM - 10:45AM
    Indooroopilly Library11/20/202610:15AM - 10:45AM
    Indooroopilly Library11/23/202610:15AM - 10:45AM
    Indooroopilly Library11/27/202610:15AM - 10:45AM
    Indooroopilly Library11/30/202610:15AM - 10:45AM

    Kenmore Library11/4/202610:30AM- 11:00AM
    Kenmore Library11/11/202610:30AM- 11:00AM
    Kenmore Library11/18/202610:30AM- 11:00AM
    Kenmore Library11/25/202610:30AM- 11:00AM

    Mitchelton Library11/6/202611:00AM - 11:30 AM
    Mitchelton Library11/13/202611:00AM - 11:30 AM
    Mitchelton Library11/20/202611:00AM - 11:30 AM
    Mitchelton Library11/27/202611:00AM - 11:30 AM

    Mount Gravatt Library11/6/20269:30AM - 10:00 AM
    Mount Gravatt Library11/13/20269:30AM - 10:00 AM
    Mount Gravatt Library11/20/20269:30AM - 10:00 AM
    Mount Gravatt Library11/27/20269:30AM - 10:00 AM

    Mt Ommaney Library11/4/20269:30AM - 10:00 AM
    Mt Ommaney Library11/11/20269:30AM - 10:00 AM
    Mt Ommaney Library11/18/20269:30AM - 10:00 AM
    Mt Ommaney Library11/25/20269:30AM - 10:00 AM

    New Farm Library11/4/202611:00AM - 11:30 AM
    New Farm Library11/11/202611:00AM - 11:30 AM
    New Farm Library11/18/202611:00AM - 11:30 AM
    New Farm Library11/25/202611:00AM - 11:30 AM

    Nundah Library11/5/20269:30AM - 10:00 AM
    Nundah Library11/12/20269:30AM - 10:00 AM
    Nundah Library11/19/20269:30AM - 10:00 AM
    Nundah Library11/26/20269:30AM - 10:00 AM

    Sandgate Library11/6/202610:00AM - 10:30 AM
    Sandgate Library11/13/202610:00AM - 10:30 AM
    Sandgate Library11/20/202610:00AM - 10:30 AM
    Sandgate Library11/27/202610:00AM - 10:30 AM

    Stones Corner Library11/6/20269:30AM - 10:00 AM
    Stones Corner Library11/13/20269:30AM - 10:00 AM
    Stones Corner Library11/20/20269:30AM - 10:00 AM
    Stones Corner Library11/27/20269:30AM - 10:00 AM

    Sunnybank Hills Library11/2/202610:30AM- 11:00AM
    Sunnybank Hills Library11/9/202610:30AM- 11:00AM
    Sunnybank Hills Library11/16/202610:30AM- 11:00AM
    Sunnybank Hills Library11/23/202610:30AM- 11:00AM
    Sunnybank Hills Library11/30/202610:30AM- 11:00AM

    Toowong Library11/3/202611:30AM - 12:00PM
    Toowong Library11/10/202611:30AM - 12:00PM
    Toowong Library11/17/202611:30AM - 12:00PM
    Toowong Library11/24/202611:30AM - 12:00PM

    West End Library11/4/20269:15AM - 9:45 AM
    West End Library11/11/20269:15AM - 9:45 AM
    West End Library11/18/20269:15AM - 9:45 AM
    West End Library11/25/20269:15AM - 9:45 AM

    Wynnum Library11/6/20269:15AM - 9:45 AM
    Wynnum Library11/13/20269:15AM - 9:45 AM
    Wynnum Library11/20/20269:15AM - 9:45 AM
    Wynnum Library11/27/20269:15AM - 9:45 AM

    Zillmere Library11/5/202610:30AM- 11:00AM
    Zillmere Library11/12/202610:30AM- 11:00AM
    Zillmere Library11/19/202610:30AM- 11:00AM
    Zillmere Library11/26/202610:30AM- 11:00AM
  




Published 28-October-2026
]]></description>
<content:encoded><![CDATA[


Baby rhyme time is one of those small library events that quietly earns its keep. It is free, simple and aimed at babies up to one year old. The November schedule shows it at Indooroopilly, with the wider run also reaching libraries across Brisbane. That makes it an easy one for local families to actually use.



A quick outing that feels close to home 



The event page keeps things plain. Families can meet other parents and babies for singing, clapping and dancing. There is no booking needed, which keeps the whole thing easy. At the same time, places are limited, so a session can close if it fills up.



That balance suits a library pretty well. It is open, but not chaotic. It is friendly, but still orderly. For parents juggling naps, bottles and everything else, that sort of setup matters more than people might think. 



The bigger schedule gives the program a wider reach. Alongside Indooroopilly, it also shows sessions at places like Holland Park, Chermside, Carina, Banyo, Nundah and Zillmere. So this is not just one nice little event in one suburb. It is a regular community rhythm across several parts of the city. 



The kind of noise libraries can welcome 



Baby rhyme time works because it is built for the early months. The event listing says the songs and action rhymes help nurture pre-literacy, communication, language and social skills. That sounds formal, but the idea behind it is pretty simple. Babies hear words, watch faces and start getting used to the sound of language. 



That is where libraries come into their own. They are already calm places. They already belong to the community. So a session like this feels natural there, not bolted on. 



And honestly, that is part of the appeal. Parents do not need a grand plan for the morning. They just need something local, useful and low-fuss. Baby rhyme time gives them that. 



A small session worth repeating 



First 5 Forever backs the program, with the State Library of Queensland coordinating it in partnership with local government. That gives the session a proper public purpose, but the benefit is still felt at the local level. One suburb gets a room full of songs. Another suburb gets the same thing on a different day. 



That is the charm of it. Baby rhyme time is not trying to be bigger than it needs to be. It just gives babies, parents and carers a warm little place to start. In a city as busy as Brisbane, that feels worth keeping on the calendar.




  
    
      Place
      Date
      Time
    
  
  
    Annerley Library11/6/20269:15AM - 9:45 AM
    Annerley Library11/13/20269:15AM - 9:45 AM
    Annerley Library11/20/20269:15AM - 9:45 AM
    Annerley Library11/27/20269:15AM - 9:45 AM

    Ashgrove Library11/4/20269:30AM - 10:00 AM
    Ashgrove Library11/11/20269:30AM - 10:00 AM
    Ashgrove Library11/18/20269:30AM - 10:00 AM
    Ashgrove Library11/25/20269:30AM - 10:00 AM

    Banyo Library11/5/202611:30AM - 12:00PM
    Banyo Library11/12/202611:30AM - 12:00PM
    Banyo Library11/19/202611:30AM - 12:00PM
    Banyo Library11/26/202611:30AM - 12:00PM

    Bracken Ridge Library11/6/202610:00AM - 10:30 AM
    Bracken Ridge Library11/13/202610:00AM - 10:30 AM
    Bracken Ridge Library11/20/202610:00AM - 10:30 AM
    Bracken Ridge Library11/27/202610:00AM - 10:30 AM

    Brisbane Square Library11/5/202611:30AM - 12:00PM
    Brisbane Square Library11/12/202611:30AM - 12:00PM
    Brisbane Square Library11/19/202611:30AM - 12:00PM
    Brisbane Square Library11/26/202611:30AM - 12:00PM

    Bulimba Library11/5/202610:00AM - 10:30 AM
    Bulimba Library11/12/202610:00AM - 10:30 AM
    Bulimba Library11/19/202610:00AM - 10:30 AM
    Bulimba Library11/26/202610:00AM - 10:30 AM

    Carina Library11/2/202610:30AM- 11:00AM
    Carina Library11/9/202610:30AM- 11:00AM
    Carina Library11/16/202610:30AM- 11:00AM
    Carina Library11/23/202610:30AM- 11:00AM
    Carina Library11/30/202610:30AM- 11:00AM

    Carindale Library11/3/202610:45AM - 11:15AM
    Carindale Library11/4/202610:30AM- 11:00AM
    Carindale Library11/10/202610:45AM - 11:15AM
    Carindale Library11/11/202610:00AM - 10:30 AM
    Carindale Library11/17/202610:45AM - 11:15AM
    Carindale Library11/18/202610:00AM - 10:30 AM
    Carindale Library11/24/202610:45AM - 11:15AM
    Carindale Library11/25/202610:00AM - 10:30 AM

    Chermside Library11/3/202610:00AM - 10:30 AM
    Chermside Library11/3/202611:00AM - 11:30 AM
    Chermside Library11/4/202611:00AM - 11:30 AM
    Chermside Library11/10/202610:00AM - 10:30 AM
    Chermside Library11/10/202611:00AM - 11:30 AM
    Chermside Library11/11/202611:00AM - 11:30 AM
    Chermside Library11/17/202610:00AM - 10:30 AM
    Chermside Library11/17/202611:00AM - 11:30 AM
    Chermside Library11/18/202611:00AM - 11:30 AM
    Chermside Library11/24/202610:00AM - 10:30 AM
    Chermside Library11/24/202611:00AM - 11:30 AM
    Chermside Library11/25/202611:00AM - 11:30 AM

    Coopers Plain Library11/5/202610:00AM - 10:30 AM
    Coopers Plain Library11/12/202610:00AM - 10:30 AM
    Coopers Plain Library11/19/202610:00AM - 10:30 AM
    Coopers Plain Library11/26/202610:00AM - 10:30 AM

    Corinda Library11/6/20269:15AM - 9:45 AM
    Corinda Library11/13/20269:15AM - 9:45 AM
    Corinda Library11/20/20269:15AM - 9:45 AM
    Corinda Library11/27/20269:15AM - 9:45 AM

    Everton Park LIbrary11/3/202611:00AM - 11:30 AM
    Everton Park LIbrary11/10/202611:00AM - 11:30 AM
    Everton Park LIbrary11/17/202611:00AM - 11:30 AM
    Everton Park LIbrary11/24/202611:00AM - 11:30 AM

    Fairfield Library11/4/20269:30AM - 10:00 AM
    Fairfield Library11/11/20269:30AM - 10:00 AM
    Fairfield Library11/18/20269:30AM - 10:00 AM
    Fairfield Library11/25/20269:30AM - 10:00 AM

    Garden City Library11/2/202610:30AM- 11:00AM
    Garden City Library11/4/202610:30AM- 11:00AM
    Garden City Library11/9/202610:30AM- 11:00AM
    Garden City Library11/11/202610:30AM- 11:00AM
    Garden City Library11/16/202610:30AM- 11:00AM
    Garden City Library11/18/202610:30AM- 11:00AM
    Garden City Library11/23/202610:30AM- 11:00AM
    Garden City Library11/25/202610:30AM- 11:00AM
    Garden City Library11/30/202610:30AM- 11:00AM

    Grange Library11/5/202611:15AM - 11:45AM
    Grange Library11/12/202611:15AM - 11:45AM
    Grange Library11/19/202611:15AM - 11:45AM
    Grange Library11/26/202611:15AM - 11:45AM

    Holland Park Library11/4/20262:00PM - 2:30PM
    Holland Park Library11/11/20262:00PM - 2:30PM
    Holland Park Library11/18/20262:00PM - 2:30PM
    Holland Park Library11/25/20262:00PM - 2:30PM

    Inala Library11/3/20262:00PM - 2:30PM
    Inala Library11/10/20262:00PM - 2:30PM
    Inala Library11/17/20262:00PM - 2:30PM
    Inala Library11/24/20262:00PM - 2:30PM

    Indooroopilly Library11/2/202610:15AM - 10:45AM
    Indooroopilly Library11/6/202610:15AM - 10:45AM
    Indooroopilly Library11/9/202610:15AM - 10:45AM
    Indooroopilly Library11/13/202610:15AM - 10:45AM
    Indooroopilly Library11/16/202610:15AM - 10:45AM
    Indooroopilly Library11/20/202610:15AM - 10:45AM
    Indooroopilly Library11/23/202610:15AM - 10:45AM
    Indooroopilly Library11/27/202610:15AM - 10:45AM
    Indooroopilly Library11/30/202610:15AM - 10:45AM

    Kenmore Library11/4/202610:30AM- 11:00AM
    Kenmore Library11/11/202610:30AM- 11:00AM
    Kenmore Library11/18/202610:30AM- 11:00AM
    Kenmore Library11/25/202610:30AM- 11:00AM

    Mitchelton Library11/6/202611:00AM - 11:30 AM
    Mitchelton Library11/13/202611:00AM - 11:30 AM
    Mitchelton Library11/20/202611:00AM - 11:30 AM
    Mitchelton Library11/27/202611:00AM - 11:30 AM

    Mount Gravatt Library11/6/20269:30AM - 10:00 AM
    Mount Gravatt Library11/13/20269:30AM - 10:00 AM
    Mount Gravatt Library11/20/20269:30AM - 10:00 AM
    Mount Gravatt Library11/27/20269:30AM - 10:00 AM

    Mt Ommaney Library11/4/20269:30AM - 10:00 AM
    Mt Ommaney Library11/11/20269:30AM - 10:00 AM
    Mt Ommaney Library11/18/20269:30AM - 10:00 AM
    Mt Ommaney Library11/25/20269:30AM - 10:00 AM

    New Farm Library11/4/202611:00AM - 11:30 AM
    New Farm Library11/11/202611:00AM - 11:30 AM
    New Farm Library11/18/202611:00AM - 11:30 AM
    New Farm Library11/25/202611:00AM - 11:30 AM

    Nundah Library11/5/20269:30AM - 10:00 AM
    Nundah Library11/12/20269:30AM - 10:00 AM
    Nundah Library11/19/20269:30AM - 10:00 AM
    Nundah Library11/26/20269:30AM - 10:00 AM

    Sandgate Library11/6/202610:00AM - 10:30 AM
    Sandgate Library11/13/202610:00AM - 10:30 AM
    Sandgate Library11/20/202610:00AM - 10:30 AM
    Sandgate Library11/27/202610:00AM - 10:30 AM

    Stones Corner Library11/6/20269:30AM - 10:00 AM
    Stones Corner Library11/13/20269:30AM - 10:00 AM
    Stones Corner Library11/20/20269:30AM - 10:00 AM
    Stones Corner Library11/27/20269:30AM - 10:00 AM

    Sunnybank Hills Library11/2/202610:30AM- 11:00AM
    Sunnybank Hills Library11/9/202610:30AM- 11:00AM
    Sunnybank Hills Library11/16/202610:30AM- 11:00AM
    Sunnybank Hills Library11/23/202610:30AM- 11:00AM
    Sunnybank Hills Library11/30/202610:30AM- 11:00AM

    Toowong Library11/3/202611:30AM - 12:00PM
    Toowong Library11/10/202611:30AM - 12:00PM
    Toowong Library11/17/202611:30AM - 12:00PM
    Toowong Library11/24/202611:30AM - 12:00PM

    West End Library11/4/20269:15AM - 9:45 AM
    West End Library11/11/20269:15AM - 9:45 AM
    West End Library11/18/20269:15AM - 9:45 AM
    West End Library11/25/20269:15AM - 9:45 AM

    Wynnum Library11/6/20269:15AM - 9:45 AM
    Wynnum Library11/13/20269:15AM - 9:45 AM
    Wynnum Library11/20/20269:15AM - 9:45 AM
    Wynnum Library11/27/20269:15AM - 9:45 AM

    Zillmere Library11/5/202610:30AM- 11:00AM
    Zillmere Library11/12/202610:30AM- 11:00AM
    Zillmere Library11/19/202610:30AM- 11:00AM
    Zillmere Library11/26/202610:30AM- 11:00AM
  




Published 28-October-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Brisbane Metro Expansion Survey Opens as Residents Asked About Local Transport Problems]]></title>
<link>https://westendtoday.com.au/brisbane-metro-expansion-survey-opens-as-residents-asked-about-local-transport-problems/brisbane-metro-expansion-survey-opens-as-residents-asked-about-local-transport-problems</link>
<media:content url="https://westendtoday.com.au/wp-content/uploads/2026/10/Brisbane-Metro-FI-scaled.png" medium="image"/>
<media:thumbnail url="https://westendtoday.com.au/wp-content/uploads/2026/10/Brisbane-Metro-FI-scaled.png"/>
<enclosure url="https://westendtoday.com.au/wp-content/uploads/2026/10/Brisbane-Metro-FI-scaled.png" length="974874" type="image/png"/>
<pubDate>Wed, 28 Oct 2026 00:12:47 +0000</pubDate>
<dc:creator><![CDATA[West End Today]]></dc:creator>
<guid isPermaLink="true">https://westendtoday.com.au/brisbane-metro-expansion-survey-opens-as-residents-asked-about-local-transport-problems/</guid>
<description><![CDATA[


Brisbane residents are being invited to share their public transport concerns and suggest improvements as community consultation begins on proposed Metro expansions across the city's northern, eastern, southern and airport corridors.



Submissions close on Sunday, 13 December 2026, giving commuters an opportunity to describe difficulties with existing services and suggest improvements. Their feedback will help inform a business case examining how Brisbane Metro could reach more suburbs.



Four corridors bring different transport questions



The proposed Northern Metro would connect the CBD with Carseldine, extending services through Lutwyche, Kedron, Chermside and Aspley. Gympie Road has been identified as a potential corridor, raising questions about how dedicated bus infrastructure could improve journeys along one of Brisbane's major northern transport routes.



For residents in these suburbs, the consultation provides an opportunity to describe existing problems involving bus connections, journey reliability and access to public transport. Final station locations and the infrastructure needed for a northern extension remain undecided.



The Eastern Metro proposal would connect central Brisbane with Capalaba through the eastern suburbs, with Old Cleveland Road identified as a potential route. Commuters travelling through areas including Coorparoo could provide feedback about existing services, transfers and difficulties encountered during their journeys.



South of the city, the proposed Southern Metro would connect the CBD with Springwood, complementing the South East Busway extension and linking with the existing M1 service at Eight Mile Plains busway station.



The fourth corridor would create express Metro connections between Brisbane Airport's domestic and international terminals and the CBD. Planning will examine how those services could fit into the wider public transport network.



All four corridors remain proposals, with their potential alignments and infrastructure needs to be examined through the business case.



Photo Credit: BCC



Population growth adds pressure to existing routes



Council forecasts substantial population growth along the three residential corridors over the next 20 years.



Its projections indicate increases of 60 per cent along the CBD-to-Carseldine corridor, 29 per cent towards Capalaba and 96 per cent towards Springwood. Approximately 88,000 additional residents are expected in areas surrounding those corridors.



Brisbane's latest expansion proposals also revisit ambitions from the South East Queensland Integrated Regional Transport Plan developed in the 1990s. The earlier plan proposed approximately 75 kilometres of busways, but only about 25 kilometres were ultimately built.



Infrastructure Australia has identified the Metro expansion as an early-stage investment proposal that could improve public transport capacity, interchange connections and service reliability. Potential benefits remain subject to further planning and assessment.



Council wants to hear where journeys fall short



The consultation focuses on residents' current travel experiences and suggestions for improving bus services along the proposed corridors, rather than asking them to comment on completed designs.



Issues such as unreliable travel times, inconvenient transfers, access to stops and gaps in service coverage could be raised by residents. Council has not indicated that participants will be able to vote on final station locations or select specific route alignments.



The consultation follows the introduction of Brisbane Metro's M1 and M2 services in 2025, alongside changes to the city's wider bus network. Council is now investigating how similar high-capacity services could operate beyond the existing network.



LM Adrian Schrinner has encouraged residents to contribute to the expansion plans, arguing that the Metro model should be extended into other parts of Brisbane.



Civic Cabinet Chair for Transport Cr Andrew Wines has also sought feedback from regular passengers and people who would consider using public transport if better services were available.







Construction funding and 2032 timetable remain uncertain



Brisbane City Council is working with the Queensland and Australian governments on the Brisbane Metro Expansions Business Case, with Jacobs Group (Australia) engaged to undertake the work.



The business case will investigate possible route alignments, depot locations, network improvements, infrastructure requirements and the order in which different sections could be delivered.



The Australian Government has committed $50 million to support development of the final business case and related expansion planning. However, construction funding for the proposed corridors has not been secured, and major infrastructure works would require substantial additional investment.



Mr Schrinner has declined to guarantee that any of the proposed extensions will be completed before the Brisbane 2032 Olympic and Paralympic Games.



The distinction between long-term expansion plans and present-day transport needs has also attracted criticism. Opposition Leader Cr Jared Cassidy has called for more suburban bus services now, rather than waiting years for major infrastructure projects.



Council expects the expansion business case to be completed in late 2027. Any subsequent construction would depend on funding availability, relevant approvals and decisions about which sections should proceed.



How residents can have their say



The survey is open until Sunday, 13 December 2026. Council has also provided an option for residents to register for project updates as the business case progresses.




HAVE YOUR SAY










.bson-metro-box {
  box-sizing: border-box;
  max-width: 100%;
  padding: 20px;
  margin: 24px 0;
  border: 1px solid #d5dee8;
  border-left: 4px solid #235b87;
  border-radius: 6px;
  background: #f6f9fc;
  color: #1e293b;
  font-family: inherit;
  line-height: 1.6;
}
.bson-metro-box * { box-sizing: border-box; }
.bson-metro-box h3 {
  margin: 0 0 12px;
  font-size: 1.3rem;
  line-height: 1.35;
  color: #163c5c;
}
.bson-metro-box p { margin: 0 0 12px; }
.bson-metro-box ul {
  margin: 8px 0 16px;
  padding-left: 22px;
}
.bson-metro-box li { margin: 4px 0; }
.bson-metro-box a.bson-metro-link {
  display: inline-block;
  max-width: 100%;
  padding: 10px 15px;
  border-radius: 4px;
  background: #235b87;
  color: #fff;
  font-weight: 700;
  text-decoration: none;
  overflow-wrap: anywhere;
}
.bson-metro-box a.bson-metro-link:hover,
.bson-metro-box a.bson-metro-link:focus {
  background: #163c5c;
  color: #fff;
  text-decoration: underline;
}
.bson-metro-box .bson-metro-note {
  margin: 12px 0 0;
  font-size: .87rem;
  color: #475569;
}
@media (max-width: 480px) {
  .bson-metro-box { padding: 15px; }
  .bson-metro-box h3 { font-size: 1.15rem; }
  .bson-metro-box a.bson-metro-link {
    display: block;
    text-align: center;
  }
}



  Have Your Say on Brisbane Metro

  Survey closes:
  Sunday, 13 December 2026

  Brisbane City Council is seeking feedback
  about current travel experiences and
  potential bus network improvements.

  Proposed expansion corridors:
  
    Northern: CBD to Carseldine
    Eastern: CBD to Capalaba
    Southern: CBD to Springwood
    Airport: CBD to Brisbane Airport
  

  
    
      View Consultation and Survey
    
  

  
    The proposed corridors remain subject to
    the business case, funding and approvals.
    No final routes or construction timetable
    have been confirmed.
  





The&nbsp;online community survey&nbsp;can be accessed directly, while questions about the project can be sent to&nbsp;metroexpansions@brisbane.qld.gov.au.



Feedback gathered during the consultation will contribute to the business case, which is expected to provide more detailed information about potential routes, infrastructure requirements and delivery stages in late 2027.



Published 28-Oct-2026



Featured Image Credit: Wikipedia/Kyethepie21/CC0




]]></description>
<content:encoded><![CDATA[


Brisbane residents are being invited to share their public transport concerns and suggest improvements as community consultation begins on proposed Metro expansions across the city's northern, eastern, southern and airport corridors.



Submissions close on Sunday, 13 December 2026, giving commuters an opportunity to describe difficulties with existing services and suggest improvements. Their feedback will help inform a business case examining how Brisbane Metro could reach more suburbs.



Four corridors bring different transport questions



The proposed Northern Metro would connect the CBD with Carseldine, extending services through Lutwyche, Kedron, Chermside and Aspley. Gympie Road has been identified as a potential corridor, raising questions about how dedicated bus infrastructure could improve journeys along one of Brisbane's major northern transport routes.



For residents in these suburbs, the consultation provides an opportunity to describe existing problems involving bus connections, journey reliability and access to public transport. Final station locations and the infrastructure needed for a northern extension remain undecided.



The Eastern Metro proposal would connect central Brisbane with Capalaba through the eastern suburbs, with Old Cleveland Road identified as a potential route. Commuters travelling through areas including Coorparoo could provide feedback about existing services, transfers and difficulties encountered during their journeys.



South of the city, the proposed Southern Metro would connect the CBD with Springwood, complementing the South East Busway extension and linking with the existing M1 service at Eight Mile Plains busway station.



The fourth corridor would create express Metro connections between Brisbane Airport's domestic and international terminals and the CBD. Planning will examine how those services could fit into the wider public transport network.



All four corridors remain proposals, with their potential alignments and infrastructure needs to be examined through the business case.



Photo Credit: BCC



Population growth adds pressure to existing routes



Council forecasts substantial population growth along the three residential corridors over the next 20 years.



Its projections indicate increases of 60 per cent along the CBD-to-Carseldine corridor, 29 per cent towards Capalaba and 96 per cent towards Springwood. Approximately 88,000 additional residents are expected in areas surrounding those corridors.



Brisbane's latest expansion proposals also revisit ambitions from the South East Queensland Integrated Regional Transport Plan developed in the 1990s. The earlier plan proposed approximately 75 kilometres of busways, but only about 25 kilometres were ultimately built.



Infrastructure Australia has identified the Metro expansion as an early-stage investment proposal that could improve public transport capacity, interchange connections and service reliability. Potential benefits remain subject to further planning and assessment.



Council wants to hear where journeys fall short



The consultation focuses on residents' current travel experiences and suggestions for improving bus services along the proposed corridors, rather than asking them to comment on completed designs.



Issues such as unreliable travel times, inconvenient transfers, access to stops and gaps in service coverage could be raised by residents. Council has not indicated that participants will be able to vote on final station locations or select specific route alignments.



The consultation follows the introduction of Brisbane Metro's M1 and M2 services in 2025, alongside changes to the city's wider bus network. Council is now investigating how similar high-capacity services could operate beyond the existing network.



LM Adrian Schrinner has encouraged residents to contribute to the expansion plans, arguing that the Metro model should be extended into other parts of Brisbane.



Civic Cabinet Chair for Transport Cr Andrew Wines has also sought feedback from regular passengers and people who would consider using public transport if better services were available.







Construction funding and 2032 timetable remain uncertain



Brisbane City Council is working with the Queensland and Australian governments on the Brisbane Metro Expansions Business Case, with Jacobs Group (Australia) engaged to undertake the work.



The business case will investigate possible route alignments, depot locations, network improvements, infrastructure requirements and the order in which different sections could be delivered.



The Australian Government has committed $50 million to support development of the final business case and related expansion planning. However, construction funding for the proposed corridors has not been secured, and major infrastructure works would require substantial additional investment.



Mr Schrinner has declined to guarantee that any of the proposed extensions will be completed before the Brisbane 2032 Olympic and Paralympic Games.



The distinction between long-term expansion plans and present-day transport needs has also attracted criticism. Opposition Leader Cr Jared Cassidy has called for more suburban bus services now, rather than waiting years for major infrastructure projects.



Council expects the expansion business case to be completed in late 2027. Any subsequent construction would depend on funding availability, relevant approvals and decisions about which sections should proceed.



How residents can have their say



The survey is open until Sunday, 13 December 2026. Council has also provided an option for residents to register for project updates as the business case progresses.




HAVE YOUR SAY










.bson-metro-box {
  box-sizing: border-box;
  max-width: 100%;
  padding: 20px;
  margin: 24px 0;
  border: 1px solid #d5dee8;
  border-left: 4px solid #235b87;
  border-radius: 6px;
  background: #f6f9fc;
  color: #1e293b;
  font-family: inherit;
  line-height: 1.6;
}
.bson-metro-box * { box-sizing: border-box; }
.bson-metro-box h3 {
  margin: 0 0 12px;
  font-size: 1.3rem;
  line-height: 1.35;
  color: #163c5c;
}
.bson-metro-box p { margin: 0 0 12px; }
.bson-metro-box ul {
  margin: 8px 0 16px;
  padding-left: 22px;
}
.bson-metro-box li { margin: 4px 0; }
.bson-metro-box a.bson-metro-link {
  display: inline-block;
  max-width: 100%;
  padding: 10px 15px;
  border-radius: 4px;
  background: #235b87;
  color: #fff;
  font-weight: 700;
  text-decoration: none;
  overflow-wrap: anywhere;
}
.bson-metro-box a.bson-metro-link:hover,
.bson-metro-box a.bson-metro-link:focus {
  background: #163c5c;
  color: #fff;
  text-decoration: underline;
}
.bson-metro-box .bson-metro-note {
  margin: 12px 0 0;
  font-size: .87rem;
  color: #475569;
}
@media (max-width: 480px) {
  .bson-metro-box { padding: 15px; }
  .bson-metro-box h3 { font-size: 1.15rem; }
  .bson-metro-box a.bson-metro-link {
    display: block;
    text-align: center;
  }
}



  Have Your Say on Brisbane Metro

  Survey closes:
  Sunday, 13 December 2026

  Brisbane City Council is seeking feedback
  about current travel experiences and
  potential bus network improvements.

  Proposed expansion corridors:
  
    Northern: CBD to Carseldine
    Eastern: CBD to Capalaba
    Southern: CBD to Springwood
    Airport: CBD to Brisbane Airport
  

  
    
      View Consultation and Survey
    
  

  
    The proposed corridors remain subject to
    the business case, funding and approvals.
    No final routes or construction timetable
    have been confirmed.
  





The&nbsp;online community survey&nbsp;can be accessed directly, while questions about the project can be sent to&nbsp;metroexpansions@brisbane.qld.gov.au.



Feedback gathered during the consultation will contribute to the business case, which is expected to provide more detailed information about potential routes, infrastructure requirements and delivery stages in late 2027.



Published 28-Oct-2026



Featured Image Credit: Wikipedia/Kyethepie21/CC0




]]></content:encoded>
</item><item>
<title><![CDATA[Queensland’s Smoke Alarm Deadline Is Near — Is Your Family Really Protected?]]></title>
<link>https://westendtoday.com.au/queensland-smoke-alarm-deadline-2027-home-safety/queensland-smoke-alarm-deadline-2027-home-safety</link>
<media:content url="https://westendtoday.com.au/wp-content/uploads/2026/11/Brooks-Kenmore-1-scaled.jpeg" medium="image"/>
<media:thumbnail url="https://westendtoday.com.au/wp-content/uploads/2026/11/Brooks-Kenmore-1-scaled.jpeg"/>
<enclosure url="https://westendtoday.com.au/wp-content/uploads/2026/11/Brooks-Kenmore-1-scaled.jpeg" length="117335" type="image/jpeg"/>
<pubDate>Wed, 11 Nov 2026 10:18:44 +0000</pubDate>
<dc:creator><![CDATA[West End Today]]></dc:creator>
<guid isPermaLink="true">https://westendtoday.com.au/queensland-smoke-alarm-deadline-2027-home-safety/</guid>
<description><![CDATA[




By Cathy Brand | Fire Safety Advocate and CEO of Brooks Australia



A Queensland homeowner could have several working smoke alarms throughout their property and still fall short of the state's requirements when the final stage of its smoke alarm reforms takes effect on 1 January 2027.



The changes go well beyond replacing ageing devices. They affect where alarms must be installed, how they communicate with one another and the type of technology permitted. For households that have relied on the same arrangement for years, becoming compliant may involve a more substantial upgrade than expected.



With just over two months remaining, the approaching deadline also presents an opportunity to consider whether the warning system provides everyone in the home with the best possible chance of escaping a fire.



A decade of reform reaches its final deadline



Queensland's smoke alarm reforms have been introduced progressively over the past decade, beginning with new homes and substantial renovations in 2017. Properties being sold or leased were required to meet the upgraded standards from January 2022, while the final stage, commencing on 1 January 2027, applies to the remaining domestic dwellings.




  
    .cb-history-box,
    .cb-history-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-history-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px 26px;
      background: #f5f6f7;
      border: 1px solid #d9dee2;
      border-left: 5px solid #40566a;
      border-radius: 7px;
      color: #26323b;
      font: 16px/1.65 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-history-box h3 {
      margin: 0 0 17px;
      color: #203b50;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
      hyphens: none;
    }

    .cb-history-box p {
      margin: 0 0 14px;
      line-height: 1.65;
      hyphens: none;
    }

    .cb-history-box p:last-child {
      margin-bottom: 0;
    }

    .cb-history-box strong {
      color: #203b50;
    }

    .cb-history-box a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-history-box a:hover,
    .cb-history-box a:focus {
      color: #40566a;
    }

    @media (max-width: 600px) {
      .cb-history-box {
        padding: 19px 16px;
        margin: 22px 0;
        font-size: 15px;
      }

      .cb-history-box h3 {
        font-size: 19px;
      }
    }
  

  The Slacks Creek Tragedy That Changed Queensland's Smoke Alarm Laws

  
    On 24 August 2011, a house fire at Slacks Creek,
    south of Brisbane, claimed 11 lives, including
    eight children. The disaster became
    a defining tragedy in Queensland's
    approach to residential fire safety,
    ultimately helping drive some of the country's
    most significant smoke alarm reforms.
  

  
    The coronial inquest, whose findings were
    delivered on 28 November 2014, examined
    the failure of the home's smoke alarms.
    The coroner concluded there was a reasonable
    prospect that some or all of those who died
    could have escaped had the alarms been working.
  

  
    The coroner's recommendations helped shape
    sweeping changes to Queensland's smoke alarm
    laws. Legislation passed in 2016 introduced
    a ten-year transition towards photoelectric,
    interconnected alarms installed in bedrooms,
    connecting hallways and on every storey.
  

  
    The reforms began taking effect in January 2017,
    with the final stage due on 1 January 2027.
  

  
    The changes reflect a fundamental lesson from
    the tragedy: providing an earlier warning
    throughout a home can give occupants more
    time to escape.
  




The legislation requires photoelectric smoke alarms complying with Australian Standard AS 3786:2014, without an ionisation sensor. They must be less than ten years old, operate when tested and be interconnected so that when one alarm activates, all connected alarms sound.



Placement is equally important. Alarms are required in every bedroom, in hallways connecting bedrooms to the rest of the dwelling and on each storey, with additional provisions for levels without bedrooms. A home with functioning alarms in its hallways, for example, may still need additional units inside bedrooms to satisfy the requirements.



One common misconception is that compliance necessarily involves extensive rewiring. Queensland permits compliant alarms powered by non-removable ten-year batteries in existing dwellings where appropriate, and wireless interconnection can provide an alternative to running interconnect cables throughout a property.



However, an existing hardwired smoke alarm must be replaced with another hardwired unit, with the electrical work undertaken by a licensed electrician. New homes and substantial renovations have separate hardwiring requirements. Depending on the home's existing installation, a combination of hardwired and compatible wireless interconnected alarms may also be suitable.





  
    .cb-compliance-box,
    .cb-compliance-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-compliance-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px;
      background: #fff7f8;
      border: 1px solid #e8cbd1;
      border-left: 5px solid #CF0A2C;
      border-radius: 7px;
      color: #2E2A25;
      font: 16px/1.55 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-box h3 {
      margin: 0 0 12px;
      color: #CF0A2C;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-box .cb-intro {
      margin: 0 0 19px;
      line-height: 1.6;
    }

    .cb-compliance-grid {
      display: grid;
      grid-template-columns: repeat(2, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-compliance-item {
      min-width: 0;
      padding: 14px 15px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-item strong {
      display: block;
      margin-bottom: 5px;
      color: #CF0A2C;
      font-size: 15px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-item p {
      margin: 0;
      color: #2E2A25;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-install-section {
      margin-top: 24px;
      padding-top: 19px;
      border-top: 2px solid #e8cbd1;
    }

    .cb-install-section h4 {
      margin: 0 0 8px;
      color: #CF0A2C;
      font-size: 19px;
      line-height: 1.35;
      font-weight: 700;
    }

    .cb-install-intro {
      margin: 0 0 15px;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-install-grid {
      display: grid;
      grid-template-columns: repeat(3, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-install-item {
      min-width: 0;
      padding: 14px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
    }

    .cb-install-item strong {
      display: block;
      margin-bottom: 7px;
      color: #CF0A2C;
      font-size: 15px;
      line-height: 1.4;
    }

    .cb-install-item p {
      margin: 0;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-compliance-note {
      margin: 20px 0 0;
      padding-top: 14px;
      border-top: 1px solid #e8cbd1;
      color: #403a37;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-compliance-note strong {
      color: #CF0A2C;
    }

    @media (max-width: 650px) {
      .cb-compliance-box {
        padding: 18px 15px;
        margin: 22px 0;
      }

      .cb-compliance-box h3 {
        font-size: 19px;
      }

      .cb-compliance-grid,
      .cb-install-grid {
        grid-template-columns: minmax(0, 1fr);
        gap: 9px;
      }

      .cb-compliance-item,
      .cb-install-item {
        padding: 12px 13px;
      }

      .cb-install-section h4 {
        font-size: 18px;
      }

      .cb-compliance-note {
        font-size: 13px;
      }
    }
  

  
    Queensland's 2027 Smoke Alarm Rules:
    A Homeowner's Checklist
  

  
    By 1 January 2027, all remaining private homes,
    townhouses and units in Queensland must comply
    with the state's upgraded smoke alarm requirements.
  

  

    
      Alarm type
      
        Required alarms must be photoelectric,
        comply with AS 3786:2014 and contain
        no ionisation sensor.
      
    

    
      Age
      
        Alarms must be less than ten years old
        from their manufacture date.
      
    

    
      Interconnection
      
        All required alarms must be interconnected
        so that when one activates, they all sound.
      
    

    
      Bedrooms
      
        An alarm must be installed in every bedroom.
      
    

    
      Hallways
      
        Alarms must be installed in hallways connecting
        bedrooms to the rest of the dwelling. Where
        there is no hallway, an alarm must be installed
        between the bedrooms and other parts
        of the storey.
      
    

    
      Every storey
      
        Each level requires appropriate coverage.
        On storeys without bedrooms, an alarm must
        be installed in the most likely path of
        travel to an exit.
      
    

    
      Power source
      
        Alarms must be hardwired or use a
        non-removable ten-year battery, as permitted
        for the property. New homes and substantial
        renovations require hardwired alarms.
      
    

    
      Hardwired replacements
      
        Existing 240V hardwired smoke alarms must
        be replaced with compliant hardwired
        photoelectric alarms, not battery-only models.
        A licensed electrician must carry out
        the electrical replacement.
      
    

    
      Operation
      
        All alarms must work when tested.
      
    

  

  

    Who Can Install Your Smoke Alarms?

    
      Queensland law does not require every smoke
      alarm to be installed by an electrician.
      The requirements depend on the alarm's
      power source and whether electrical work
      is involved.
    

    

      
        1. New hardwired alarms
        
          A licensed electrician is required
          to install 240V hardwired smoke alarms.
          This includes electrical wiring and
          connections to mains power.
        
      

      
        2. Battery-powered alarms
        
          Homeowners can generally install compliant
          photoelectric alarms powered by non-removable
          ten-year batteries themselves, provided
          no electrical work is required. All alarms
          must be correctly positioned and interconnected
          in accordance with Queensland's prescribed
          placement distances and installation requirements.
        
      

      
        3. Replacing hardwired alarms
        
          Existing 240V hardwired smoke alarms
          must be replaced with compliant
          hardwired photoelectric alarms,
          not battery-only models.
          A licensed electrician must carry
          out the electrical replacement.
        
      

    

  

  
    Important:
    Smoke alarm placement and power-source requirements
    depend on the dwelling's layout and existing
    installation. Consult the
    
      Queensland Fire Department's official guidance
    
    or a suitably qualified installer if uncertain.
  






A fire doesn't wait for smoke to reach your bedroom



A fire may begin in a part of the house far removed from where occupants are sleeping. In a conventional arrangement of independent alarms, someone at the opposite end of the property may not receive a warning until smoke reaches an alarm closer to their bedroom.



Interconnected alarms address that delay by activating throughout the home when any one of the connected devices detects smoke.



The practical importance becomes particularly clear in larger houses, multi-storey properties and homes where bedroom doors are kept closed overnight. A fire starting in one sleeping area can trigger alarms elsewhere, alerting other occupants who may be able to assist.



In my own home, our bedroom is at one end of the house and our children's bedrooms are at the other. They sleep with their doors closed, as many children do. If a fire were to start in one of their rooms, I would want to know immediately, rather than wait for smoke to reach an alarm closer to where we sleep.



That is why interconnection matters. We want the warning travelling through the house faster than the smoke, giving everyone the earliest possible opportunity to respond.



The last-minute rush Queenslanders could do without



Despite years of public information campaigns, awareness of the legislation has not necessarily translated into completed installations.



The Queensland Fire Department's 2025 Community Insights Survey found that 72 per cent of respondents were aware of the interconnected smoke alarm legislation, but only 54 per cent knew about the 1 January 2027 deadline. At the time of the survey, 52 per cent reported having interconnected alarms installed.



These figures reflect what respondents reported rather than independently verified compliance, but they indicate that a substantial number of Queensland households may still need to review their arrangements.



A concentrated rush in the final weeks could also place pressure on product availability and electrician appointments. While shortages are not inevitable, households that act earlier have more time to understand their options, obtain advice and arrange any necessary installation work.



An initial assessment need not be complicated. Homeowners can begin by checking the location and manufacture date of their existing alarms, confirming whether they are photoelectric and interconnected, and testing that they operate correctly. They should also establish whether every required sleeping area and storey has appropriate coverage.



For households with existing hardwired systems, advice from a licensed electrician can help determine what needs replacing and how additional alarms can be incorporated.



A compliant home isn't necessarily a safer home for everyone



Queensland's legislation establishes a minimum standard for residential smoke alarm protection, but the circumstances of the people living in each home can be just as important as the building itself.



An audible warning, for example, may not be sufficient for someone who is deaf or hard of hearing, while a person with limited mobility may require additional time or assistance to evacuate. These considerations do not change the legal requirements, but they can influence whether a household needs supplementary warning equipment or other safety arrangements.



Families should also develop and practise an escape plan that accounts for the needs of everyone living in the home, including children, older residents and people who may require assistance. Installing compliant alarms is important, but knowing how to respond when they sound is another essential part of household fire safety.



Homeowners who have yet to complete their upgrades should begin by reviewing their existing alarms, checking the requirements for their property and arranging professional advice where needed. Leaving the work until the final weeks of December may unnecessarily limit their options.



Queensland's smoke alarm reforms were introduced to improve the warning people receive when fire breaks out at home. Meeting the requirements before 1 January 2027 is an important step, but the greater responsibility is ensuring that everyone in the household knows what to do when those alarms sound.




  
    .cb-author-box,
    .cb-author-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-author-box {
      width: 100%;
      max-width: 100%;
      margin: 30px 0;
      padding: 23px;
      background: #f7f8f9;
      border: 1px solid #dce1e5;
      border-radius: 7px;
      color: #283740;
      font: 15px/1.6 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      hyphens: none;
    }

    .cb-author-main {
      display: grid;
      grid-template-columns: 145px minmax(0, 1fr);
      gap: 22px;
      align-items: start;
    }

    .cb-author-photo {
      width: 145px;
      max-width: 100%;
      height: auto;
      display: block;
      border-radius: 5px;
      object-fit: contain;
    }

    .cb-author-copy h3 {
      margin: 0 0 10px;
      color: #203b50;
      font-size: 21px;
      line-height: 1.3;
      font-weight: 700;
    }

    .cb-author-copy p {
      margin: 0;
      line-height: 1.65;
    }

    .cb-author-copy a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-author-copy a:hover,
    .cb-author-copy a:focus {
      color: #40566a;
    }

    .cb-author-box .cb-series-note {
      margin: 19px 0 0;
      padding: 13px 0 0;
      border-top: 1px solid #dce1e5;
      color: #586670;
      font-size: 13px;
      line-height: 1.6;
      font-style: italic;
    }

    @media (max-width: 600px) {
      .cb-author-box {
        padding: 19px 16px;
        margin: 24px 0;
      }

      .cb-author-main {
        grid-template-columns: minmax(0, 1fr);
        gap: 15px;
      }

      .cb-author-photo {
        width: 150px;
        max-width: 65%;
        height: auto;
        margin: 0 auto;
      }

      .cb-author-copy h3 {
        font-size: 20px;
      }
    }
  

  

    
      
    

    
      About Cathy Brand

      
        Cathy Brand is the Chief
        Executive Officer of
        Brooks Australia,
        a provider of fire detection and warning
        technology. Through her work in the fire
        safety industry, she advocates for greater
        awareness of residential fire protection,
        interconnected smoke alarm systems and
        solutions that consider the needs of
        different households.
      
    

  

  
    Home Fire Safety with Cathy Brand is a five-part
    sponsored editorial series presented in
    partnership with Brooks Australia.
  




Published 27-October-2026




]]></description>
<content:encoded><![CDATA[




By Cathy Brand | Fire Safety Advocate and CEO of Brooks Australia



A Queensland homeowner could have several working smoke alarms throughout their property and still fall short of the state's requirements when the final stage of its smoke alarm reforms takes effect on 1 January 2027.



The changes go well beyond replacing ageing devices. They affect where alarms must be installed, how they communicate with one another and the type of technology permitted. For households that have relied on the same arrangement for years, becoming compliant may involve a more substantial upgrade than expected.



With just over two months remaining, the approaching deadline also presents an opportunity to consider whether the warning system provides everyone in the home with the best possible chance of escaping a fire.



A decade of reform reaches its final deadline



Queensland's smoke alarm reforms have been introduced progressively over the past decade, beginning with new homes and substantial renovations in 2017. Properties being sold or leased were required to meet the upgraded standards from January 2022, while the final stage, commencing on 1 January 2027, applies to the remaining domestic dwellings.




  
    .cb-history-box,
    .cb-history-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-history-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px 26px;
      background: #f5f6f7;
      border: 1px solid #d9dee2;
      border-left: 5px solid #40566a;
      border-radius: 7px;
      color: #26323b;
      font: 16px/1.65 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-history-box h3 {
      margin: 0 0 17px;
      color: #203b50;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
      hyphens: none;
    }

    .cb-history-box p {
      margin: 0 0 14px;
      line-height: 1.65;
      hyphens: none;
    }

    .cb-history-box p:last-child {
      margin-bottom: 0;
    }

    .cb-history-box strong {
      color: #203b50;
    }

    .cb-history-box a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-history-box a:hover,
    .cb-history-box a:focus {
      color: #40566a;
    }

    @media (max-width: 600px) {
      .cb-history-box {
        padding: 19px 16px;
        margin: 22px 0;
        font-size: 15px;
      }

      .cb-history-box h3 {
        font-size: 19px;
      }
    }
  

  The Slacks Creek Tragedy That Changed Queensland's Smoke Alarm Laws

  
    On 24 August 2011, a house fire at Slacks Creek,
    south of Brisbane, claimed 11 lives, including
    eight children. The disaster became
    a defining tragedy in Queensland's
    approach to residential fire safety,
    ultimately helping drive some of the country's
    most significant smoke alarm reforms.
  

  
    The coronial inquest, whose findings were
    delivered on 28 November 2014, examined
    the failure of the home's smoke alarms.
    The coroner concluded there was a reasonable
    prospect that some or all of those who died
    could have escaped had the alarms been working.
  

  
    The coroner's recommendations helped shape
    sweeping changes to Queensland's smoke alarm
    laws. Legislation passed in 2016 introduced
    a ten-year transition towards photoelectric,
    interconnected alarms installed in bedrooms,
    connecting hallways and on every storey.
  

  
    The reforms began taking effect in January 2017,
    with the final stage due on 1 January 2027.
  

  
    The changes reflect a fundamental lesson from
    the tragedy: providing an earlier warning
    throughout a home can give occupants more
    time to escape.
  




The legislation requires photoelectric smoke alarms complying with Australian Standard AS 3786:2014, without an ionisation sensor. They must be less than ten years old, operate when tested and be interconnected so that when one alarm activates, all connected alarms sound.



Placement is equally important. Alarms are required in every bedroom, in hallways connecting bedrooms to the rest of the dwelling and on each storey, with additional provisions for levels without bedrooms. A home with functioning alarms in its hallways, for example, may still need additional units inside bedrooms to satisfy the requirements.



One common misconception is that compliance necessarily involves extensive rewiring. Queensland permits compliant alarms powered by non-removable ten-year batteries in existing dwellings where appropriate, and wireless interconnection can provide an alternative to running interconnect cables throughout a property.



However, an existing hardwired smoke alarm must be replaced with another hardwired unit, with the electrical work undertaken by a licensed electrician. New homes and substantial renovations have separate hardwiring requirements. Depending on the home's existing installation, a combination of hardwired and compatible wireless interconnected alarms may also be suitable.





  
    .cb-compliance-box,
    .cb-compliance-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-compliance-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px;
      background: #fff7f8;
      border: 1px solid #e8cbd1;
      border-left: 5px solid #CF0A2C;
      border-radius: 7px;
      color: #2E2A25;
      font: 16px/1.55 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-box h3 {
      margin: 0 0 12px;
      color: #CF0A2C;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-box .cb-intro {
      margin: 0 0 19px;
      line-height: 1.6;
    }

    .cb-compliance-grid {
      display: grid;
      grid-template-columns: repeat(2, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-compliance-item {
      min-width: 0;
      padding: 14px 15px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-item strong {
      display: block;
      margin-bottom: 5px;
      color: #CF0A2C;
      font-size: 15px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-item p {
      margin: 0;
      color: #2E2A25;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-install-section {
      margin-top: 24px;
      padding-top: 19px;
      border-top: 2px solid #e8cbd1;
    }

    .cb-install-section h4 {
      margin: 0 0 8px;
      color: #CF0A2C;
      font-size: 19px;
      line-height: 1.35;
      font-weight: 700;
    }

    .cb-install-intro {
      margin: 0 0 15px;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-install-grid {
      display: grid;
      grid-template-columns: repeat(3, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-install-item {
      min-width: 0;
      padding: 14px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
    }

    .cb-install-item strong {
      display: block;
      margin-bottom: 7px;
      color: #CF0A2C;
      font-size: 15px;
      line-height: 1.4;
    }

    .cb-install-item p {
      margin: 0;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-compliance-note {
      margin: 20px 0 0;
      padding-top: 14px;
      border-top: 1px solid #e8cbd1;
      color: #403a37;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-compliance-note strong {
      color: #CF0A2C;
    }

    @media (max-width: 650px) {
      .cb-compliance-box {
        padding: 18px 15px;
        margin: 22px 0;
      }

      .cb-compliance-box h3 {
        font-size: 19px;
      }

      .cb-compliance-grid,
      .cb-install-grid {
        grid-template-columns: minmax(0, 1fr);
        gap: 9px;
      }

      .cb-compliance-item,
      .cb-install-item {
        padding: 12px 13px;
      }

      .cb-install-section h4 {
        font-size: 18px;
      }

      .cb-compliance-note {
        font-size: 13px;
      }
    }
  

  
    Queensland's 2027 Smoke Alarm Rules:
    A Homeowner's Checklist
  

  
    By 1 January 2027, all remaining private homes,
    townhouses and units in Queensland must comply
    with the state's upgraded smoke alarm requirements.
  

  

    
      Alarm type
      
        Required alarms must be photoelectric,
        comply with AS 3786:2014 and contain
        no ionisation sensor.
      
    

    
      Age
      
        Alarms must be less than ten years old
        from their manufacture date.
      
    

    
      Interconnection
      
        All required alarms must be interconnected
        so that when one activates, they all sound.
      
    

    
      Bedrooms
      
        An alarm must be installed in every bedroom.
      
    

    
      Hallways
      
        Alarms must be installed in hallways connecting
        bedrooms to the rest of the dwelling. Where
        there is no hallway, an alarm must be installed
        between the bedrooms and other parts
        of the storey.
      
    

    
      Every storey
      
        Each level requires appropriate coverage.
        On storeys without bedrooms, an alarm must
        be installed in the most likely path of
        travel to an exit.
      
    

    
      Power source
      
        Alarms must be hardwired or use a
        non-removable ten-year battery, as permitted
        for the property. New homes and substantial
        renovations require hardwired alarms.
      
    

    
      Hardwired replacements
      
        Existing 240V hardwired smoke alarms must
        be replaced with compliant hardwired
        photoelectric alarms, not battery-only models.
        A licensed electrician must carry out
        the electrical replacement.
      
    

    
      Operation
      
        All alarms must work when tested.
      
    

  

  

    Who Can Install Your Smoke Alarms?

    
      Queensland law does not require every smoke
      alarm to be installed by an electrician.
      The requirements depend on the alarm's
      power source and whether electrical work
      is involved.
    

    

      
        1. New hardwired alarms
        
          A licensed electrician is required
          to install 240V hardwired smoke alarms.
          This includes electrical wiring and
          connections to mains power.
        
      

      
        2. Battery-powered alarms
        
          Homeowners can generally install compliant
          photoelectric alarms powered by non-removable
          ten-year batteries themselves, provided
          no electrical work is required. All alarms
          must be correctly positioned and interconnected
          in accordance with Queensland's prescribed
          placement distances and installation requirements.
        
      

      
        3. Replacing hardwired alarms
        
          Existing 240V hardwired smoke alarms
          must be replaced with compliant
          hardwired photoelectric alarms,
          not battery-only models.
          A licensed electrician must carry
          out the electrical replacement.
        
      

    

  

  
    Important:
    Smoke alarm placement and power-source requirements
    depend on the dwelling's layout and existing
    installation. Consult the
    
      Queensland Fire Department's official guidance
    
    or a suitably qualified installer if uncertain.
  






A fire doesn't wait for smoke to reach your bedroom



A fire may begin in a part of the house far removed from where occupants are sleeping. In a conventional arrangement of independent alarms, someone at the opposite end of the property may not receive a warning until smoke reaches an alarm closer to their bedroom.



Interconnected alarms address that delay by activating throughout the home when any one of the connected devices detects smoke.



The practical importance becomes particularly clear in larger houses, multi-storey properties and homes where bedroom doors are kept closed overnight. A fire starting in one sleeping area can trigger alarms elsewhere, alerting other occupants who may be able to assist.



In my own home, our bedroom is at one end of the house and our children's bedrooms are at the other. They sleep with their doors closed, as many children do. If a fire were to start in one of their rooms, I would want to know immediately, rather than wait for smoke to reach an alarm closer to where we sleep.



That is why interconnection matters. We want the warning travelling through the house faster than the smoke, giving everyone the earliest possible opportunity to respond.



The last-minute rush Queenslanders could do without



Despite years of public information campaigns, awareness of the legislation has not necessarily translated into completed installations.



The Queensland Fire Department's 2025 Community Insights Survey found that 72 per cent of respondents were aware of the interconnected smoke alarm legislation, but only 54 per cent knew about the 1 January 2027 deadline. At the time of the survey, 52 per cent reported having interconnected alarms installed.



These figures reflect what respondents reported rather than independently verified compliance, but they indicate that a substantial number of Queensland households may still need to review their arrangements.



A concentrated rush in the final weeks could also place pressure on product availability and electrician appointments. While shortages are not inevitable, households that act earlier have more time to understand their options, obtain advice and arrange any necessary installation work.



An initial assessment need not be complicated. Homeowners can begin by checking the location and manufacture date of their existing alarms, confirming whether they are photoelectric and interconnected, and testing that they operate correctly. They should also establish whether every required sleeping area and storey has appropriate coverage.



For households with existing hardwired systems, advice from a licensed electrician can help determine what needs replacing and how additional alarms can be incorporated.



A compliant home isn't necessarily a safer home for everyone



Queensland's legislation establishes a minimum standard for residential smoke alarm protection, but the circumstances of the people living in each home can be just as important as the building itself.



An audible warning, for example, may not be sufficient for someone who is deaf or hard of hearing, while a person with limited mobility may require additional time or assistance to evacuate. These considerations do not change the legal requirements, but they can influence whether a household needs supplementary warning equipment or other safety arrangements.



Families should also develop and practise an escape plan that accounts for the needs of everyone living in the home, including children, older residents and people who may require assistance. Installing compliant alarms is important, but knowing how to respond when they sound is another essential part of household fire safety.



Homeowners who have yet to complete their upgrades should begin by reviewing their existing alarms, checking the requirements for their property and arranging professional advice where needed. Leaving the work until the final weeks of December may unnecessarily limit their options.



Queensland's smoke alarm reforms were introduced to improve the warning people receive when fire breaks out at home. Meeting the requirements before 1 January 2027 is an important step, but the greater responsibility is ensuring that everyone in the household knows what to do when those alarms sound.




  
    .cb-author-box,
    .cb-author-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-author-box {
      width: 100%;
      max-width: 100%;
      margin: 30px 0;
      padding: 23px;
      background: #f7f8f9;
      border: 1px solid #dce1e5;
      border-radius: 7px;
      color: #283740;
      font: 15px/1.6 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      hyphens: none;
    }

    .cb-author-main {
      display: grid;
      grid-template-columns: 145px minmax(0, 1fr);
      gap: 22px;
      align-items: start;
    }

    .cb-author-photo {
      width: 145px;
      max-width: 100%;
      height: auto;
      display: block;
      border-radius: 5px;
      object-fit: contain;
    }

    .cb-author-copy h3 {
      margin: 0 0 10px;
      color: #203b50;
      font-size: 21px;
      line-height: 1.3;
      font-weight: 700;
    }

    .cb-author-copy p {
      margin: 0;
      line-height: 1.65;
    }

    .cb-author-copy a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-author-copy a:hover,
    .cb-author-copy a:focus {
      color: #40566a;
    }

    .cb-author-box .cb-series-note {
      margin: 19px 0 0;
      padding: 13px 0 0;
      border-top: 1px solid #dce1e5;
      color: #586670;
      font-size: 13px;
      line-height: 1.6;
      font-style: italic;
    }

    @media (max-width: 600px) {
      .cb-author-box {
        padding: 19px 16px;
        margin: 24px 0;
      }

      .cb-author-main {
        grid-template-columns: minmax(0, 1fr);
        gap: 15px;
      }

      .cb-author-photo {
        width: 150px;
        max-width: 65%;
        height: auto;
        margin: 0 auto;
      }

      .cb-author-copy h3 {
        font-size: 20px;
      }
    }
  

  

    
      
    

    
      About Cathy Brand

      
        Cathy Brand is the Chief
        Executive Officer of
        Brooks Australia,
        a provider of fire detection and warning
        technology. Through her work in the fire
        safety industry, she advocates for greater
        awareness of residential fire protection,
        interconnected smoke alarm systems and
        solutions that consider the needs of
        different households.
      
    

  

  
    Home Fire Safety with Cathy Brand is a five-part
    sponsored editorial series presented in
    partnership with Brooks Australia.
  




Published 27-October-2026




]]></content:encoded>
</item><item>
<title><![CDATA[Brisbane Dawn Economy Consultation Opens as City Plans for Early Risers]]></title>
<link>https://westendtoday.com.au/brisbane-dawn-economy-plan-2026/brisbane-dawn-economy-plan-2026</link>
<media:content url="https://westendtoday.com.au/wp-content/uploads/2026/10/Brisbane-Dawn-Economy-FI-scaled.png" medium="image"/>
<media:thumbnail url="https://westendtoday.com.au/wp-content/uploads/2026/10/Brisbane-Dawn-Economy-FI-scaled.png"/>
<enclosure url="https://westendtoday.com.au/wp-content/uploads/2026/10/Brisbane-Dawn-Economy-FI-scaled.png" length="1079311" type="image/png"/>
<pubDate>Wed, 28 Oct 2026 01:47:48 +0000</pubDate>
<dc:creator><![CDATA[West End Today]]></dc:creator>
<guid isPermaLink="true">https://westendtoday.com.au/brisbane-dawn-economy-plan-2026/</guid>
<description><![CDATA[


Brisbane's early-morning routines could receive greater attention under a new citywide plan examining improvements to public facilities, walking and cycling routes, transport connections and opportunities for businesses trading before sunrise.



Brisbane City Council opened&nbsp;public consultation&nbsp;on 20 October 2026, inviting residents to share how they use the city between 4:00 a.m. and 7:00 a.m. The five-minute survey closes at 11:59 p.m. on Sunday, 22 November 2026, with responses intended to guide future planning and investment.




HAVE YOUR SAY




Better lighting, paths and public facilities under consideration



The proposed&nbsp;Dawn Economy Plan&nbsp;considers improved lighting along walking and running routes, more drinking fountains and public toilets, additional shade and seating in parks, and better connections between pedestrian and cycling paths.



Residents are being asked where they go, what activities they undertake and which improvements would make Brisbane easier to navigate in the early hours. Public transport connections and opportunities for early-trading businesses are also part of the consultation.



No suburb-specific upgrades have been approved through the plan. Council will use community feedback to help establish priorities, while businesses and precinct representatives will be consulted about opportunities to support morning activity.



Brisbane's early trading leads other capitals



Research by Ingenium&nbsp;found that one in eight Brisbane food and drink venues was trading at 5:00 a.m., compared with one in 25 in Sydney and one in 33 in Melbourne and Perth.



Further analysis by researcher Dr Anna Edwards found that approximately one-third of Brisbane's food and drink businesses were operating between 6:00 a.m. and 7:00 a.m., with around half open by 8:00 a.m.



Dr Edwards identified Brisbane's established early-trading patterns as an economic advantage, supported by the city's outdoor lifestyle and demand for morning hospitality and recreation.



Council has also highlighted Brisbane's 19 Saturday parkruns, which attract thousands of runners, walkers and volunteers, as evidence of the city's established appetite for early outdoor activity.



Lord Mayor Adrian Schrinner said the consultation would help identify practical improvements for residents who already use Brisbane's parks, pathways, pools and hospitality venues before the conventional working day begins.



Five precinct connections proposed across Brisbane



The&nbsp;Committee for Brisbane's Dawn Economy Position Paper, released on 18 October, examines economic activity between 5:00 a.m. and 9:00 a.m. and proposes stronger connections between major recreation, cultural, education and business precincts.



Its recommendations identify five potential corridors spanning the Brisbane River, education and research centres, recreation areas, cultural destinations and sporting facilities.



The proposed connections include South Bank and Kangaroo Point along the river, Mt Coot-tha and Victoria Park through the recreation corridor, and Fortitude Valley, New Farm and West End through the cultural corridor. No construction commitments have been announced for these recommendations.





  Five Proposed Dawn Economy Connections Across Brisbane

  
    The Committee for Brisbane has identified five potential
    connections between major activity precincts.
  

  
    River corridor
    Howard Smith Wharves, CBD, Botanic Gardens,
    South Bank and Kangaroo Point.
  

  
    Knowledge corridor
    Herston, Kelvin Grove, Roma Street, CBD,
    Gardens Point and Boggo Road.
  

  
    Recreation corridor
    Mt Coot-tha, Victoria Park, Spring Hill,
    CBD and Kangaroo Point.
  

  
    Cultural corridor
    Fortitude Valley, New Farm, Howard Smith Wharves,
    Queensland Cultural Centre and West End.
  

  
    Sports corridor
    Ballymore, Victoria Park, RNA Showgrounds,
    Woolloongabba and Queensland Tennis Centre.
  

  
    Planning status:
    These connections are recommendations, not approved
    or funded construction projects.
  

  
    Source:
    
      Committee for Brisbane, Dawn Economy Position Paper
    , October 2026, page 13.
  



.bson-dawn-box {
  background: #f3f7fb;
  border: 1px solid #d5e1ed;
  border-left: 5px solid #23608c;
  border-radius: 6px;
  padding: 24px;
  margin: 28px 0;
  color: #263746;
  font-family: inherit;
  line-height: 1.65;
}

.bson-dawn-box h3 {
  font-size: 21px;
  line-height: 1.35;
  color: #183b56;
  margin: 0 0 12px;
  font-weight: 700;
}

.bson-dawn-intro {
  margin: 0 0 18px;
  font-size: 15px;
}

.bson-dawn-item {
  border-top: 1px solid #d5e1ed;
  padding: 13px 0;
}

.bson-dawn-item h4 {
  font-size: 16px;
  font-weight: 700;
  color: #205c83;
  margin: 0 0 4px;
}

.bson-dawn-item p {
  margin: 0;
  font-size: 15px;
}

.bson-dawn-box .bson-dawn-note {
  background: #e5eef6;
  border-radius: 4px;
  padding: 12px 14px;
  margin: 16px 0 12px;
  font-size: 13px;
}

.bson-dawn-source {
  font-size: 12px;
  color: #586a79;
  margin: 0;
}

.bson-dawn-source a {
  color: #205c83;
  text-decoration: underline;
}

@media (max-width: 600px) {
  .bson-dawn-box {
    padding: 18px;
  }

  .bson-dawn-box h3 {
    font-size: 19px;
  }

  .bson-dawn-item p,
  .bson-dawn-intro {
    font-size: 14px;
  }
}





The Committee also advocates a coordinated 24-hour economy strategy, opportunities in wellness tourism and greater use of Brisbane's outdoor lifestyle as the city prepares for the 2032 Olympic and Paralympic Games.



Committee for Brisbane chief executive Jen Williams has identified early-morning activity as an opportunity to strengthen the city's economy alongside its established night-time hospitality and entertainment sectors.



Queensland's&nbsp;draft State Planning Policy&nbsp;also recognises dawn and night-time economic activity as considerations in land-use planning. Public consultation on the draft closed on 26 October, with the final policy yet to be settled.



Existing recreation investment and transport priorities



Brisbane City Council has separately announced a $5.6 million investment in&nbsp;Move Well Brisbane, expanding its existing Active and Healthy programme. Council says the initiative will deliver 20,000 free and low-cost activity sessions over two years and involve approximately 400 local businesses.



Activities will be available across mornings, evenings and weekends, including fitness, nutrition and wellbeing programmes. Funding for Move Well Brisbane is separate from any future infrastructure commitments arising from the Dawn Economy Plan.



Council Opposition Leader Jared Cassidy criticised the survey as unnecessary, arguing that council should prioritise earlier public transport services and improved lighting in parks and along bikeways, particularly during winter mornings.



The Dawn Economy Plan remains in development, with no confirmed list of suburb-specific upgrades, construction timetable or dedicated infrastructure budget. Feedback from residents, businesses and precinct representatives will help inform the council's next steps.



Published 27-Oct-2026Featured Image Credit: Committee for Brisbane




]]></description>
<content:encoded><![CDATA[


Brisbane's early-morning routines could receive greater attention under a new citywide plan examining improvements to public facilities, walking and cycling routes, transport connections and opportunities for businesses trading before sunrise.



Brisbane City Council opened&nbsp;public consultation&nbsp;on 20 October 2026, inviting residents to share how they use the city between 4:00 a.m. and 7:00 a.m. The five-minute survey closes at 11:59 p.m. on Sunday, 22 November 2026, with responses intended to guide future planning and investment.




HAVE YOUR SAY




Better lighting, paths and public facilities under consideration



The proposed&nbsp;Dawn Economy Plan&nbsp;considers improved lighting along walking and running routes, more drinking fountains and public toilets, additional shade and seating in parks, and better connections between pedestrian and cycling paths.



Residents are being asked where they go, what activities they undertake and which improvements would make Brisbane easier to navigate in the early hours. Public transport connections and opportunities for early-trading businesses are also part of the consultation.



No suburb-specific upgrades have been approved through the plan. Council will use community feedback to help establish priorities, while businesses and precinct representatives will be consulted about opportunities to support morning activity.



Brisbane's early trading leads other capitals



Research by Ingenium&nbsp;found that one in eight Brisbane food and drink venues was trading at 5:00 a.m., compared with one in 25 in Sydney and one in 33 in Melbourne and Perth.



Further analysis by researcher Dr Anna Edwards found that approximately one-third of Brisbane's food and drink businesses were operating between 6:00 a.m. and 7:00 a.m., with around half open by 8:00 a.m.



Dr Edwards identified Brisbane's established early-trading patterns as an economic advantage, supported by the city's outdoor lifestyle and demand for morning hospitality and recreation.



Council has also highlighted Brisbane's 19 Saturday parkruns, which attract thousands of runners, walkers and volunteers, as evidence of the city's established appetite for early outdoor activity.



Lord Mayor Adrian Schrinner said the consultation would help identify practical improvements for residents who already use Brisbane's parks, pathways, pools and hospitality venues before the conventional working day begins.



Five precinct connections proposed across Brisbane



The&nbsp;Committee for Brisbane's Dawn Economy Position Paper, released on 18 October, examines economic activity between 5:00 a.m. and 9:00 a.m. and proposes stronger connections between major recreation, cultural, education and business precincts.



Its recommendations identify five potential corridors spanning the Brisbane River, education and research centres, recreation areas, cultural destinations and sporting facilities.



The proposed connections include South Bank and Kangaroo Point along the river, Mt Coot-tha and Victoria Park through the recreation corridor, and Fortitude Valley, New Farm and West End through the cultural corridor. No construction commitments have been announced for these recommendations.





  Five Proposed Dawn Economy Connections Across Brisbane

  
    The Committee for Brisbane has identified five potential
    connections between major activity precincts.
  

  
    River corridor
    Howard Smith Wharves, CBD, Botanic Gardens,
    South Bank and Kangaroo Point.
  

  
    Knowledge corridor
    Herston, Kelvin Grove, Roma Street, CBD,
    Gardens Point and Boggo Road.
  

  
    Recreation corridor
    Mt Coot-tha, Victoria Park, Spring Hill,
    CBD and Kangaroo Point.
  

  
    Cultural corridor
    Fortitude Valley, New Farm, Howard Smith Wharves,
    Queensland Cultural Centre and West End.
  

  
    Sports corridor
    Ballymore, Victoria Park, RNA Showgrounds,
    Woolloongabba and Queensland Tennis Centre.
  

  
    Planning status:
    These connections are recommendations, not approved
    or funded construction projects.
  

  
    Source:
    
      Committee for Brisbane, Dawn Economy Position Paper
    , October 2026, page 13.
  



.bson-dawn-box {
  background: #f3f7fb;
  border: 1px solid #d5e1ed;
  border-left: 5px solid #23608c;
  border-radius: 6px;
  padding: 24px;
  margin: 28px 0;
  color: #263746;
  font-family: inherit;
  line-height: 1.65;
}

.bson-dawn-box h3 {
  font-size: 21px;
  line-height: 1.35;
  color: #183b56;
  margin: 0 0 12px;
  font-weight: 700;
}

.bson-dawn-intro {
  margin: 0 0 18px;
  font-size: 15px;
}

.bson-dawn-item {
  border-top: 1px solid #d5e1ed;
  padding: 13px 0;
}

.bson-dawn-item h4 {
  font-size: 16px;
  font-weight: 700;
  color: #205c83;
  margin: 0 0 4px;
}

.bson-dawn-item p {
  margin: 0;
  font-size: 15px;
}

.bson-dawn-box .bson-dawn-note {
  background: #e5eef6;
  border-radius: 4px;
  padding: 12px 14px;
  margin: 16px 0 12px;
  font-size: 13px;
}

.bson-dawn-source {
  font-size: 12px;
  color: #586a79;
  margin: 0;
}

.bson-dawn-source a {
  color: #205c83;
  text-decoration: underline;
}

@media (max-width: 600px) {
  .bson-dawn-box {
    padding: 18px;
  }

  .bson-dawn-box h3 {
    font-size: 19px;
  }

  .bson-dawn-item p,
  .bson-dawn-intro {
    font-size: 14px;
  }
}





The Committee also advocates a coordinated 24-hour economy strategy, opportunities in wellness tourism and greater use of Brisbane's outdoor lifestyle as the city prepares for the 2032 Olympic and Paralympic Games.



Committee for Brisbane chief executive Jen Williams has identified early-morning activity as an opportunity to strengthen the city's economy alongside its established night-time hospitality and entertainment sectors.



Queensland's&nbsp;draft State Planning Policy&nbsp;also recognises dawn and night-time economic activity as considerations in land-use planning. Public consultation on the draft closed on 26 October, with the final policy yet to be settled.



Existing recreation investment and transport priorities



Brisbane City Council has separately announced a $5.6 million investment in&nbsp;Move Well Brisbane, expanding its existing Active and Healthy programme. Council says the initiative will deliver 20,000 free and low-cost activity sessions over two years and involve approximately 400 local businesses.



Activities will be available across mornings, evenings and weekends, including fitness, nutrition and wellbeing programmes. Funding for Move Well Brisbane is separate from any future infrastructure commitments arising from the Dawn Economy Plan.



Council Opposition Leader Jared Cassidy criticised the survey as unnecessary, arguing that council should prioritise earlier public transport services and improved lighting in parks and along bikeways, particularly during winter mornings.



The Dawn Economy Plan remains in development, with no confirmed list of suburb-specific upgrades, construction timetable or dedicated infrastructure budget. Feedback from residents, businesses and precinct representatives will help inform the council's next steps.



Published 27-Oct-2026Featured Image Credit: Committee for Brisbane




]]></content:encoded>
</item><item>
<title><![CDATA[Where to Get Sandbags in Brisbane and Moreton Bay During Heavy Rain]]></title>
<link>https://westendtoday.com.au/sandbag-stations-brisbane-moreton-bay-heavy-rain/sandbag-stations-brisbane-moreton-bay-heavy-rain</link>
<media:content url="https://westendtoday.com.au/wp-content/uploads/2026/10/Sandbags-FI-scaled.png" medium="image"/>
<media:thumbnail url="https://westendtoday.com.au/wp-content/uploads/2026/10/Sandbags-FI-scaled.png"/>
<enclosure url="https://westendtoday.com.au/wp-content/uploads/2026/10/Sandbags-FI-scaled.png" length="932304" type="image/png"/>
<pubDate>Thu, 22 Oct 2026 01:43:50 +0000</pubDate>
<dc:creator><![CDATA[West End Today]]></dc:creator>
<guid isPermaLink="true">https://westendtoday.com.au/sandbag-stations-brisbane-moreton-bay-heavy-rain/</guid>
<description><![CDATA[


Residents preparing for flooding across Brisbane and Moreton Bay have different sandbag collection arrangements depending on where they live, with five established collection points in Brisbane and emergency-activated stations across Moreton Bay.



Following heavy rainfall on Thursday, 22 October, Brisbane City Council's five permanent storm-season collection points remained covered by its published 24-hour arrangements. City of Moreton Bay, meanwhile, operates temporary self-service stations that must be activated before residents can collect sandbags.



Brisbane's five sandbag collection points



Brisbane City Council provides pre-filled sandbags from five depots throughout the October-to-March storm season. Its published arrangements specify collection 24 hours a day, seven days a week, at the following locations:




Darra: South Depot, 38 Shamrock Road



Lota: Depot, 58 Herbert Street



Morningside: Balmoral Depot, 9 Redfern Street



Newmarket: SES Depot, 66 Wilston Road



Zillmere: North Depot, 33 Jennings Street




The collection points are part of the council's established storm-season service rather than temporary locations opened solely in response to Thursday's rainfall. Individual stock levels have not been confirmed, and residents should check official updates before travelling.



Additional self-service stations may be established across Brisbane during significant severe weather. No extra location was independently verified during this review.



Moreton Bay stations require activation



City of Moreton Bay operates free sandbag collection stations when significant rainfall or potential flooding is forecast. Its published register identifies 13 sites across the region, although their operating status can change during severe weather.



The following locations are among those designated for emergency activation:




Caboolture: Council Depot Car Park, 98 Beerburrum Road



Narangba: 910 Oakey Flat Road, between Raynbird Road and Sovereign Drive



Deception Bay: SES, 2–22 Old Bay Road



Petrie: 3 Woonara Drive



Arana Hills: SES, 2 Pine Hills Drive, off Jinker Track



Margate: Jull Street, opposite the council depot



Bongaree: Bribie Island SES, 208 First Avenue



Beachmere: Rogers Street Sports Ground, 57 Rogers Street




Other designated locations are in Dayboro, Elimbah, Toorbul and Woodford, which has two collection sites.



The council's indexed station register displayed all 13 locations as closed during this research. However, its live dashboard map could not be independently checked, so the current operating status of individual sites remains unconfirmed.



Residents should consult the Moreton Bay Disaster Dashboard before leaving home. Operating locations are identified by green shovel icons, while activated stations are generally available around the clock until supplies run out.



What residents need to bring



Brisbane's regular collection points provide pre-filled sandbags. Moreton Bay's activated stations operate differently, with residents required to fill their own bags using sand supplied by the council.



Moreton Bay advises bringing a shovel, gloves, enclosed shoes, string or zip-ties, and spare empty bags. Council provides polypropylene bags when available, but supplies may run out.



Sandbags should be filled no more than two-thirds full to make them easier to carry and position. Queensland SES advises leaving the tops untied when laying the bags, although they may be secured for transport. Collection limits and assistance arrangements at individual stations have not been independently confirmed.







Before You Collect Sandbags



Check before travelling.
Stations may close or run out of supplies.
Never walk or drive through floodwater.



Brisbane: Five established storm-season
collection points provide pre-filled bags under
published 24-hour arrangements. Stock is not guaranteed.



Moreton Bay: Stations open only when
activated. Look for green shovel icons on the council
disaster dashboard. Collection is free and self-service.



What to bring in Moreton Bay



A shovel and spare empty bags
Gloves and enclosed shoes
String or zip-ties for transporting bags



Using sandbags safely



Fill bags halfway to two-thirds full.
Leave bag tops untied when positioning them.
Use plastic sheeting beneath staggered rows.
Keep at least one doorway accessible.
Do not rely on sandbags to stop major flooding.



Need help? SES:
132 500.
Life-threatening emergencies:
000.




Moreton Bay Disaster Dashboard





Brisbane emergency dashboard




Council arrangements checked 22 October 2026.
Confirm current station operations before travelling.







Heavy rainfall and flood safety



The Bureau of Meteorology recorded intense rainfall around Caboolture, Morayfield and Burpengary on Thursday morning.



A warning issued at 7:02 a.m. reported 131 millimetres at Caboolture, 128 millimetres at Sheep Station Creek in Morayfield and 127 millimetres at Burpengary during three-hour periods ending at 6:45 a.m. Those figures describe morning observations, not rainfall totals for the entire day.



Sandbags can reduce water entering buildings but cannot completely prevent flooding. Residents should place them where water may enter, using plastic sheeting beneath staggered rows, while keeping at least one exit accessible.



Never walk or drive through floodwater to collect supplies. For storm or flood assistance, contact the State Emergency Service on&nbsp;132 500. Call&nbsp;Triple Zero (000)&nbsp;for life-threatening emergencies.



Current warnings, local road closures and sandbag activation information are available through the Brisbane and Moreton Bay emergency dashboards.



Published 22-Oct-2026
]]></description>
<content:encoded><![CDATA[


Residents preparing for flooding across Brisbane and Moreton Bay have different sandbag collection arrangements depending on where they live, with five established collection points in Brisbane and emergency-activated stations across Moreton Bay.



Following heavy rainfall on Thursday, 22 October, Brisbane City Council's five permanent storm-season collection points remained covered by its published 24-hour arrangements. City of Moreton Bay, meanwhile, operates temporary self-service stations that must be activated before residents can collect sandbags.



Brisbane's five sandbag collection points



Brisbane City Council provides pre-filled sandbags from five depots throughout the October-to-March storm season. Its published arrangements specify collection 24 hours a day, seven days a week, at the following locations:




Darra: South Depot, 38 Shamrock Road



Lota: Depot, 58 Herbert Street



Morningside: Balmoral Depot, 9 Redfern Street



Newmarket: SES Depot, 66 Wilston Road



Zillmere: North Depot, 33 Jennings Street




The collection points are part of the council's established storm-season service rather than temporary locations opened solely in response to Thursday's rainfall. Individual stock levels have not been confirmed, and residents should check official updates before travelling.



Additional self-service stations may be established across Brisbane during significant severe weather. No extra location was independently verified during this review.



Moreton Bay stations require activation



City of Moreton Bay operates free sandbag collection stations when significant rainfall or potential flooding is forecast. Its published register identifies 13 sites across the region, although their operating status can change during severe weather.



The following locations are among those designated for emergency activation:




Caboolture: Council Depot Car Park, 98 Beerburrum Road



Narangba: 910 Oakey Flat Road, between Raynbird Road and Sovereign Drive



Deception Bay: SES, 2–22 Old Bay Road



Petrie: 3 Woonara Drive



Arana Hills: SES, 2 Pine Hills Drive, off Jinker Track



Margate: Jull Street, opposite the council depot



Bongaree: Bribie Island SES, 208 First Avenue



Beachmere: Rogers Street Sports Ground, 57 Rogers Street




Other designated locations are in Dayboro, Elimbah, Toorbul and Woodford, which has two collection sites.



The council's indexed station register displayed all 13 locations as closed during this research. However, its live dashboard map could not be independently checked, so the current operating status of individual sites remains unconfirmed.



Residents should consult the Moreton Bay Disaster Dashboard before leaving home. Operating locations are identified by green shovel icons, while activated stations are generally available around the clock until supplies run out.



What residents need to bring



Brisbane's regular collection points provide pre-filled sandbags. Moreton Bay's activated stations operate differently, with residents required to fill their own bags using sand supplied by the council.



Moreton Bay advises bringing a shovel, gloves, enclosed shoes, string or zip-ties, and spare empty bags. Council provides polypropylene bags when available, but supplies may run out.



Sandbags should be filled no more than two-thirds full to make them easier to carry and position. Queensland SES advises leaving the tops untied when laying the bags, although they may be secured for transport. Collection limits and assistance arrangements at individual stations have not been independently confirmed.







Before You Collect Sandbags



Check before travelling.
Stations may close or run out of supplies.
Never walk or drive through floodwater.



Brisbane: Five established storm-season
collection points provide pre-filled bags under
published 24-hour arrangements. Stock is not guaranteed.



Moreton Bay: Stations open only when
activated. Look for green shovel icons on the council
disaster dashboard. Collection is free and self-service.



What to bring in Moreton Bay



A shovel and spare empty bags
Gloves and enclosed shoes
String or zip-ties for transporting bags



Using sandbags safely



Fill bags halfway to two-thirds full.
Leave bag tops untied when positioning them.
Use plastic sheeting beneath staggered rows.
Keep at least one doorway accessible.
Do not rely on sandbags to stop major flooding.



Need help? SES:
132 500.
Life-threatening emergencies:
000.




Moreton Bay Disaster Dashboard





Brisbane emergency dashboard




Council arrangements checked 22 October 2026.
Confirm current station operations before travelling.







Heavy rainfall and flood safety



The Bureau of Meteorology recorded intense rainfall around Caboolture, Morayfield and Burpengary on Thursday morning.



A warning issued at 7:02 a.m. reported 131 millimetres at Caboolture, 128 millimetres at Sheep Station Creek in Morayfield and 127 millimetres at Burpengary during three-hour periods ending at 6:45 a.m. Those figures describe morning observations, not rainfall totals for the entire day.



Sandbags can reduce water entering buildings but cannot completely prevent flooding. Residents should place them where water may enter, using plastic sheeting beneath staggered rows, while keeping at least one exit accessible.



Never walk or drive through floodwater to collect supplies. For storm or flood assistance, contact the State Emergency Service on&nbsp;132 500. Call&nbsp;Triple Zero (000)&nbsp;for life-threatening emergencies.



Current warnings, local road closures and sandbag activation information are available through the Brisbane and Moreton Bay emergency dashboards.



Published 22-Oct-2026
]]></content:encoded>
</item><item>
<title><![CDATA[West End River Bridge Plans Revived With $2 Million Funding Boost]]></title>
<link>https://westendtoday.com.au/west-end-river-bridge-plans-revived-with-2-million-funding-boost</link>
<media:content url="https://westendtoday.com.au/wp-content/uploads/2026/10/West-End-landing-FI-scaled.png" medium="image"/>
<media:thumbnail url="https://westendtoday.com.au/wp-content/uploads/2026/10/West-End-landing-FI-scaled.png"/>
<enclosure url="https://westendtoday.com.au/wp-content/uploads/2026/10/West-End-landing-FI-scaled.png" length="902451" type="image/png"/>
<pubDate>Mon, 19 Oct 2026 02:48:39 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[Bridges for Brisbane]]></category>
<category><![CDATA[Brisbane River crossing]]></category>
<category><![CDATA[Kurilpa development]]></category>
<category><![CDATA[Montague Road]]></category>
<category><![CDATA[Orleigh Park]]></category>
<category><![CDATA[Toowong to West End Bridge]]></category>
<category><![CDATA[West End bridge]]></category>
<category><![CDATA[West End cycling infrastructure]]></category>
<category><![CDATA[West End green bridge]]></category>
<dc:creator><![CDATA[West End Today]]></dc:creator>
<guid isPermaLink="true">https://westendtoday.com.au/?page_id=17744</guid>
<description><![CDATA[
Plans for a pedestrian and cycling bridge from West End's Orleigh Park across the Brisbane River have regained momentum, reviving a long-discussed connection that could bring rail services, shopping and healthcare facilities within easier reach of local residents.



Read: West End Locals Establish Shared Vision for the Montague Road Project



Brisbane City Council and the Australian Government have each committed $1 million towards updating the Toowong to West End Bridge business case. The October 2026 announcement marks renewed progress for the project, although the funding is for planning rather than construction.



Orleigh Park at the centre of bridge plans



The proposed West End landing would sit beside Forbes Street in Orleigh Park, immediately north of the Brisbane and GPS Rowing Club and near the Cranbrook Place memorial site.



Under the existing concept design, the landing would connect to walking and cycling paths along Riverside Drive and Hill End Terrace. Subtropical planting and park upgrades are also proposed, with the new infrastructure intended to fit into the surrounding riverside parkland.



The 2021 design features an approximately 280-metre curved bridge with separated walking and cycling paths providing a minimum pathway width of six metres. Shaded sections and a widened rest area near the bridge's central mast would allow people to stop and enjoy views along the river.



The final design remains subject to further planning and assessment.



A direct route to rail services and the Bicentennial Bikeway



For West End residents, the crossing would create a more direct walking and cycling route to Toowong railway station, Regatta ferry terminal, shops and healthcare services.



The bridge would also improve connections between West End's existing riverside paths and the Bicentennial Bikeway, giving cyclists another option for travelling towards the CBD and other parts of Brisbane.



Photo Credit: TMR



Council has already acquired land at 600 Coronation Drive for the proposed Toowong landing. The design includes a connection through Archer Street, while a direct cycling link through the site to the Bicentennial Bikeway remains a future opportunity.



Montague Road bus improvements under investigation



West End's existing public transport network is also being considered alongside the proposed crossing, with investigations into bus priority measures along Montague Road.



Possible improvements include giving buses priority at key intersections to reduce delays and improve reliability along one of the suburb's main transport corridors.



Preliminary modelling suggests such measures could improve bus travel times with limited effects on general traffic. However, no construction commitment has been announced for the proposed changes.



Kurilpa housing growth drives fresh transport forecasts



Residential development across West End and the wider Kurilpa peninsula has strengthened the case for reassessing the crossing's projected demand.



More than 6,000 additional homes are identified in Kurilpa's development pipeline, although not all are necessarily approved or guaranteed to proceed. Meanwhile, almost 100,000 people are projected to live in suburbs surrounding the proposed bridge by 2046, more than double the population assumed in the original 2021 business case.



Earlier modelling forecast 3,900 daily trips across the bridge by 2031, rising to 5,300 by 2041. The updated assessment will reconsider those estimates using more recent population, employment and travel data.



Construction costs, design alternatives, materials and possible delivery arrangements will also be reviewed to establish what would be required to move the project towards construction.



Years of planning before the latest funding commitment



Community consultation on the bridge began in 2019, followed by assessments of possible crossing locations and the release of a concept design in November 2021.



Feedback gathered during the design consultation showed support for integrating the West End landing with Orleigh Park's existing pathways and public spaces.



Photo Credit: BCC



Planning was subsequently paused as Brisbane prioritised recovery from the February 2022 floods, with inflation and financial pressures contributing to the extended delay.



Despite the latest funding commitment, construction of the bridge will still require additional government support. No construction start date or completion timetable has been confirmed.



Read: Have Your Say On Toowong To West End Green Bridge Concept Design



Council has previously indicated that residents and other stakeholders would have further opportunities to provide feedback as the project progresses, although no new consultation dates have been announced.



Published 19-Oct-2026
]]></description>
<content:encoded><![CDATA[
Plans for a pedestrian and cycling bridge from West End's Orleigh Park across the Brisbane River have regained momentum, reviving a long-discussed connection that could bring rail services, shopping and healthcare facilities within easier reach of local residents.



Read: West End Locals Establish Shared Vision for the Montague Road Project



Brisbane City Council and the Australian Government have each committed $1 million towards updating the Toowong to West End Bridge business case. The October 2026 announcement marks renewed progress for the project, although the funding is for planning rather than construction.



Orleigh Park at the centre of bridge plans



The proposed West End landing would sit beside Forbes Street in Orleigh Park, immediately north of the Brisbane and GPS Rowing Club and near the Cranbrook Place memorial site.



Under the existing concept design, the landing would connect to walking and cycling paths along Riverside Drive and Hill End Terrace. Subtropical planting and park upgrades are also proposed, with the new infrastructure intended to fit into the surrounding riverside parkland.



The 2021 design features an approximately 280-metre curved bridge with separated walking and cycling paths providing a minimum pathway width of six metres. Shaded sections and a widened rest area near the bridge's central mast would allow people to stop and enjoy views along the river.



The final design remains subject to further planning and assessment.



A direct route to rail services and the Bicentennial Bikeway



For West End residents, the crossing would create a more direct walking and cycling route to Toowong railway station, Regatta ferry terminal, shops and healthcare services.



The bridge would also improve connections between West End's existing riverside paths and the Bicentennial Bikeway, giving cyclists another option for travelling towards the CBD and other parts of Brisbane.



Photo Credit: TMR



Council has already acquired land at 600 Coronation Drive for the proposed Toowong landing. The design includes a connection through Archer Street, while a direct cycling link through the site to the Bicentennial Bikeway remains a future opportunity.



Montague Road bus improvements under investigation



West End's existing public transport network is also being considered alongside the proposed crossing, with investigations into bus priority measures along Montague Road.



Possible improvements include giving buses priority at key intersections to reduce delays and improve reliability along one of the suburb's main transport corridors.



Preliminary modelling suggests such measures could improve bus travel times with limited effects on general traffic. However, no construction commitment has been announced for the proposed changes.



Kurilpa housing growth drives fresh transport forecasts



Residential development across West End and the wider Kurilpa peninsula has strengthened the case for reassessing the crossing's projected demand.



More than 6,000 additional homes are identified in Kurilpa's development pipeline, although not all are necessarily approved or guaranteed to proceed. Meanwhile, almost 100,000 people are projected to live in suburbs surrounding the proposed bridge by 2046, more than double the population assumed in the original 2021 business case.



Earlier modelling forecast 3,900 daily trips across the bridge by 2031, rising to 5,300 by 2041. The updated assessment will reconsider those estimates using more recent population, employment and travel data.



Construction costs, design alternatives, materials and possible delivery arrangements will also be reviewed to establish what would be required to move the project towards construction.



Years of planning before the latest funding commitment



Community consultation on the bridge began in 2019, followed by assessments of possible crossing locations and the release of a concept design in November 2021.



Feedback gathered during the design consultation showed support for integrating the West End landing with Orleigh Park's existing pathways and public spaces.



Photo Credit: BCC



Planning was subsequently paused as Brisbane prioritised recovery from the February 2022 floods, with inflation and financial pressures contributing to the extended delay.



Despite the latest funding commitment, construction of the bridge will still require additional government support. No construction start date or completion timetable has been confirmed.



Read: Have Your Say On Toowong To West End Green Bridge Concept Design



Council has previously indicated that residents and other stakeholders would have further opportunities to provide feedback as the project progresses, although no new consultation dates have been announced.



Published 19-Oct-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Heavy Rain Floods Brisbane Roads as More Storms Threaten South East Queensland]]></title>
<link>https://newfarmnews.com.au/brisbane-roads-flood-more-storms-south-east-queensland/brisbane-roads-flood-more-storms-south-east-queensland</link>
<media:content url="https://newfarmnews.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires.png" medium="image"/>
<media:thumbnail url="https://newfarmnews.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires.png"/>
<enclosure url="https://newfarmnews.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires.png" length="1832827" type="image/png"/>
<pubDate>Thu, 12 Nov 2026 02:03:21 +0000</pubDate>
<dc:creator><![CDATA[New Farm News]]></dc:creator>
<guid isPermaLink="true">https://newfarmnews.com.au/brisbane-roads-flood-more-storms-south-east-queensland/</guid>
<description><![CDATA[


Heavy rain has flooded roads across parts of Brisbane as residents in Moreton Bay, Redlands and surrounding South East Queensland communities prepare for another round of potentially severe thunderstorms following Wednesday's destructive weather.



The Bureau of Meteorology has warned that further storms could develop on Thursday, 12 November, bringing damaging winds, large hail and heavy rainfall capable of causing flash flooding.



The renewed threat comes as emergency crews continue clearing fallen trees, repairing damaged powerlines and responding to storm-related property damage. More than 80,000 homes and businesses across South East Queensland lost electricity at the height of Wednesday's storms, with tens of thousands still without power on Thursday morning.



Brisbane, Redlands and Moreton Bay were all affected by intense storm activity, with rainfall observations showing how quickly conditions deteriorated across southern and eastern suburbs.



Intense rainfall floods Brisbane streets



Some of Wednesday's heaviest rainfall was recorded in Brisbane's southern and eastern suburbs, where intense downpours delivered substantial amounts of rain in just half an hour.



Bureau of Meteorology observations recorded 78 millimetres at Wishart in the 30 minutes to 4:39 p.m., while Chandler received 75 millimetres in the 30 minutes to 4:52 p.m. Nearby Burbank recorded 59 millimetres over a similar period.



The short, intense bursts of rainfall created flash-flooding hazards on local roads and placed additional pressure on drainage systems.&nbsp;



In Gumdale, Formosa Road was closed to through traffic between Stanbrough Road and Dairy Swamp Road because of flash flooding. Emergency crews were also called to Gumdale on Wednesday evening after a vehicle became stranded in floodwater. Swiftwater rescue personnel assisted the driver to safety.



Elsewhere in Brisbane, a falling tree struck two vehicles on Logan Road at Eight Mile Plains as severe winds swept through the area.



Brisbane Airport recorded a wind gust of 96 kilometres per hour at 5:03 p.m. on Wednesday, with the severe weather causing flight delays, cancellations and temporary operational disruption.



Motorists are being urged to check road conditions before travelling, particularly in areas affected by heavy rain and fallen trees. Road restrictions may be lifted or introduced as conditions change.




BRISBANE EMERGENCY DASHBOARD








Redlands hit by heavy rain as storms move towards the bay



Redlands also experienced intense rainfall as Wednesday's thunderstorms moved across eastern Brisbane and towards Moreton Bay.



The Bureau recorded 75 millimetres of rain at Leslie Harrison Dam in the 30 minutes to 4:47 p.m., placing the area among the locations that experienced the most intense short-duration rainfall during the event.



At 5:19 p.m., the Bureau issued a severe thunderstorm warning covering parts of Redland City, Brisbane and Moreton Bay. Storms detected around Ormiston and Brisbane Airport were capable of producing damaging winds and heavy rainfall that could lead to flash flooding.



Cleveland, Victoria Point, Ormiston and nearby islands were among the locations identified in warnings as the storms developed during the afternoon.



The State Emergency Service received 16 requests for assistance across Redlands following Wednesday's weather, adding to hundreds of calls received throughout South East Queensland.



Residents in Cleveland, Capalaba, Wellington Point, Victoria Point and surrounding suburbs can check the Redlands Coast Disaster Dashboard for local warnings, road closures, electricity interruptions and emergency information.




REDLANDS COAST DISASTER DASHBOARD








The dashboard also provides evacuation information when relevant. No widespread evacuation order affecting Redlands has been established in the reports reviewed for this article.



Moreton Bay suburbs face further storm threat



Communities across Moreton Bay were also within the path of Wednesday's severe weather, with storm cells developing near Caboolture and Burpengary before moving towards the coast.



The Bureau's afternoon warnings identified conditions capable of producing damaging winds, large hail and intense rainfall across parts of the Moreton Bay region.



By early evening, the warning area extended towards the waters off Redcliffe, with Redcliffe and Scarborough among the locations forecast to be affected as the storms moved north and northeast.



Electricity interruptions were reported across the wider Moreton Bay region during Wednesday's severe weather, although the largest concentration of damage to the Energex network occurred further south in Logan and the Scenic Rim.



For residents in Caboolture, Morayfield, Burpengary, North Lakes, Redcliffe and neighbouring suburbs, the City of Moreton Bay Disaster Dashboard provides a central source of local emergency updates.




CITY OF MORETON BAY DISASTER DASHBOARD








The council's dashboard includes weather warnings, road conditions, power outages and information about emergency facilities and available disaster support services.



Residents should continue checking official updates, particularly where local roads, waterways or properties remain vulnerable to another period of heavy rainfall.



Electricity restoration continues across the south-east



Restoring electricity remains one of the largest recovery operations following Wednesday's storms, with widespread damage to powerlines, poles and other infrastructure.



Energex reported more than 400 sections of powerline brought down across South East Queensland, while more than 120,000 lightning strikes were recorded during the severe weather.



The worst electrical damage was concentrated in Logan and the Scenic Rim, where falling trees and damaged infrastructure left tens of thousands of properties disconnected.



By Thursday morning, approximately 55,000 properties across the region remained without power, according to ABC News reporting based on Energex information. Repair crews were being reinforced as assessments identified damaged poles and lines requiring replacement.



Some customers may face prolonged interruptions, particularly where access is obstructed or major infrastructure repairs are required.



Residents in Brisbane, Redlands and Moreton Bay can use the Energex Outage Finder to check reported power interruptions, affected locations and available restoration estimates.




ENERGEX OUTAGE FINDER








Energex has warned residents to remain clear of fallen electrical wires and to treat damaged powerlines as live. Electrical emergencies can be reported on 13 19 62.



School closures and transport disruption



Wednesday's storms also disrupted education across South East Queensland, with schools in the hardest-hit districts unable to operate normally because of damage and electricity interruptions.



Eleven state schools in the Logan City Council area were reported closed on Thursday morning, including campuses in Marsden, Crestmead, Jimboomba and Yarrabilba. Subsequent reporting placed the number of affected schools in the broader Logan and Jimboomba area at 13.



Within Brisbane, Mansfield State School cancelled a prep orientation session after experiencing telephone and internet disruption.



Parents across Brisbane, Moreton Bay and Redlands can check the Queensland Government's current emergency school closures register for information about affected state, independent and Catholic schools.




QLD SCHOOL CLOSURES








The register should be checked before travelling, as schools may reopen once power, access and safety conditions have been assessed. Families should also consult their school's own communications for local arrangements.



Transport disruption has extended beyond flooded roads. Brisbane Airport experienced delays and cancellations during Wednesday's storms, while local road hazards included fallen branches, damaged traffic infrastructure and standing water.



Drivers can check QLDTraffic or the Transport and Main Roads Road Status Update for restrictions affecting state-controlled roads. Council emergency dashboards provide additional local information.




TMR ROAD STATUS UPDATE








Emergency crews respond to hundreds of calls



The State Emergency Service received more than 320 requests for assistance across South East Queensland after Wednesday's storms.



Logan accounted for the majority of the calls, but emergency crews were also deployed across Brisbane, Redlands and other affected areas.



The requests largely involved fallen trees, damaged roofs, blocked access to properties and other storm-related hazards. Brisbane recorded 41 requests, while Redlands recorded 16.



Emergency workers have been clearing debris, securing damaged structures and helping residents protect properties exposed to further rainfall.



Authorities are also urging residents to avoid floodwater and stay away from fallen electrical infrastructure. Even shallow floodwater can conceal damaged road surfaces, debris and strong currents.



More severe thunderstorms possible



The Bureau of Meteorology has forecast another period of unsettled weather across South East Queensland on Thursday, with severe thunderstorms possible from the Gold Coast through Brisbane and the Sunshine Coast towards Bundaberg.



Forecasters have identified damaging winds, large hail and heavy rainfall leading to flash flooding as the main hazards.



The threat is particularly concerning for communities still dealing with damaged buildings, blocked access and electricity interruptions from Wednesday's storms.



Storm activity may ease in some districts on Friday before increasing again over the weekend as another weather system develops across inland Queensland.



Residents should monitor the Bureau of Meteorology's Queensland warnings and check their local council's emergency information before making travel plans.




BOM QUEENSLAND WARNINGS









  What residents should do
  
    Check weather warnings before travelling
    Avoid flooded roads and never drive through floodwater
    Stay clear of fallen powerlines
    Charge phones and devices while power is available
    Secure loose outdoor items where safe
    Call SES on 132 500 for non-life-threatening storm damage
    Call 000 in a life-threatening emergency
  




Published 12-Nov-2026
]]></description>
<content:encoded><![CDATA[


Heavy rain has flooded roads across parts of Brisbane as residents in Moreton Bay, Redlands and surrounding South East Queensland communities prepare for another round of potentially severe thunderstorms following Wednesday's destructive weather.



The Bureau of Meteorology has warned that further storms could develop on Thursday, 12 November, bringing damaging winds, large hail and heavy rainfall capable of causing flash flooding.



The renewed threat comes as emergency crews continue clearing fallen trees, repairing damaged powerlines and responding to storm-related property damage. More than 80,000 homes and businesses across South East Queensland lost electricity at the height of Wednesday's storms, with tens of thousands still without power on Thursday morning.



Brisbane, Redlands and Moreton Bay were all affected by intense storm activity, with rainfall observations showing how quickly conditions deteriorated across southern and eastern suburbs.



Intense rainfall floods Brisbane streets



Some of Wednesday's heaviest rainfall was recorded in Brisbane's southern and eastern suburbs, where intense downpours delivered substantial amounts of rain in just half an hour.



Bureau of Meteorology observations recorded 78 millimetres at Wishart in the 30 minutes to 4:39 p.m., while Chandler received 75 millimetres in the 30 minutes to 4:52 p.m. Nearby Burbank recorded 59 millimetres over a similar period.



The short, intense bursts of rainfall created flash-flooding hazards on local roads and placed additional pressure on drainage systems.&nbsp;



In Gumdale, Formosa Road was closed to through traffic between Stanbrough Road and Dairy Swamp Road because of flash flooding. Emergency crews were also called to Gumdale on Wednesday evening after a vehicle became stranded in floodwater. Swiftwater rescue personnel assisted the driver to safety.



Elsewhere in Brisbane, a falling tree struck two vehicles on Logan Road at Eight Mile Plains as severe winds swept through the area.



Brisbane Airport recorded a wind gust of 96 kilometres per hour at 5:03 p.m. on Wednesday, with the severe weather causing flight delays, cancellations and temporary operational disruption.



Motorists are being urged to check road conditions before travelling, particularly in areas affected by heavy rain and fallen trees. Road restrictions may be lifted or introduced as conditions change.




BRISBANE EMERGENCY DASHBOARD








Redlands hit by heavy rain as storms move towards the bay



Redlands also experienced intense rainfall as Wednesday's thunderstorms moved across eastern Brisbane and towards Moreton Bay.



The Bureau recorded 75 millimetres of rain at Leslie Harrison Dam in the 30 minutes to 4:47 p.m., placing the area among the locations that experienced the most intense short-duration rainfall during the event.



At 5:19 p.m., the Bureau issued a severe thunderstorm warning covering parts of Redland City, Brisbane and Moreton Bay. Storms detected around Ormiston and Brisbane Airport were capable of producing damaging winds and heavy rainfall that could lead to flash flooding.



Cleveland, Victoria Point, Ormiston and nearby islands were among the locations identified in warnings as the storms developed during the afternoon.



The State Emergency Service received 16 requests for assistance across Redlands following Wednesday's weather, adding to hundreds of calls received throughout South East Queensland.



Residents in Cleveland, Capalaba, Wellington Point, Victoria Point and surrounding suburbs can check the Redlands Coast Disaster Dashboard for local warnings, road closures, electricity interruptions and emergency information.




REDLANDS COAST DISASTER DASHBOARD








The dashboard also provides evacuation information when relevant. No widespread evacuation order affecting Redlands has been established in the reports reviewed for this article.



Moreton Bay suburbs face further storm threat



Communities across Moreton Bay were also within the path of Wednesday's severe weather, with storm cells developing near Caboolture and Burpengary before moving towards the coast.



The Bureau's afternoon warnings identified conditions capable of producing damaging winds, large hail and intense rainfall across parts of the Moreton Bay region.



By early evening, the warning area extended towards the waters off Redcliffe, with Redcliffe and Scarborough among the locations forecast to be affected as the storms moved north and northeast.



Electricity interruptions were reported across the wider Moreton Bay region during Wednesday's severe weather, although the largest concentration of damage to the Energex network occurred further south in Logan and the Scenic Rim.



For residents in Caboolture, Morayfield, Burpengary, North Lakes, Redcliffe and neighbouring suburbs, the City of Moreton Bay Disaster Dashboard provides a central source of local emergency updates.




CITY OF MORETON BAY DISASTER DASHBOARD








The council's dashboard includes weather warnings, road conditions, power outages and information about emergency facilities and available disaster support services.



Residents should continue checking official updates, particularly where local roads, waterways or properties remain vulnerable to another period of heavy rainfall.



Electricity restoration continues across the south-east



Restoring electricity remains one of the largest recovery operations following Wednesday's storms, with widespread damage to powerlines, poles and other infrastructure.



Energex reported more than 400 sections of powerline brought down across South East Queensland, while more than 120,000 lightning strikes were recorded during the severe weather.



The worst electrical damage was concentrated in Logan and the Scenic Rim, where falling trees and damaged infrastructure left tens of thousands of properties disconnected.



By Thursday morning, approximately 55,000 properties across the region remained without power, according to ABC News reporting based on Energex information. Repair crews were being reinforced as assessments identified damaged poles and lines requiring replacement.



Some customers may face prolonged interruptions, particularly where access is obstructed or major infrastructure repairs are required.



Residents in Brisbane, Redlands and Moreton Bay can use the Energex Outage Finder to check reported power interruptions, affected locations and available restoration estimates.




ENERGEX OUTAGE FINDER








Energex has warned residents to remain clear of fallen electrical wires and to treat damaged powerlines as live. Electrical emergencies can be reported on 13 19 62.



School closures and transport disruption



Wednesday's storms also disrupted education across South East Queensland, with schools in the hardest-hit districts unable to operate normally because of damage and electricity interruptions.



Eleven state schools in the Logan City Council area were reported closed on Thursday morning, including campuses in Marsden, Crestmead, Jimboomba and Yarrabilba. Subsequent reporting placed the number of affected schools in the broader Logan and Jimboomba area at 13.



Within Brisbane, Mansfield State School cancelled a prep orientation session after experiencing telephone and internet disruption.



Parents across Brisbane, Moreton Bay and Redlands can check the Queensland Government's current emergency school closures register for information about affected state, independent and Catholic schools.




QLD SCHOOL CLOSURES








The register should be checked before travelling, as schools may reopen once power, access and safety conditions have been assessed. Families should also consult their school's own communications for local arrangements.



Transport disruption has extended beyond flooded roads. Brisbane Airport experienced delays and cancellations during Wednesday's storms, while local road hazards included fallen branches, damaged traffic infrastructure and standing water.



Drivers can check QLDTraffic or the Transport and Main Roads Road Status Update for restrictions affecting state-controlled roads. Council emergency dashboards provide additional local information.




TMR ROAD STATUS UPDATE








Emergency crews respond to hundreds of calls



The State Emergency Service received more than 320 requests for assistance across South East Queensland after Wednesday's storms.



Logan accounted for the majority of the calls, but emergency crews were also deployed across Brisbane, Redlands and other affected areas.



The requests largely involved fallen trees, damaged roofs, blocked access to properties and other storm-related hazards. Brisbane recorded 41 requests, while Redlands recorded 16.



Emergency workers have been clearing debris, securing damaged structures and helping residents protect properties exposed to further rainfall.



Authorities are also urging residents to avoid floodwater and stay away from fallen electrical infrastructure. Even shallow floodwater can conceal damaged road surfaces, debris and strong currents.



More severe thunderstorms possible



The Bureau of Meteorology has forecast another period of unsettled weather across South East Queensland on Thursday, with severe thunderstorms possible from the Gold Coast through Brisbane and the Sunshine Coast towards Bundaberg.



Forecasters have identified damaging winds, large hail and heavy rainfall leading to flash flooding as the main hazards.



The threat is particularly concerning for communities still dealing with damaged buildings, blocked access and electricity interruptions from Wednesday's storms.



Storm activity may ease in some districts on Friday before increasing again over the weekend as another weather system develops across inland Queensland.



Residents should monitor the Bureau of Meteorology's Queensland warnings and check their local council's emergency information before making travel plans.




BOM QUEENSLAND WARNINGS









  What residents should do
  
    Check weather warnings before travelling
    Avoid flooded roads and never drive through floodwater
    Stay clear of fallen powerlines
    Charge phones and devices while power is available
    Secure loose outdoor items where safe
    Call SES on 132 500 for non-life-threatening storm damage
    Call 000 in a life-threatening emergency
  




Published 12-Nov-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Thousands Celebrate Brisbane Pride at New Farm Park]]></title>
<link>https://newfarmnews.com.au/thousands-celebrate-brisbane-pride-at-new-farm-park</link>
<media:content url="https://newfarmnews.com.au/wp-content/uploads/2026/11/3.png" medium="image"/>
<media:thumbnail url="https://newfarmnews.com.au/wp-content/uploads/2026/11/3.png"/>
<enclosure url="https://newfarmnews.com.au/wp-content/uploads/2026/11/3.png" length="1946777" type="image/png"/>
<pubDate>Sun, 15 Nov 2026 18:31:27 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[Brisbane events]]></category>
<category><![CDATA[Brisbane Pride 2026]]></category>
<category><![CDATA[Brisbane Pride Fair Day]]></category>
<category><![CDATA[Fortitude Valley]]></category>
<category><![CDATA[LGBTQIA+ celebrations]]></category>
<category><![CDATA[new farm]]></category>
<category><![CDATA[New Farm Park]]></category>
<category><![CDATA[Pride March]]></category>
<dc:creator><![CDATA[New Farm News]]></dc:creator>
<guid isPermaLink="true">https://newfarmnews.com.au/?page_id=78783</guid>
<description><![CDATA[
Thousands of people joined Brisbane Pride celebrations as the annual rally and march made their way from Fortitude Valley to New Farm Park, where Fair Day featured live music, drag performances and community activities.



Read: Baby Rhyme Time Brings a Little Rhythm to Brisbane’s Libraries



The celebrations took place on Saturday 7 November 2026, following a two-week postponement caused by adverse weather. The event also brought Fair Day back to New Farm Park for the first time since 2022, as Brisbane Pride marked its 36th year. The day began with a rally in Fortitude Valley before participants marched towards New Farm Park, where crowds gathered for an afternoon of entertainment, market stalls and community activities.



Photo by Tina EastleyPhoto Credit: Brisbane Pride Inc./Facebook



Thousands Take Part In Brisbane Pride March



Participants assembled at the corner of Ann and Brunswick streets from 9am for the Brisbane Pride Rally and March. Intersex rights advocate Stephanie Saal was among the speakers addressing the crowd, with the rally focusing on issues affecting LGBTQIA+ people and ongoing calls for equality.



Following the speeches, marchers travelled approximately two kilometres towards New Farm Park, carrying rainbow flags and Pride colours through the streets. Brisbane Pride President James McCarthy acknowledged the turnout and the contributions of participants, performers and volunteers. He described the rally as an opportunity for people to express solidarity, while the march and Fair Day brought together different parts of Queensland's LGBTQIA+ communities. McCarthy also noted that the annual celebrations continued to combine public advocacy with social gatherings and entertainment.







Nearly 4,000 Gather For Fair Day At New Farm Park



Fair Day ran from 10am to 5pm, with attendance reported at nearly 4,000 people throughout the event. Australian dance-pop performer Joanne appeared on the main stage, joining a program of musical performances, drag acts and dance presentations hosted by Paul Wheeler and Miss Synthetique.



Among the entertainment was Broadway Pride, featuring Ja’mie Displays, Pheela Edging, Himbo Jones, Ella Vate and Eraya 51. Another performance brought together Freya Armani, Kim Schotte, Crimson Coco and Luna Thicc for a drag dance collaboration. Darumbal and Wulli-Wulli performer Garret Lyon also delivered an acoustic set, adding to the musical program at the park.




  Brisbane Pride 2026: Event Details

  
    
      Original date
      24 October 2026
    
    
      Actual event date
      Saturday 7 November 2026
    
    
      Reason for postponement
      Adverse weather conditions
    
    
      Rally starting point
      Ann and Brunswick streets, Fortitude Valley
    
    
      Fair Day location
      New Farm Park, Brunswick Street
    
    
      Fair Day hours
      10am to 5pm
    
    
      Previous Fair Day at New Farm Park
      2022
    
  



.pride-event-box {
  box-sizing: border-box;
  width: 100%;
  max-width: 680px;
  margin: 24px 0;
  padding: 20px;
  border: 1px solid #ddd;
  border-radius: 8px;
  background: #fafafa;
  color: #222;
  font-family: inherit;
}

.pride-event-box h3 {
  margin: 0 0 14px;
  font-size: 1.15rem;
  line-height: 1.4;
}

.pride-event-box dl {
  margin: 0;
}

.pride-event-box dl div {
  display: grid;
  grid-template-columns: minmax(130px, 1fr) 1.4fr;
  gap: 14px;
  padding: 10px 0;
  border-bottom: 1px solid #e5e5e5;
}

.pride-event-box dl div:last-child {
  border-bottom: 0;
}

.pride-event-box dt {
  font-weight: 600;
}

.pride-event-box dd {
  margin: 0;
  overflow-wrap: anywhere;
}

@media (max-width: 480px) {
  .pride-event-box {
    padding: 16px;
  }

  .pride-event-box dl div {
    grid-template-columns: 1fr;
    gap: 4px;
  }
}




Beyond the stage, attendees explored the Rainbow Markets, food stalls and displays operated by LGBTQIA+ community organisations. The Fair Day program brought together performers, vendors and community groups across the park.



Celebrations Return After Weather Postponement



Read: Queensland E-Bike Assurance Scheme: What Owners Need to Know



The rally, march and Fair Day had originally been scheduled for 24 October but were moved to 7 November after organisers postponed the events because of adverse weather conditions. The rescheduled celebrations also marked Fair Day's return to New Farm Park, which last hosted the event in 2022. Brisbane Pride's annual celebrations date back to 1990, with the 2026 program marking 36 years of organised Pride activities in Brisbane.



Published 11-November-2026




]]></description>
<content:encoded><![CDATA[
Thousands of people joined Brisbane Pride celebrations as the annual rally and march made their way from Fortitude Valley to New Farm Park, where Fair Day featured live music, drag performances and community activities.



Read: Baby Rhyme Time Brings a Little Rhythm to Brisbane’s Libraries



The celebrations took place on Saturday 7 November 2026, following a two-week postponement caused by adverse weather. The event also brought Fair Day back to New Farm Park for the first time since 2022, as Brisbane Pride marked its 36th year. The day began with a rally in Fortitude Valley before participants marched towards New Farm Park, where crowds gathered for an afternoon of entertainment, market stalls and community activities.



Photo by Tina EastleyPhoto Credit: Brisbane Pride Inc./Facebook



Thousands Take Part In Brisbane Pride March



Participants assembled at the corner of Ann and Brunswick streets from 9am for the Brisbane Pride Rally and March. Intersex rights advocate Stephanie Saal was among the speakers addressing the crowd, with the rally focusing on issues affecting LGBTQIA+ people and ongoing calls for equality.



Following the speeches, marchers travelled approximately two kilometres towards New Farm Park, carrying rainbow flags and Pride colours through the streets. Brisbane Pride President James McCarthy acknowledged the turnout and the contributions of participants, performers and volunteers. He described the rally as an opportunity for people to express solidarity, while the march and Fair Day brought together different parts of Queensland's LGBTQIA+ communities. McCarthy also noted that the annual celebrations continued to combine public advocacy with social gatherings and entertainment.







Nearly 4,000 Gather For Fair Day At New Farm Park



Fair Day ran from 10am to 5pm, with attendance reported at nearly 4,000 people throughout the event. Australian dance-pop performer Joanne appeared on the main stage, joining a program of musical performances, drag acts and dance presentations hosted by Paul Wheeler and Miss Synthetique.



Among the entertainment was Broadway Pride, featuring Ja’mie Displays, Pheela Edging, Himbo Jones, Ella Vate and Eraya 51. Another performance brought together Freya Armani, Kim Schotte, Crimson Coco and Luna Thicc for a drag dance collaboration. Darumbal and Wulli-Wulli performer Garret Lyon also delivered an acoustic set, adding to the musical program at the park.




  Brisbane Pride 2026: Event Details

  
    
      Original date
      24 October 2026
    
    
      Actual event date
      Saturday 7 November 2026
    
    
      Reason for postponement
      Adverse weather conditions
    
    
      Rally starting point
      Ann and Brunswick streets, Fortitude Valley
    
    
      Fair Day location
      New Farm Park, Brunswick Street
    
    
      Fair Day hours
      10am to 5pm
    
    
      Previous Fair Day at New Farm Park
      2022
    
  



.pride-event-box {
  box-sizing: border-box;
  width: 100%;
  max-width: 680px;
  margin: 24px 0;
  padding: 20px;
  border: 1px solid #ddd;
  border-radius: 8px;
  background: #fafafa;
  color: #222;
  font-family: inherit;
}

.pride-event-box h3 {
  margin: 0 0 14px;
  font-size: 1.15rem;
  line-height: 1.4;
}

.pride-event-box dl {
  margin: 0;
}

.pride-event-box dl div {
  display: grid;
  grid-template-columns: minmax(130px, 1fr) 1.4fr;
  gap: 14px;
  padding: 10px 0;
  border-bottom: 1px solid #e5e5e5;
}

.pride-event-box dl div:last-child {
  border-bottom: 0;
}

.pride-event-box dt {
  font-weight: 600;
}

.pride-event-box dd {
  margin: 0;
  overflow-wrap: anywhere;
}

@media (max-width: 480px) {
  .pride-event-box {
    padding: 16px;
  }

  .pride-event-box dl div {
    grid-template-columns: 1fr;
    gap: 4px;
  }
}




Beyond the stage, attendees explored the Rainbow Markets, food stalls and displays operated by LGBTQIA+ community organisations. The Fair Day program brought together performers, vendors and community groups across the park.



Celebrations Return After Weather Postponement



Read: Queensland E-Bike Assurance Scheme: What Owners Need to Know



The rally, march and Fair Day had originally been scheduled for 24 October but were moved to 7 November after organisers postponed the events because of adverse weather conditions. The rescheduled celebrations also marked Fair Day's return to New Farm Park, which last hosted the event in 2022. Brisbane Pride's annual celebrations date back to 1990, with the 2026 program marking 36 years of organised Pride activities in Brisbane.



Published 11-November-2026




]]></content:encoded>
</item><item>
<title><![CDATA[Queensland E-Bike Assurance Scheme: What Owners Need to Know]]></title>
<link>https://newfarmnews.com.au/queensland-e-bike-assurance-scheme-inspection-centres-2026/queensland-e-bike-assurance-scheme-inspection-centres-2026</link>
<media:content url="https://newfarmnews.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes.png" medium="image"/>
<media:thumbnail url="https://newfarmnews.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes.png"/>
<enclosure url="https://newfarmnews.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes.png" length="1452970" type="image/png"/>
<pubDate>Wed, 11 Nov 2026 03:16:22 +0000</pubDate>
<dc:creator><![CDATA[New Farm News]]></dc:creator>
<guid isPermaLink="true">https://newfarmnews.com.au/queensland-e-bike-assurance-scheme-inspection-centres-2026/</guid>
<description><![CDATA[


Queensland e-bike owners facing new compliance requirements have only nine authorised inspection centres available statewide, with no locations currently listed in several major regional cities.



The Electrically Power-Assisted Cycle (EPAC) Assurance Scheme commenced on 2 November 2026, allowing owners of eligible older e-bikes to have their devices inspected and approved for continued legal use. However, the initial network consists entirely of Trek bicycle stores, most of them concentrated in south-east Queensland.



The state's official directory of authorised verifiers lists three centres in Brisbane, two on the Gold Coast, and one each in Ipswich, Moreton Bay, the Sunshine Coast and Rockhampton. There are no authorised locations currently listed in Townsville, Cairns, Toowoomba or Mackay.



Owners requiring verification must book an appointment and bring their e-bike to an approved retailer. The Department of Transport and Main Roads advises that appointments may take a couple of weeks, depending on individual store capacity.



The department expects additional retailers to join the program over the coming months. Alternative arrangements are also being developed for rural and remote residents without reasonable access to a verifier, with further details expected in early 2027.



Which e-bikes need inspection?



The scheme primarily covers eligible e-bikes manufactured before 1 July 2026 that do not meet the European EN 15194 standard or lack the required compliance label.



To qualify, these older bicycles must have pedals as their primary source of power, a maximum continuous rated motor output of 250 watts, and motor assistance that stops at 25 km/h. Where throttle control is fitted, throttle-only assistance must be limited to 6 km/h to help riders start moving.



Devices must also satisfy other technical and safety requirements before an authorised retailer can approve them. E-bikes that already meet EN 15194 and display the required compliance label do not need another inspection.



For eligible older bicycles, the initial pre-screening is free. A formal assessment may cost up to $50, with a further $20 permitted for issuing a permanent compliance label and recording the verification.



Owners covered by the transition arrangements have until 28 February 2027 to obtain the required label. From 1 March 2027, e-bikes that need verification must display the appropriate compliance label to continue being ridden legally in public.



The scheme cannot be used to legalise high-powered, high-speed or illegally modified devices. It also provides a separate pathway for certain e-bikes and e-trikes designed or adapted for people with disabilities or medical conditions.



A label issued through the scheme confirms that an eligible device has met Queensland's verification requirements. It does not certify full compliance with the European EN 15194 standard.






  
    Queensland E-Bike Inspections: What Owners Need to Know
  

  
    Queensland's new EPAC Assurance Scheme allows eligible older e-bikes to be inspected and approved for continued legal use.
  

  
    Scheme commenced: 2 November 2026
    Compliance deadline: 28 February 2027
    Initial screening: Free
    Formal inspection: Up to $50
    Compliance label: Up to $20
    Total possible cost: $70
    Authorised locations: Nine across Queensland at launch
    Already compliant? E-bikes meeting EN 15194 and displaying the required label do not need another inspection.
    Bookings: Appointments must be arranged with an authorised retailer.
  

  
    Important: The scheme does not legalise high-powered, high-speed or illegally modified devices.
  

  
    Source:
    
      Queensland Department of Transport and Main Roads – EPAC Assurance Scheme
    
  






Cycling advocates highlight the cost of compliance



Bicycle Queensland has supported clearer rules distinguishing lawful pedal-assisted bicycles from illegal high-powered devices, while the cost and accessibility of verification remain concerns for cycling advocates.



In its published explanation of the new laws, the organisation outlines the inspection process and the potential $70 charge facing owners whose existing bicycles require verification.



The fee applies to the formal assessment and labelling process rather than every e-bike owner. Riders whose bicycles already carry the correct EN 15194 label are not required to pay for another inspection.



The limited number of participating retailers also presents a practical question for people living far from an inspection centre, particularly those who rely on their e-bikes for everyday transport.



Bicycle Industries Australia has welcomed the scheme. Its general manager, Peter Bourke, has supported measures that help riders access safe, legal products and said the program would allow bicycle businesses to assist owners in establishing whether their devices meet Queensland's requirements.



The Department of Transport and Main Roads has described the scheme as a practical way for owners of legitimate existing e-bikes to continue riding, while keeping dangerous high-powered and high-speed devices off public roads and paths.



Research shows e-bikes are used across Queensland



The availability of inspection centres takes on wider significance when considered alongside new research into the growing number of Queenslanders using electric bicycles and other e-mobility devices.



A University of Queensland study, released on 21 October 2026, estimated that Queenslanders owned approximately 587,000 e-bikes, accounting for 61 per cent of privately owned e-mobility devices. The study also estimated 352,100 e-scooters and 30,400 other devices.



Researchers found that one in three Queensland households owned an e-mobility device, with total household spending on the devices estimated at $2.2 billion. Ownership was not confined to metropolitan areas. The study found that 28 per cent of households in remote Queensland reported owning an e-mobility device, reinforcing the importance of access to transport options outside major cities.



For one in four e-mobility users surveyed, a private car was their only alternative means of transport. More than half of the primary users of privately owned devices were aged 50 or older. The findings point to the role electric transport now plays in everyday travel, from commuting and shopping to recreation and maintaining independence.



However, the estimated 587,000 e-bikes do not represent the number requiring inspection under the new scheme. Many already meet the relevant standards, while others may be ineligible for verification.



The research also identified safety concerns. About half of privately owned e-mobility devices were classified as non-compliant based on owners' self-reported speed, motor power and throttle characteristics.



Researchers cautioned that the findings covered different types of e-mobility devices and did not establish how many existing e-bikes would require inspection or replacement compliance labels.



Safety reforms target illegal high-powered devices



The assurance scheme forms part of Queensland's broader e-mobility reforms, introduced amid concerns about serious injuries, unsafe riding and devices capable of travelling well beyond the permitted limits.



New rules introduced during 2026 include restrictions on motor power and speed, tighter age and licensing requirements, and expanded police enforcement powers.



Under the state's current e-bike rules, bicycles powered by motors exceeding 250 watts of maximum continuous rated output cannot legally be ridden on public roads or paths as ordinary e-bikes. Devices that depend entirely on throttle power, rather than pedalling, are also prohibited, apart from the limited starting assistance permitted under the rules. Police can issue significant fines and seize illegal devices.



Transport authorities say the verification process is intended to distinguish suitable older bicycles from machines that fail the state's safety requirements. The scheme gives owners of qualifying existing e-bikes a means of keeping their bicycles on the road without requiring them to meet every provision of the European standard introduced for newer devices.



Where owners can get their e-bikes checked



As of 11 November 2026, the Queensland Government lists nine authorised inspection centres, all operated by Trek Bicycle.



RegionAuthorised inspection centreBrisbaneTrek CarindaleBrisbaneTrek WindsorBrisbaneTrek WoolloongabbaIpswichTrek Ipswich, East IpswichMoreton BayTrek North LakesGold CoastTrek Ashmore, MolendinarGold CoastTrek Burleigh HeadsSunshine CoastTrek Sunshine Coast, MinyamaCentral QueenslandTrek Rockhampton, Norman Gardens



Source: Queensland Department of Transport and Main Roads, EPAC Assurance Scheme authorised verifier directory. The government has advised owners to check the directory regularly as more retailers join the scheme.



Owners must contact an authorised retailer to arrange an inspection before visiting. The department recommends bringing any available information about the bicycle's make, model, purchase date and technical specifications.



For eligible riders whose bicycles still need verification, the transition period provides an opportunity to arrange an inspection before the February deadline. Whether the expanding network reaches more regional communities before then remains an important question as the scheme progresses.



Published 10-Nov-2026Featured Image Credit: Brisbane City Council




]]></description>
<content:encoded><![CDATA[


Queensland e-bike owners facing new compliance requirements have only nine authorised inspection centres available statewide, with no locations currently listed in several major regional cities.



The Electrically Power-Assisted Cycle (EPAC) Assurance Scheme commenced on 2 November 2026, allowing owners of eligible older e-bikes to have their devices inspected and approved for continued legal use. However, the initial network consists entirely of Trek bicycle stores, most of them concentrated in south-east Queensland.



The state's official directory of authorised verifiers lists three centres in Brisbane, two on the Gold Coast, and one each in Ipswich, Moreton Bay, the Sunshine Coast and Rockhampton. There are no authorised locations currently listed in Townsville, Cairns, Toowoomba or Mackay.



Owners requiring verification must book an appointment and bring their e-bike to an approved retailer. The Department of Transport and Main Roads advises that appointments may take a couple of weeks, depending on individual store capacity.



The department expects additional retailers to join the program over the coming months. Alternative arrangements are also being developed for rural and remote residents without reasonable access to a verifier, with further details expected in early 2027.



Which e-bikes need inspection?



The scheme primarily covers eligible e-bikes manufactured before 1 July 2026 that do not meet the European EN 15194 standard or lack the required compliance label.



To qualify, these older bicycles must have pedals as their primary source of power, a maximum continuous rated motor output of 250 watts, and motor assistance that stops at 25 km/h. Where throttle control is fitted, throttle-only assistance must be limited to 6 km/h to help riders start moving.



Devices must also satisfy other technical and safety requirements before an authorised retailer can approve them. E-bikes that already meet EN 15194 and display the required compliance label do not need another inspection.



For eligible older bicycles, the initial pre-screening is free. A formal assessment may cost up to $50, with a further $20 permitted for issuing a permanent compliance label and recording the verification.



Owners covered by the transition arrangements have until 28 February 2027 to obtain the required label. From 1 March 2027, e-bikes that need verification must display the appropriate compliance label to continue being ridden legally in public.



The scheme cannot be used to legalise high-powered, high-speed or illegally modified devices. It also provides a separate pathway for certain e-bikes and e-trikes designed or adapted for people with disabilities or medical conditions.



A label issued through the scheme confirms that an eligible device has met Queensland's verification requirements. It does not certify full compliance with the European EN 15194 standard.






  
    Queensland E-Bike Inspections: What Owners Need to Know
  

  
    Queensland's new EPAC Assurance Scheme allows eligible older e-bikes to be inspected and approved for continued legal use.
  

  
    Scheme commenced: 2 November 2026
    Compliance deadline: 28 February 2027
    Initial screening: Free
    Formal inspection: Up to $50
    Compliance label: Up to $20
    Total possible cost: $70
    Authorised locations: Nine across Queensland at launch
    Already compliant? E-bikes meeting EN 15194 and displaying the required label do not need another inspection.
    Bookings: Appointments must be arranged with an authorised retailer.
  

  
    Important: The scheme does not legalise high-powered, high-speed or illegally modified devices.
  

  
    Source:
    
      Queensland Department of Transport and Main Roads – EPAC Assurance Scheme
    
  






Cycling advocates highlight the cost of compliance



Bicycle Queensland has supported clearer rules distinguishing lawful pedal-assisted bicycles from illegal high-powered devices, while the cost and accessibility of verification remain concerns for cycling advocates.



In its published explanation of the new laws, the organisation outlines the inspection process and the potential $70 charge facing owners whose existing bicycles require verification.



The fee applies to the formal assessment and labelling process rather than every e-bike owner. Riders whose bicycles already carry the correct EN 15194 label are not required to pay for another inspection.



The limited number of participating retailers also presents a practical question for people living far from an inspection centre, particularly those who rely on their e-bikes for everyday transport.



Bicycle Industries Australia has welcomed the scheme. Its general manager, Peter Bourke, has supported measures that help riders access safe, legal products and said the program would allow bicycle businesses to assist owners in establishing whether their devices meet Queensland's requirements.



The Department of Transport and Main Roads has described the scheme as a practical way for owners of legitimate existing e-bikes to continue riding, while keeping dangerous high-powered and high-speed devices off public roads and paths.



Research shows e-bikes are used across Queensland



The availability of inspection centres takes on wider significance when considered alongside new research into the growing number of Queenslanders using electric bicycles and other e-mobility devices.



A University of Queensland study, released on 21 October 2026, estimated that Queenslanders owned approximately 587,000 e-bikes, accounting for 61 per cent of privately owned e-mobility devices. The study also estimated 352,100 e-scooters and 30,400 other devices.



Researchers found that one in three Queensland households owned an e-mobility device, with total household spending on the devices estimated at $2.2 billion. Ownership was not confined to metropolitan areas. The study found that 28 per cent of households in remote Queensland reported owning an e-mobility device, reinforcing the importance of access to transport options outside major cities.



For one in four e-mobility users surveyed, a private car was their only alternative means of transport. More than half of the primary users of privately owned devices were aged 50 or older. The findings point to the role electric transport now plays in everyday travel, from commuting and shopping to recreation and maintaining independence.



However, the estimated 587,000 e-bikes do not represent the number requiring inspection under the new scheme. Many already meet the relevant standards, while others may be ineligible for verification.



The research also identified safety concerns. About half of privately owned e-mobility devices were classified as non-compliant based on owners' self-reported speed, motor power and throttle characteristics.



Researchers cautioned that the findings covered different types of e-mobility devices and did not establish how many existing e-bikes would require inspection or replacement compliance labels.



Safety reforms target illegal high-powered devices



The assurance scheme forms part of Queensland's broader e-mobility reforms, introduced amid concerns about serious injuries, unsafe riding and devices capable of travelling well beyond the permitted limits.



New rules introduced during 2026 include restrictions on motor power and speed, tighter age and licensing requirements, and expanded police enforcement powers.



Under the state's current e-bike rules, bicycles powered by motors exceeding 250 watts of maximum continuous rated output cannot legally be ridden on public roads or paths as ordinary e-bikes. Devices that depend entirely on throttle power, rather than pedalling, are also prohibited, apart from the limited starting assistance permitted under the rules. Police can issue significant fines and seize illegal devices.



Transport authorities say the verification process is intended to distinguish suitable older bicycles from machines that fail the state's safety requirements. The scheme gives owners of qualifying existing e-bikes a means of keeping their bicycles on the road without requiring them to meet every provision of the European standard introduced for newer devices.



Where owners can get their e-bikes checked



As of 11 November 2026, the Queensland Government lists nine authorised inspection centres, all operated by Trek Bicycle.



RegionAuthorised inspection centreBrisbaneTrek CarindaleBrisbaneTrek WindsorBrisbaneTrek WoolloongabbaIpswichTrek Ipswich, East IpswichMoreton BayTrek North LakesGold CoastTrek Ashmore, MolendinarGold CoastTrek Burleigh HeadsSunshine CoastTrek Sunshine Coast, MinyamaCentral QueenslandTrek Rockhampton, Norman Gardens



Source: Queensland Department of Transport and Main Roads, EPAC Assurance Scheme authorised verifier directory. The government has advised owners to check the directory regularly as more retailers join the scheme.



Owners must contact an authorised retailer to arrange an inspection before visiting. The department recommends bringing any available information about the bicycle's make, model, purchase date and technical specifications.



For eligible riders whose bicycles still need verification, the transition period provides an opportunity to arrange an inspection before the February deadline. Whether the expanding network reaches more regional communities before then remains an important question as the scheme progresses.



Published 10-Nov-2026Featured Image Credit: Brisbane City Council




]]></content:encoded>
</item><item>
<title><![CDATA[Baby Rhyme Time Brings a Little Rhythm to Brisbane’s Libraries]]></title>
<link>https://newfarmnews.com.au/baby-rhyme-time-brings-a-little-rhythm-to-brisbanes-libraries/baby-rhyme-time-brings-a-little-rhythm-to-brisbanes-libraries</link>
<media:content url="https://newfarmnews.com.au/wp-content/uploads/2026/10/BSON_First5Forever-1.jpg" medium="image"/>
<media:thumbnail url="https://newfarmnews.com.au/wp-content/uploads/2026/10/BSON_First5Forever-1.jpg"/>
<enclosure url="https://newfarmnews.com.au/wp-content/uploads/2026/10/BSON_First5Forever-1.jpg" length="82202" type="image/jpeg"/>
<pubDate>Wed, 28 Oct 2026 06:36:44 +0000</pubDate>
<dc:creator><![CDATA[New Farm News]]></dc:creator>
<guid isPermaLink="true">https://newfarmnews.com.au/baby-rhyme-time-brings-a-little-rhythm-to-brisbanes-libraries/</guid>
<description><![CDATA[


Baby rhyme time is one of those small library events that quietly earns its keep. It is free, simple and aimed at babies up to one year old. The November schedule shows it at Indooroopilly, with the wider run also reaching libraries across Brisbane. That makes it an easy one for local families to actually use.



A quick outing that feels close to home 



The event page keeps things plain. Families can meet other parents and babies for singing, clapping and dancing. There is no booking needed, which keeps the whole thing easy. At the same time, places are limited, so a session can close if it fills up.



That balance suits a library pretty well. It is open, but not chaotic. It is friendly, but still orderly. For parents juggling naps, bottles and everything else, that sort of setup matters more than people might think. 



The bigger schedule gives the program a wider reach. Alongside Indooroopilly, it also shows sessions at places like Holland Park, Chermside, Carina, Banyo, Nundah and Zillmere. So this is not just one nice little event in one suburb. It is a regular community rhythm across several parts of the city. 



The kind of noise libraries can welcome 



Baby rhyme time works because it is built for the early months. The event listing says the songs and action rhymes help nurture pre-literacy, communication, language and social skills. That sounds formal, but the idea behind it is pretty simple. Babies hear words, watch faces and start getting used to the sound of language. 



That is where libraries come into their own. They are already calm places. They already belong to the community. So a session like this feels natural there, not bolted on. 



And honestly, that is part of the appeal. Parents do not need a grand plan for the morning. They just need something local, useful and low-fuss. Baby rhyme time gives them that. 



A small session worth repeating 



First 5 Forever backs the program, with the State Library of Queensland coordinating it in partnership with local government. That gives the session a proper public purpose, but the benefit is still felt at the local level. One suburb gets a room full of songs. Another suburb gets the same thing on a different day. 



That is the charm of it. Baby rhyme time is not trying to be bigger than it needs to be. It just gives babies, parents and carers a warm little place to start. In a city as busy as Brisbane, that feels worth keeping on the calendar.




  
    
      Place
      Date
      Time
    
  
  
    Annerley Library11/6/20269:15AM - 9:45 AM
    Annerley Library11/13/20269:15AM - 9:45 AM
    Annerley Library11/20/20269:15AM - 9:45 AM
    Annerley Library11/27/20269:15AM - 9:45 AM

    Ashgrove Library11/4/20269:30AM - 10:00 AM
    Ashgrove Library11/11/20269:30AM - 10:00 AM
    Ashgrove Library11/18/20269:30AM - 10:00 AM
    Ashgrove Library11/25/20269:30AM - 10:00 AM

    Banyo Library11/5/202611:30AM - 12:00PM
    Banyo Library11/12/202611:30AM - 12:00PM
    Banyo Library11/19/202611:30AM - 12:00PM
    Banyo Library11/26/202611:30AM - 12:00PM

    Bracken Ridge Library11/6/202610:00AM - 10:30 AM
    Bracken Ridge Library11/13/202610:00AM - 10:30 AM
    Bracken Ridge Library11/20/202610:00AM - 10:30 AM
    Bracken Ridge Library11/27/202610:00AM - 10:30 AM

    Brisbane Square Library11/5/202611:30AM - 12:00PM
    Brisbane Square Library11/12/202611:30AM - 12:00PM
    Brisbane Square Library11/19/202611:30AM - 12:00PM
    Brisbane Square Library11/26/202611:30AM - 12:00PM

    Bulimba Library11/5/202610:00AM - 10:30 AM
    Bulimba Library11/12/202610:00AM - 10:30 AM
    Bulimba Library11/19/202610:00AM - 10:30 AM
    Bulimba Library11/26/202610:00AM - 10:30 AM

    Carina Library11/2/202610:30AM- 11:00AM
    Carina Library11/9/202610:30AM- 11:00AM
    Carina Library11/16/202610:30AM- 11:00AM
    Carina Library11/23/202610:30AM- 11:00AM
    Carina Library11/30/202610:30AM- 11:00AM

    Carindale Library11/3/202610:45AM - 11:15AM
    Carindale Library11/4/202610:30AM- 11:00AM
    Carindale Library11/10/202610:45AM - 11:15AM
    Carindale Library11/11/202610:00AM - 10:30 AM
    Carindale Library11/17/202610:45AM - 11:15AM
    Carindale Library11/18/202610:00AM - 10:30 AM
    Carindale Library11/24/202610:45AM - 11:15AM
    Carindale Library11/25/202610:00AM - 10:30 AM

    Chermside Library11/3/202610:00AM - 10:30 AM
    Chermside Library11/3/202611:00AM - 11:30 AM
    Chermside Library11/4/202611:00AM - 11:30 AM
    Chermside Library11/10/202610:00AM - 10:30 AM
    Chermside Library11/10/202611:00AM - 11:30 AM
    Chermside Library11/11/202611:00AM - 11:30 AM
    Chermside Library11/17/202610:00AM - 10:30 AM
    Chermside Library11/17/202611:00AM - 11:30 AM
    Chermside Library11/18/202611:00AM - 11:30 AM
    Chermside Library11/24/202610:00AM - 10:30 AM
    Chermside Library11/24/202611:00AM - 11:30 AM
    Chermside Library11/25/202611:00AM - 11:30 AM

    Coopers Plain Library11/5/202610:00AM - 10:30 AM
    Coopers Plain Library11/12/202610:00AM - 10:30 AM
    Coopers Plain Library11/19/202610:00AM - 10:30 AM
    Coopers Plain Library11/26/202610:00AM - 10:30 AM

    Corinda Library11/6/20269:15AM - 9:45 AM
    Corinda Library11/13/20269:15AM - 9:45 AM
    Corinda Library11/20/20269:15AM - 9:45 AM
    Corinda Library11/27/20269:15AM - 9:45 AM

    Everton Park LIbrary11/3/202611:00AM - 11:30 AM
    Everton Park LIbrary11/10/202611:00AM - 11:30 AM
    Everton Park LIbrary11/17/202611:00AM - 11:30 AM
    Everton Park LIbrary11/24/202611:00AM - 11:30 AM

    Fairfield Library11/4/20269:30AM - 10:00 AM
    Fairfield Library11/11/20269:30AM - 10:00 AM
    Fairfield Library11/18/20269:30AM - 10:00 AM
    Fairfield Library11/25/20269:30AM - 10:00 AM

    Garden City Library11/2/202610:30AM- 11:00AM
    Garden City Library11/4/202610:30AM- 11:00AM
    Garden City Library11/9/202610:30AM- 11:00AM
    Garden City Library11/11/202610:30AM- 11:00AM
    Garden City Library11/16/202610:30AM- 11:00AM
    Garden City Library11/18/202610:30AM- 11:00AM
    Garden City Library11/23/202610:30AM- 11:00AM
    Garden City Library11/25/202610:30AM- 11:00AM
    Garden City Library11/30/202610:30AM- 11:00AM

    Grange Library11/5/202611:15AM - 11:45AM
    Grange Library11/12/202611:15AM - 11:45AM
    Grange Library11/19/202611:15AM - 11:45AM
    Grange Library11/26/202611:15AM - 11:45AM

    Holland Park Library11/4/20262:00PM - 2:30PM
    Holland Park Library11/11/20262:00PM - 2:30PM
    Holland Park Library11/18/20262:00PM - 2:30PM
    Holland Park Library11/25/20262:00PM - 2:30PM

    Inala Library11/3/20262:00PM - 2:30PM
    Inala Library11/10/20262:00PM - 2:30PM
    Inala Library11/17/20262:00PM - 2:30PM
    Inala Library11/24/20262:00PM - 2:30PM

    Indooroopilly Library11/2/202610:15AM - 10:45AM
    Indooroopilly Library11/6/202610:15AM - 10:45AM
    Indooroopilly Library11/9/202610:15AM - 10:45AM
    Indooroopilly Library11/13/202610:15AM - 10:45AM
    Indooroopilly Library11/16/202610:15AM - 10:45AM
    Indooroopilly Library11/20/202610:15AM - 10:45AM
    Indooroopilly Library11/23/202610:15AM - 10:45AM
    Indooroopilly Library11/27/202610:15AM - 10:45AM
    Indooroopilly Library11/30/202610:15AM - 10:45AM

    Kenmore Library11/4/202610:30AM- 11:00AM
    Kenmore Library11/11/202610:30AM- 11:00AM
    Kenmore Library11/18/202610:30AM- 11:00AM
    Kenmore Library11/25/202610:30AM- 11:00AM

    Mitchelton Library11/6/202611:00AM - 11:30 AM
    Mitchelton Library11/13/202611:00AM - 11:30 AM
    Mitchelton Library11/20/202611:00AM - 11:30 AM
    Mitchelton Library11/27/202611:00AM - 11:30 AM

    Mount Gravatt Library11/6/20269:30AM - 10:00 AM
    Mount Gravatt Library11/13/20269:30AM - 10:00 AM
    Mount Gravatt Library11/20/20269:30AM - 10:00 AM
    Mount Gravatt Library11/27/20269:30AM - 10:00 AM

    Mt Ommaney Library11/4/20269:30AM - 10:00 AM
    Mt Ommaney Library11/11/20269:30AM - 10:00 AM
    Mt Ommaney Library11/18/20269:30AM - 10:00 AM
    Mt Ommaney Library11/25/20269:30AM - 10:00 AM

    New Farm Library11/4/202611:00AM - 11:30 AM
    New Farm Library11/11/202611:00AM - 11:30 AM
    New Farm Library11/18/202611:00AM - 11:30 AM
    New Farm Library11/25/202611:00AM - 11:30 AM

    Nundah Library11/5/20269:30AM - 10:00 AM
    Nundah Library11/12/20269:30AM - 10:00 AM
    Nundah Library11/19/20269:30AM - 10:00 AM
    Nundah Library11/26/20269:30AM - 10:00 AM

    Sandgate Library11/6/202610:00AM - 10:30 AM
    Sandgate Library11/13/202610:00AM - 10:30 AM
    Sandgate Library11/20/202610:00AM - 10:30 AM
    Sandgate Library11/27/202610:00AM - 10:30 AM

    Stones Corner Library11/6/20269:30AM - 10:00 AM
    Stones Corner Library11/13/20269:30AM - 10:00 AM
    Stones Corner Library11/20/20269:30AM - 10:00 AM
    Stones Corner Library11/27/20269:30AM - 10:00 AM

    Sunnybank Hills Library11/2/202610:30AM- 11:00AM
    Sunnybank Hills Library11/9/202610:30AM- 11:00AM
    Sunnybank Hills Library11/16/202610:30AM- 11:00AM
    Sunnybank Hills Library11/23/202610:30AM- 11:00AM
    Sunnybank Hills Library11/30/202610:30AM- 11:00AM

    Toowong Library11/3/202611:30AM - 12:00PM
    Toowong Library11/10/202611:30AM - 12:00PM
    Toowong Library11/17/202611:30AM - 12:00PM
    Toowong Library11/24/202611:30AM - 12:00PM

    West End Library11/4/20269:15AM - 9:45 AM
    West End Library11/11/20269:15AM - 9:45 AM
    West End Library11/18/20269:15AM - 9:45 AM
    West End Library11/25/20269:15AM - 9:45 AM

    Wynnum Library11/6/20269:15AM - 9:45 AM
    Wynnum Library11/13/20269:15AM - 9:45 AM
    Wynnum Library11/20/20269:15AM - 9:45 AM
    Wynnum Library11/27/20269:15AM - 9:45 AM

    Zillmere Library11/5/202610:30AM- 11:00AM
    Zillmere Library11/12/202610:30AM- 11:00AM
    Zillmere Library11/19/202610:30AM- 11:00AM
    Zillmere Library11/26/202610:30AM- 11:00AM
  




Published 28-October-2026
]]></description>
<content:encoded><![CDATA[


Baby rhyme time is one of those small library events that quietly earns its keep. It is free, simple and aimed at babies up to one year old. The November schedule shows it at Indooroopilly, with the wider run also reaching libraries across Brisbane. That makes it an easy one for local families to actually use.



A quick outing that feels close to home 



The event page keeps things plain. Families can meet other parents and babies for singing, clapping and dancing. There is no booking needed, which keeps the whole thing easy. At the same time, places are limited, so a session can close if it fills up.



That balance suits a library pretty well. It is open, but not chaotic. It is friendly, but still orderly. For parents juggling naps, bottles and everything else, that sort of setup matters more than people might think. 



The bigger schedule gives the program a wider reach. Alongside Indooroopilly, it also shows sessions at places like Holland Park, Chermside, Carina, Banyo, Nundah and Zillmere. So this is not just one nice little event in one suburb. It is a regular community rhythm across several parts of the city. 



The kind of noise libraries can welcome 



Baby rhyme time works because it is built for the early months. The event listing says the songs and action rhymes help nurture pre-literacy, communication, language and social skills. That sounds formal, but the idea behind it is pretty simple. Babies hear words, watch faces and start getting used to the sound of language. 



That is where libraries come into their own. They are already calm places. They already belong to the community. So a session like this feels natural there, not bolted on. 



And honestly, that is part of the appeal. Parents do not need a grand plan for the morning. They just need something local, useful and low-fuss. Baby rhyme time gives them that. 



A small session worth repeating 



First 5 Forever backs the program, with the State Library of Queensland coordinating it in partnership with local government. That gives the session a proper public purpose, but the benefit is still felt at the local level. One suburb gets a room full of songs. Another suburb gets the same thing on a different day. 



That is the charm of it. Baby rhyme time is not trying to be bigger than it needs to be. It just gives babies, parents and carers a warm little place to start. In a city as busy as Brisbane, that feels worth keeping on the calendar.




  
    
      Place
      Date
      Time
    
  
  
    Annerley Library11/6/20269:15AM - 9:45 AM
    Annerley Library11/13/20269:15AM - 9:45 AM
    Annerley Library11/20/20269:15AM - 9:45 AM
    Annerley Library11/27/20269:15AM - 9:45 AM

    Ashgrove Library11/4/20269:30AM - 10:00 AM
    Ashgrove Library11/11/20269:30AM - 10:00 AM
    Ashgrove Library11/18/20269:30AM - 10:00 AM
    Ashgrove Library11/25/20269:30AM - 10:00 AM

    Banyo Library11/5/202611:30AM - 12:00PM
    Banyo Library11/12/202611:30AM - 12:00PM
    Banyo Library11/19/202611:30AM - 12:00PM
    Banyo Library11/26/202611:30AM - 12:00PM

    Bracken Ridge Library11/6/202610:00AM - 10:30 AM
    Bracken Ridge Library11/13/202610:00AM - 10:30 AM
    Bracken Ridge Library11/20/202610:00AM - 10:30 AM
    Bracken Ridge Library11/27/202610:00AM - 10:30 AM

    Brisbane Square Library11/5/202611:30AM - 12:00PM
    Brisbane Square Library11/12/202611:30AM - 12:00PM
    Brisbane Square Library11/19/202611:30AM - 12:00PM
    Brisbane Square Library11/26/202611:30AM - 12:00PM

    Bulimba Library11/5/202610:00AM - 10:30 AM
    Bulimba Library11/12/202610:00AM - 10:30 AM
    Bulimba Library11/19/202610:00AM - 10:30 AM
    Bulimba Library11/26/202610:00AM - 10:30 AM

    Carina Library11/2/202610:30AM- 11:00AM
    Carina Library11/9/202610:30AM- 11:00AM
    Carina Library11/16/202610:30AM- 11:00AM
    Carina Library11/23/202610:30AM- 11:00AM
    Carina Library11/30/202610:30AM- 11:00AM

    Carindale Library11/3/202610:45AM - 11:15AM
    Carindale Library11/4/202610:30AM- 11:00AM
    Carindale Library11/10/202610:45AM - 11:15AM
    Carindale Library11/11/202610:00AM - 10:30 AM
    Carindale Library11/17/202610:45AM - 11:15AM
    Carindale Library11/18/202610:00AM - 10:30 AM
    Carindale Library11/24/202610:45AM - 11:15AM
    Carindale Library11/25/202610:00AM - 10:30 AM

    Chermside Library11/3/202610:00AM - 10:30 AM
    Chermside Library11/3/202611:00AM - 11:30 AM
    Chermside Library11/4/202611:00AM - 11:30 AM
    Chermside Library11/10/202610:00AM - 10:30 AM
    Chermside Library11/10/202611:00AM - 11:30 AM
    Chermside Library11/11/202611:00AM - 11:30 AM
    Chermside Library11/17/202610:00AM - 10:30 AM
    Chermside Library11/17/202611:00AM - 11:30 AM
    Chermside Library11/18/202611:00AM - 11:30 AM
    Chermside Library11/24/202610:00AM - 10:30 AM
    Chermside Library11/24/202611:00AM - 11:30 AM
    Chermside Library11/25/202611:00AM - 11:30 AM

    Coopers Plain Library11/5/202610:00AM - 10:30 AM
    Coopers Plain Library11/12/202610:00AM - 10:30 AM
    Coopers Plain Library11/19/202610:00AM - 10:30 AM
    Coopers Plain Library11/26/202610:00AM - 10:30 AM

    Corinda Library11/6/20269:15AM - 9:45 AM
    Corinda Library11/13/20269:15AM - 9:45 AM
    Corinda Library11/20/20269:15AM - 9:45 AM
    Corinda Library11/27/20269:15AM - 9:45 AM

    Everton Park LIbrary11/3/202611:00AM - 11:30 AM
    Everton Park LIbrary11/10/202611:00AM - 11:30 AM
    Everton Park LIbrary11/17/202611:00AM - 11:30 AM
    Everton Park LIbrary11/24/202611:00AM - 11:30 AM

    Fairfield Library11/4/20269:30AM - 10:00 AM
    Fairfield Library11/11/20269:30AM - 10:00 AM
    Fairfield Library11/18/20269:30AM - 10:00 AM
    Fairfield Library11/25/20269:30AM - 10:00 AM

    Garden City Library11/2/202610:30AM- 11:00AM
    Garden City Library11/4/202610:30AM- 11:00AM
    Garden City Library11/9/202610:30AM- 11:00AM
    Garden City Library11/11/202610:30AM- 11:00AM
    Garden City Library11/16/202610:30AM- 11:00AM
    Garden City Library11/18/202610:30AM- 11:00AM
    Garden City Library11/23/202610:30AM- 11:00AM
    Garden City Library11/25/202610:30AM- 11:00AM
    Garden City Library11/30/202610:30AM- 11:00AM

    Grange Library11/5/202611:15AM - 11:45AM
    Grange Library11/12/202611:15AM - 11:45AM
    Grange Library11/19/202611:15AM - 11:45AM
    Grange Library11/26/202611:15AM - 11:45AM

    Holland Park Library11/4/20262:00PM - 2:30PM
    Holland Park Library11/11/20262:00PM - 2:30PM
    Holland Park Library11/18/20262:00PM - 2:30PM
    Holland Park Library11/25/20262:00PM - 2:30PM

    Inala Library11/3/20262:00PM - 2:30PM
    Inala Library11/10/20262:00PM - 2:30PM
    Inala Library11/17/20262:00PM - 2:30PM
    Inala Library11/24/20262:00PM - 2:30PM

    Indooroopilly Library11/2/202610:15AM - 10:45AM
    Indooroopilly Library11/6/202610:15AM - 10:45AM
    Indooroopilly Library11/9/202610:15AM - 10:45AM
    Indooroopilly Library11/13/202610:15AM - 10:45AM
    Indooroopilly Library11/16/202610:15AM - 10:45AM
    Indooroopilly Library11/20/202610:15AM - 10:45AM
    Indooroopilly Library11/23/202610:15AM - 10:45AM
    Indooroopilly Library11/27/202610:15AM - 10:45AM
    Indooroopilly Library11/30/202610:15AM - 10:45AM

    Kenmore Library11/4/202610:30AM- 11:00AM
    Kenmore Library11/11/202610:30AM- 11:00AM
    Kenmore Library11/18/202610:30AM- 11:00AM
    Kenmore Library11/25/202610:30AM- 11:00AM

    Mitchelton Library11/6/202611:00AM - 11:30 AM
    Mitchelton Library11/13/202611:00AM - 11:30 AM
    Mitchelton Library11/20/202611:00AM - 11:30 AM
    Mitchelton Library11/27/202611:00AM - 11:30 AM

    Mount Gravatt Library11/6/20269:30AM - 10:00 AM
    Mount Gravatt Library11/13/20269:30AM - 10:00 AM
    Mount Gravatt Library11/20/20269:30AM - 10:00 AM
    Mount Gravatt Library11/27/20269:30AM - 10:00 AM

    Mt Ommaney Library11/4/20269:30AM - 10:00 AM
    Mt Ommaney Library11/11/20269:30AM - 10:00 AM
    Mt Ommaney Library11/18/20269:30AM - 10:00 AM
    Mt Ommaney Library11/25/20269:30AM - 10:00 AM

    New Farm Library11/4/202611:00AM - 11:30 AM
    New Farm Library11/11/202611:00AM - 11:30 AM
    New Farm Library11/18/202611:00AM - 11:30 AM
    New Farm Library11/25/202611:00AM - 11:30 AM

    Nundah Library11/5/20269:30AM - 10:00 AM
    Nundah Library11/12/20269:30AM - 10:00 AM
    Nundah Library11/19/20269:30AM - 10:00 AM
    Nundah Library11/26/20269:30AM - 10:00 AM

    Sandgate Library11/6/202610:00AM - 10:30 AM
    Sandgate Library11/13/202610:00AM - 10:30 AM
    Sandgate Library11/20/202610:00AM - 10:30 AM
    Sandgate Library11/27/202610:00AM - 10:30 AM

    Stones Corner Library11/6/20269:30AM - 10:00 AM
    Stones Corner Library11/13/20269:30AM - 10:00 AM
    Stones Corner Library11/20/20269:30AM - 10:00 AM
    Stones Corner Library11/27/20269:30AM - 10:00 AM

    Sunnybank Hills Library11/2/202610:30AM- 11:00AM
    Sunnybank Hills Library11/9/202610:30AM- 11:00AM
    Sunnybank Hills Library11/16/202610:30AM- 11:00AM
    Sunnybank Hills Library11/23/202610:30AM- 11:00AM
    Sunnybank Hills Library11/30/202610:30AM- 11:00AM

    Toowong Library11/3/202611:30AM - 12:00PM
    Toowong Library11/10/202611:30AM - 12:00PM
    Toowong Library11/17/202611:30AM - 12:00PM
    Toowong Library11/24/202611:30AM - 12:00PM

    West End Library11/4/20269:15AM - 9:45 AM
    West End Library11/11/20269:15AM - 9:45 AM
    West End Library11/18/20269:15AM - 9:45 AM
    West End Library11/25/20269:15AM - 9:45 AM

    Wynnum Library11/6/20269:15AM - 9:45 AM
    Wynnum Library11/13/20269:15AM - 9:45 AM
    Wynnum Library11/20/20269:15AM - 9:45 AM
    Wynnum Library11/27/20269:15AM - 9:45 AM

    Zillmere Library11/5/202610:30AM- 11:00AM
    Zillmere Library11/12/202610:30AM- 11:00AM
    Zillmere Library11/19/202610:30AM- 11:00AM
    Zillmere Library11/26/202610:30AM- 11:00AM
  




Published 28-October-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Brisbane Metro Expansion Survey Opens as Residents Asked About Local Transport Problems]]></title>
<link>https://newfarmnews.com.au/brisbane-metro-expansion-survey-opens-as-residents-asked-about-local-transport-problems/brisbane-metro-expansion-survey-opens-as-residents-asked-about-local-transport-problems</link>
<media:content url="https://newfarmnews.com.au/wp-content/uploads/2026/10/Brisbane-Metro-FI.png" medium="image"/>
<media:thumbnail url="https://newfarmnews.com.au/wp-content/uploads/2026/10/Brisbane-Metro-FI.png"/>
<enclosure url="https://newfarmnews.com.au/wp-content/uploads/2026/10/Brisbane-Metro-FI.png" length="1526806" type="image/png"/>
<pubDate>Wed, 28 Oct 2026 00:12:46 +0000</pubDate>
<dc:creator><![CDATA[New Farm News]]></dc:creator>
<guid isPermaLink="true">https://newfarmnews.com.au/brisbane-metro-expansion-survey-opens-as-residents-asked-about-local-transport-problems/</guid>
<description><![CDATA[


Brisbane residents are being invited to share their public transport concerns and suggest improvements as community consultation begins on proposed Metro expansions across the city's northern, eastern, southern and airport corridors.



Submissions close on Sunday, 13 December 2026, giving commuters an opportunity to describe difficulties with existing services and suggest improvements. Their feedback will help inform a business case examining how Brisbane Metro could reach more suburbs.



Four corridors bring different transport questions



The proposed Northern Metro would connect the CBD with Carseldine, extending services through Lutwyche, Kedron, Chermside and Aspley. Gympie Road has been identified as a potential corridor, raising questions about how dedicated bus infrastructure could improve journeys along one of Brisbane's major northern transport routes.



For residents in these suburbs, the consultation provides an opportunity to describe existing problems involving bus connections, journey reliability and access to public transport. Final station locations and the infrastructure needed for a northern extension remain undecided.



The Eastern Metro proposal would connect central Brisbane with Capalaba through the eastern suburbs, with Old Cleveland Road identified as a potential route. Commuters travelling through areas including Coorparoo could provide feedback about existing services, transfers and difficulties encountered during their journeys.



South of the city, the proposed Southern Metro would connect the CBD with Springwood, complementing the South East Busway extension and linking with the existing M1 service at Eight Mile Plains busway station.



The fourth corridor would create express Metro connections between Brisbane Airport's domestic and international terminals and the CBD. Planning will examine how those services could fit into the wider public transport network.



All four corridors remain proposals, with their potential alignments and infrastructure needs to be examined through the business case.



Photo Credit: BCC



Population growth adds pressure to existing routes



Council forecasts substantial population growth along the three residential corridors over the next 20 years.



Its projections indicate increases of 60 per cent along the CBD-to-Carseldine corridor, 29 per cent towards Capalaba and 96 per cent towards Springwood. Approximately 88,000 additional residents are expected in areas surrounding those corridors.



Brisbane's latest expansion proposals also revisit ambitions from the South East Queensland Integrated Regional Transport Plan developed in the 1990s. The earlier plan proposed approximately 75 kilometres of busways, but only about 25 kilometres were ultimately built.



Infrastructure Australia has identified the Metro expansion as an early-stage investment proposal that could improve public transport capacity, interchange connections and service reliability. Potential benefits remain subject to further planning and assessment.



Council wants to hear where journeys fall short



The consultation focuses on residents' current travel experiences and suggestions for improving bus services along the proposed corridors, rather than asking them to comment on completed designs.



Issues such as unreliable travel times, inconvenient transfers, access to stops and gaps in service coverage could be raised by residents. Council has not indicated that participants will be able to vote on final station locations or select specific route alignments.



The consultation follows the introduction of Brisbane Metro's M1 and M2 services in 2025, alongside changes to the city's wider bus network. Council is now investigating how similar high-capacity services could operate beyond the existing network.



LM Adrian Schrinner has encouraged residents to contribute to the expansion plans, arguing that the Metro model should be extended into other parts of Brisbane.



Civic Cabinet Chair for Transport Cr Andrew Wines has also sought feedback from regular passengers and people who would consider using public transport if better services were available.







Construction funding and 2032 timetable remain uncertain



Brisbane City Council is working with the Queensland and Australian governments on the Brisbane Metro Expansions Business Case, with Jacobs Group (Australia) engaged to undertake the work.



The business case will investigate possible route alignments, depot locations, network improvements, infrastructure requirements and the order in which different sections could be delivered.



The Australian Government has committed $50 million to support development of the final business case and related expansion planning. However, construction funding for the proposed corridors has not been secured, and major infrastructure works would require substantial additional investment.



Mr Schrinner has declined to guarantee that any of the proposed extensions will be completed before the Brisbane 2032 Olympic and Paralympic Games.



The distinction between long-term expansion plans and present-day transport needs has also attracted criticism. Opposition Leader Cr Jared Cassidy has called for more suburban bus services now, rather than waiting years for major infrastructure projects.



Council expects the expansion business case to be completed in late 2027. Any subsequent construction would depend on funding availability, relevant approvals and decisions about which sections should proceed.



How residents can have their say



The survey is open until Sunday, 13 December 2026. Council has also provided an option for residents to register for project updates as the business case progresses.




HAVE YOUR SAY










.bson-metro-box {
  box-sizing: border-box;
  max-width: 100%;
  padding: 20px;
  margin: 24px 0;
  border: 1px solid #d5dee8;
  border-left: 4px solid #235b87;
  border-radius: 6px;
  background: #f6f9fc;
  color: #1e293b;
  font-family: inherit;
  line-height: 1.6;
}
.bson-metro-box * { box-sizing: border-box; }
.bson-metro-box h3 {
  margin: 0 0 12px;
  font-size: 1.3rem;
  line-height: 1.35;
  color: #163c5c;
}
.bson-metro-box p { margin: 0 0 12px; }
.bson-metro-box ul {
  margin: 8px 0 16px;
  padding-left: 22px;
}
.bson-metro-box li { margin: 4px 0; }
.bson-metro-box a.bson-metro-link {
  display: inline-block;
  max-width: 100%;
  padding: 10px 15px;
  border-radius: 4px;
  background: #235b87;
  color: #fff;
  font-weight: 700;
  text-decoration: none;
  overflow-wrap: anywhere;
}
.bson-metro-box a.bson-metro-link:hover,
.bson-metro-box a.bson-metro-link:focus {
  background: #163c5c;
  color: #fff;
  text-decoration: underline;
}
.bson-metro-box .bson-metro-note {
  margin: 12px 0 0;
  font-size: .87rem;
  color: #475569;
}
@media (max-width: 480px) {
  .bson-metro-box { padding: 15px; }
  .bson-metro-box h3 { font-size: 1.15rem; }
  .bson-metro-box a.bson-metro-link {
    display: block;
    text-align: center;
  }
}



  Have Your Say on Brisbane Metro

  Survey closes:
  Sunday, 13 December 2026

  Brisbane City Council is seeking feedback
  about current travel experiences and
  potential bus network improvements.

  Proposed expansion corridors:
  
    Northern: CBD to Carseldine
    Eastern: CBD to Capalaba
    Southern: CBD to Springwood
    Airport: CBD to Brisbane Airport
  

  
    
      View Consultation and Survey
    
  

  
    The proposed corridors remain subject to
    the business case, funding and approvals.
    No final routes or construction timetable
    have been confirmed.
  





The&nbsp;online community survey&nbsp;can be accessed directly, while questions about the project can be sent to&nbsp;metroexpansions@brisbane.qld.gov.au.



Feedback gathered during the consultation will contribute to the business case, which is expected to provide more detailed information about potential routes, infrastructure requirements and delivery stages in late 2027.



Published 28-Oct-2026



Featured Image Credit: Wikipedia/Kyethepie21/CC0




]]></description>
<content:encoded><![CDATA[


Brisbane residents are being invited to share their public transport concerns and suggest improvements as community consultation begins on proposed Metro expansions across the city's northern, eastern, southern and airport corridors.



Submissions close on Sunday, 13 December 2026, giving commuters an opportunity to describe difficulties with existing services and suggest improvements. Their feedback will help inform a business case examining how Brisbane Metro could reach more suburbs.



Four corridors bring different transport questions



The proposed Northern Metro would connect the CBD with Carseldine, extending services through Lutwyche, Kedron, Chermside and Aspley. Gympie Road has been identified as a potential corridor, raising questions about how dedicated bus infrastructure could improve journeys along one of Brisbane's major northern transport routes.



For residents in these suburbs, the consultation provides an opportunity to describe existing problems involving bus connections, journey reliability and access to public transport. Final station locations and the infrastructure needed for a northern extension remain undecided.



The Eastern Metro proposal would connect central Brisbane with Capalaba through the eastern suburbs, with Old Cleveland Road identified as a potential route. Commuters travelling through areas including Coorparoo could provide feedback about existing services, transfers and difficulties encountered during their journeys.



South of the city, the proposed Southern Metro would connect the CBD with Springwood, complementing the South East Busway extension and linking with the existing M1 service at Eight Mile Plains busway station.



The fourth corridor would create express Metro connections between Brisbane Airport's domestic and international terminals and the CBD. Planning will examine how those services could fit into the wider public transport network.



All four corridors remain proposals, with their potential alignments and infrastructure needs to be examined through the business case.



Photo Credit: BCC



Population growth adds pressure to existing routes



Council forecasts substantial population growth along the three residential corridors over the next 20 years.



Its projections indicate increases of 60 per cent along the CBD-to-Carseldine corridor, 29 per cent towards Capalaba and 96 per cent towards Springwood. Approximately 88,000 additional residents are expected in areas surrounding those corridors.



Brisbane's latest expansion proposals also revisit ambitions from the South East Queensland Integrated Regional Transport Plan developed in the 1990s. The earlier plan proposed approximately 75 kilometres of busways, but only about 25 kilometres were ultimately built.



Infrastructure Australia has identified the Metro expansion as an early-stage investment proposal that could improve public transport capacity, interchange connections and service reliability. Potential benefits remain subject to further planning and assessment.



Council wants to hear where journeys fall short



The consultation focuses on residents' current travel experiences and suggestions for improving bus services along the proposed corridors, rather than asking them to comment on completed designs.



Issues such as unreliable travel times, inconvenient transfers, access to stops and gaps in service coverage could be raised by residents. Council has not indicated that participants will be able to vote on final station locations or select specific route alignments.



The consultation follows the introduction of Brisbane Metro's M1 and M2 services in 2025, alongside changes to the city's wider bus network. Council is now investigating how similar high-capacity services could operate beyond the existing network.



LM Adrian Schrinner has encouraged residents to contribute to the expansion plans, arguing that the Metro model should be extended into other parts of Brisbane.



Civic Cabinet Chair for Transport Cr Andrew Wines has also sought feedback from regular passengers and people who would consider using public transport if better services were available.







Construction funding and 2032 timetable remain uncertain



Brisbane City Council is working with the Queensland and Australian governments on the Brisbane Metro Expansions Business Case, with Jacobs Group (Australia) engaged to undertake the work.



The business case will investigate possible route alignments, depot locations, network improvements, infrastructure requirements and the order in which different sections could be delivered.



The Australian Government has committed $50 million to support development of the final business case and related expansion planning. However, construction funding for the proposed corridors has not been secured, and major infrastructure works would require substantial additional investment.



Mr Schrinner has declined to guarantee that any of the proposed extensions will be completed before the Brisbane 2032 Olympic and Paralympic Games.



The distinction between long-term expansion plans and present-day transport needs has also attracted criticism. Opposition Leader Cr Jared Cassidy has called for more suburban bus services now, rather than waiting years for major infrastructure projects.



Council expects the expansion business case to be completed in late 2027. Any subsequent construction would depend on funding availability, relevant approvals and decisions about which sections should proceed.



How residents can have their say



The survey is open until Sunday, 13 December 2026. Council has also provided an option for residents to register for project updates as the business case progresses.




HAVE YOUR SAY










.bson-metro-box {
  box-sizing: border-box;
  max-width: 100%;
  padding: 20px;
  margin: 24px 0;
  border: 1px solid #d5dee8;
  border-left: 4px solid #235b87;
  border-radius: 6px;
  background: #f6f9fc;
  color: #1e293b;
  font-family: inherit;
  line-height: 1.6;
}
.bson-metro-box * { box-sizing: border-box; }
.bson-metro-box h3 {
  margin: 0 0 12px;
  font-size: 1.3rem;
  line-height: 1.35;
  color: #163c5c;
}
.bson-metro-box p { margin: 0 0 12px; }
.bson-metro-box ul {
  margin: 8px 0 16px;
  padding-left: 22px;
}
.bson-metro-box li { margin: 4px 0; }
.bson-metro-box a.bson-metro-link {
  display: inline-block;
  max-width: 100%;
  padding: 10px 15px;
  border-radius: 4px;
  background: #235b87;
  color: #fff;
  font-weight: 700;
  text-decoration: none;
  overflow-wrap: anywhere;
}
.bson-metro-box a.bson-metro-link:hover,
.bson-metro-box a.bson-metro-link:focus {
  background: #163c5c;
  color: #fff;
  text-decoration: underline;
}
.bson-metro-box .bson-metro-note {
  margin: 12px 0 0;
  font-size: .87rem;
  color: #475569;
}
@media (max-width: 480px) {
  .bson-metro-box { padding: 15px; }
  .bson-metro-box h3 { font-size: 1.15rem; }
  .bson-metro-box a.bson-metro-link {
    display: block;
    text-align: center;
  }
}



  Have Your Say on Brisbane Metro

  Survey closes:
  Sunday, 13 December 2026

  Brisbane City Council is seeking feedback
  about current travel experiences and
  potential bus network improvements.

  Proposed expansion corridors:
  
    Northern: CBD to Carseldine
    Eastern: CBD to Capalaba
    Southern: CBD to Springwood
    Airport: CBD to Brisbane Airport
  

  
    
      View Consultation and Survey
    
  

  
    The proposed corridors remain subject to
    the business case, funding and approvals.
    No final routes or construction timetable
    have been confirmed.
  





The&nbsp;online community survey&nbsp;can be accessed directly, while questions about the project can be sent to&nbsp;metroexpansions@brisbane.qld.gov.au.



Feedback gathered during the consultation will contribute to the business case, which is expected to provide more detailed information about potential routes, infrastructure requirements and delivery stages in late 2027.



Published 28-Oct-2026



Featured Image Credit: Wikipedia/Kyethepie21/CC0




]]></content:encoded>
</item><item>
<title><![CDATA[Queensland’s Smoke Alarm Deadline Is Near — Is Your Family Really Protected?]]></title>
<link>https://newfarmnews.com.au/queensland-smoke-alarm-deadline-2027-home-safety/queensland-smoke-alarm-deadline-2027-home-safety</link>
<media:content url="https://newfarmnews.com.au/wp-content/uploads/2026/11/Brooks-Kenmore-1.jpeg" medium="image"/>
<media:thumbnail url="https://newfarmnews.com.au/wp-content/uploads/2026/11/Brooks-Kenmore-1.jpeg"/>
<enclosure url="https://newfarmnews.com.au/wp-content/uploads/2026/11/Brooks-Kenmore-1.jpeg" length="298570" type="image/jpeg"/>
<pubDate>Wed, 11 Nov 2026 10:18:41 +0000</pubDate>
<dc:creator><![CDATA[New Farm News]]></dc:creator>
<guid isPermaLink="true">https://newfarmnews.com.au/queensland-smoke-alarm-deadline-2027-home-safety/</guid>
<description><![CDATA[




By Cathy Brand | Fire Safety Advocate and CEO of Brooks Australia



A Queensland homeowner could have several working smoke alarms throughout their property and still fall short of the state's requirements when the final stage of its smoke alarm reforms takes effect on 1 January 2027.



The changes go well beyond replacing ageing devices. They affect where alarms must be installed, how they communicate with one another and the type of technology permitted. For households that have relied on the same arrangement for years, becoming compliant may involve a more substantial upgrade than expected.



With just over two months remaining, the approaching deadline also presents an opportunity to consider whether the warning system provides everyone in the home with the best possible chance of escaping a fire.



A decade of reform reaches its final deadline



Queensland's smoke alarm reforms have been introduced progressively over the past decade, beginning with new homes and substantial renovations in 2017. Properties being sold or leased were required to meet the upgraded standards from January 2022, while the final stage, commencing on 1 January 2027, applies to the remaining domestic dwellings.




  
    .cb-history-box,
    .cb-history-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-history-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px 26px;
      background: #f5f6f7;
      border: 1px solid #d9dee2;
      border-left: 5px solid #40566a;
      border-radius: 7px;
      color: #26323b;
      font: 16px/1.65 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-history-box h3 {
      margin: 0 0 17px;
      color: #203b50;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
      hyphens: none;
    }

    .cb-history-box p {
      margin: 0 0 14px;
      line-height: 1.65;
      hyphens: none;
    }

    .cb-history-box p:last-child {
      margin-bottom: 0;
    }

    .cb-history-box strong {
      color: #203b50;
    }

    .cb-history-box a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-history-box a:hover,
    .cb-history-box a:focus {
      color: #40566a;
    }

    @media (max-width: 600px) {
      .cb-history-box {
        padding: 19px 16px;
        margin: 22px 0;
        font-size: 15px;
      }

      .cb-history-box h3 {
        font-size: 19px;
      }
    }
  

  The Slacks Creek Tragedy That Changed Queensland's Smoke Alarm Laws

  
    On 24 August 2011, a house fire at Slacks Creek,
    south of Brisbane, claimed 11 lives, including
    eight children. The disaster became
    a defining tragedy in Queensland's
    approach to residential fire safety,
    ultimately helping drive some of the country's
    most significant smoke alarm reforms.
  

  
    The coronial inquest, whose findings were
    delivered on 28 November 2014, examined
    the failure of the home's smoke alarms.
    The coroner concluded there was a reasonable
    prospect that some or all of those who died
    could have escaped had the alarms been working.
  

  
    The coroner's recommendations helped shape
    sweeping changes to Queensland's smoke alarm
    laws. Legislation passed in 2016 introduced
    a ten-year transition towards photoelectric,
    interconnected alarms installed in bedrooms,
    connecting hallways and on every storey.
  

  
    The reforms began taking effect in January 2017,
    with the final stage due on 1 January 2027.
  

  
    The changes reflect a fundamental lesson from
    the tragedy: providing an earlier warning
    throughout a home can give occupants more
    time to escape.
  




The legislation requires photoelectric smoke alarms complying with Australian Standard AS 3786:2014, without an ionisation sensor. They must be less than ten years old, operate when tested and be interconnected so that when one alarm activates, all connected alarms sound.



Placement is equally important. Alarms are required in every bedroom, in hallways connecting bedrooms to the rest of the dwelling and on each storey, with additional provisions for levels without bedrooms. A home with functioning alarms in its hallways, for example, may still need additional units inside bedrooms to satisfy the requirements.



One common misconception is that compliance necessarily involves extensive rewiring. Queensland permits compliant alarms powered by non-removable ten-year batteries in existing dwellings where appropriate, and wireless interconnection can provide an alternative to running interconnect cables throughout a property.



However, an existing hardwired smoke alarm must be replaced with another hardwired unit, with the electrical work undertaken by a licensed electrician. New homes and substantial renovations have separate hardwiring requirements. Depending on the home's existing installation, a combination of hardwired and compatible wireless interconnected alarms may also be suitable.





  
    .cb-compliance-box,
    .cb-compliance-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-compliance-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px;
      background: #fff7f8;
      border: 1px solid #e8cbd1;
      border-left: 5px solid #CF0A2C;
      border-radius: 7px;
      color: #2E2A25;
      font: 16px/1.55 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-box h3 {
      margin: 0 0 12px;
      color: #CF0A2C;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-box .cb-intro {
      margin: 0 0 19px;
      line-height: 1.6;
    }

    .cb-compliance-grid {
      display: grid;
      grid-template-columns: repeat(2, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-compliance-item {
      min-width: 0;
      padding: 14px 15px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-item strong {
      display: block;
      margin-bottom: 5px;
      color: #CF0A2C;
      font-size: 15px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-item p {
      margin: 0;
      color: #2E2A25;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-install-section {
      margin-top: 24px;
      padding-top: 19px;
      border-top: 2px solid #e8cbd1;
    }

    .cb-install-section h4 {
      margin: 0 0 8px;
      color: #CF0A2C;
      font-size: 19px;
      line-height: 1.35;
      font-weight: 700;
    }

    .cb-install-intro {
      margin: 0 0 15px;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-install-grid {
      display: grid;
      grid-template-columns: repeat(3, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-install-item {
      min-width: 0;
      padding: 14px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
    }

    .cb-install-item strong {
      display: block;
      margin-bottom: 7px;
      color: #CF0A2C;
      font-size: 15px;
      line-height: 1.4;
    }

    .cb-install-item p {
      margin: 0;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-compliance-note {
      margin: 20px 0 0;
      padding-top: 14px;
      border-top: 1px solid #e8cbd1;
      color: #403a37;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-compliance-note strong {
      color: #CF0A2C;
    }

    @media (max-width: 650px) {
      .cb-compliance-box {
        padding: 18px 15px;
        margin: 22px 0;
      }

      .cb-compliance-box h3 {
        font-size: 19px;
      }

      .cb-compliance-grid,
      .cb-install-grid {
        grid-template-columns: minmax(0, 1fr);
        gap: 9px;
      }

      .cb-compliance-item,
      .cb-install-item {
        padding: 12px 13px;
      }

      .cb-install-section h4 {
        font-size: 18px;
      }

      .cb-compliance-note {
        font-size: 13px;
      }
    }
  

  
    Queensland's 2027 Smoke Alarm Rules:
    A Homeowner's Checklist
  

  
    By 1 January 2027, all remaining private homes,
    townhouses and units in Queensland must comply
    with the state's upgraded smoke alarm requirements.
  

  

    
      Alarm type
      
        Required alarms must be photoelectric,
        comply with AS 3786:2014 and contain
        no ionisation sensor.
      
    

    
      Age
      
        Alarms must be less than ten years old
        from their manufacture date.
      
    

    
      Interconnection
      
        All required alarms must be interconnected
        so that when one activates, they all sound.
      
    

    
      Bedrooms
      
        An alarm must be installed in every bedroom.
      
    

    
      Hallways
      
        Alarms must be installed in hallways connecting
        bedrooms to the rest of the dwelling. Where
        there is no hallway, an alarm must be installed
        between the bedrooms and other parts
        of the storey.
      
    

    
      Every storey
      
        Each level requires appropriate coverage.
        On storeys without bedrooms, an alarm must
        be installed in the most likely path of
        travel to an exit.
      
    

    
      Power source
      
        Alarms must be hardwired or use a
        non-removable ten-year battery, as permitted
        for the property. New homes and substantial
        renovations require hardwired alarms.
      
    

    
      Hardwired replacements
      
        Existing 240V hardwired smoke alarms must
        be replaced with compliant hardwired
        photoelectric alarms, not battery-only models.
        A licensed electrician must carry out
        the electrical replacement.
      
    

    
      Operation
      
        All alarms must work when tested.
      
    

  

  

    Who Can Install Your Smoke Alarms?

    
      Queensland law does not require every smoke
      alarm to be installed by an electrician.
      The requirements depend on the alarm's
      power source and whether electrical work
      is involved.
    

    

      
        1. New hardwired alarms
        
          A licensed electrician is required
          to install 240V hardwired smoke alarms.
          This includes electrical wiring and
          connections to mains power.
        
      

      
        2. Battery-powered alarms
        
          Homeowners can generally install compliant
          photoelectric alarms powered by non-removable
          ten-year batteries themselves, provided
          no electrical work is required. All alarms
          must be correctly positioned and interconnected
          in accordance with Queensland's prescribed
          placement distances and installation requirements.
        
      

      
        3. Replacing hardwired alarms
        
          Existing 240V hardwired smoke alarms
          must be replaced with compliant
          hardwired photoelectric alarms,
          not battery-only models.
          A licensed electrician must carry
          out the electrical replacement.
        
      

    

  

  
    Important:
    Smoke alarm placement and power-source requirements
    depend on the dwelling's layout and existing
    installation. Consult the
    
      Queensland Fire Department's official guidance
    
    or a suitably qualified installer if uncertain.
  






A fire doesn't wait for smoke to reach your bedroom



A fire may begin in a part of the house far removed from where occupants are sleeping. In a conventional arrangement of independent alarms, someone at the opposite end of the property may not receive a warning until smoke reaches an alarm closer to their bedroom.



Interconnected alarms address that delay by activating throughout the home when any one of the connected devices detects smoke.



The practical importance becomes particularly clear in larger houses, multi-storey properties and homes where bedroom doors are kept closed overnight. A fire starting in one sleeping area can trigger alarms elsewhere, alerting other occupants who may be able to assist.



In my own home, our bedroom is at one end of the house and our children's bedrooms are at the other. They sleep with their doors closed, as many children do. If a fire were to start in one of their rooms, I would want to know immediately, rather than wait for smoke to reach an alarm closer to where we sleep.



That is why interconnection matters. We want the warning travelling through the house faster than the smoke, giving everyone the earliest possible opportunity to respond.



The last-minute rush Queenslanders could do without



Despite years of public information campaigns, awareness of the legislation has not necessarily translated into completed installations.



The Queensland Fire Department's 2025 Community Insights Survey found that 72 per cent of respondents were aware of the interconnected smoke alarm legislation, but only 54 per cent knew about the 1 January 2027 deadline. At the time of the survey, 52 per cent reported having interconnected alarms installed.



These figures reflect what respondents reported rather than independently verified compliance, but they indicate that a substantial number of Queensland households may still need to review their arrangements.



A concentrated rush in the final weeks could also place pressure on product availability and electrician appointments. While shortages are not inevitable, households that act earlier have more time to understand their options, obtain advice and arrange any necessary installation work.



An initial assessment need not be complicated. Homeowners can begin by checking the location and manufacture date of their existing alarms, confirming whether they are photoelectric and interconnected, and testing that they operate correctly. They should also establish whether every required sleeping area and storey has appropriate coverage.



For households with existing hardwired systems, advice from a licensed electrician can help determine what needs replacing and how additional alarms can be incorporated.



A compliant home isn't necessarily a safer home for everyone



Queensland's legislation establishes a minimum standard for residential smoke alarm protection, but the circumstances of the people living in each home can be just as important as the building itself.



An audible warning, for example, may not be sufficient for someone who is deaf or hard of hearing, while a person with limited mobility may require additional time or assistance to evacuate. These considerations do not change the legal requirements, but they can influence whether a household needs supplementary warning equipment or other safety arrangements.



Families should also develop and practise an escape plan that accounts for the needs of everyone living in the home, including children, older residents and people who may require assistance. Installing compliant alarms is important, but knowing how to respond when they sound is another essential part of household fire safety.



Homeowners who have yet to complete their upgrades should begin by reviewing their existing alarms, checking the requirements for their property and arranging professional advice where needed. Leaving the work until the final weeks of December may unnecessarily limit their options.



Queensland's smoke alarm reforms were introduced to improve the warning people receive when fire breaks out at home. Meeting the requirements before 1 January 2027 is an important step, but the greater responsibility is ensuring that everyone in the household knows what to do when those alarms sound.




  
    .cb-author-box,
    .cb-author-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-author-box {
      width: 100%;
      max-width: 100%;
      margin: 30px 0;
      padding: 23px;
      background: #f7f8f9;
      border: 1px solid #dce1e5;
      border-radius: 7px;
      color: #283740;
      font: 15px/1.6 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      hyphens: none;
    }

    .cb-author-main {
      display: grid;
      grid-template-columns: 145px minmax(0, 1fr);
      gap: 22px;
      align-items: start;
    }

    .cb-author-photo {
      width: 145px;
      max-width: 100%;
      height: auto;
      display: block;
      border-radius: 5px;
      object-fit: contain;
    }

    .cb-author-copy h3 {
      margin: 0 0 10px;
      color: #203b50;
      font-size: 21px;
      line-height: 1.3;
      font-weight: 700;
    }

    .cb-author-copy p {
      margin: 0;
      line-height: 1.65;
    }

    .cb-author-copy a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-author-copy a:hover,
    .cb-author-copy a:focus {
      color: #40566a;
    }

    .cb-author-box .cb-series-note {
      margin: 19px 0 0;
      padding: 13px 0 0;
      border-top: 1px solid #dce1e5;
      color: #586670;
      font-size: 13px;
      line-height: 1.6;
      font-style: italic;
    }

    @media (max-width: 600px) {
      .cb-author-box {
        padding: 19px 16px;
        margin: 24px 0;
      }

      .cb-author-main {
        grid-template-columns: minmax(0, 1fr);
        gap: 15px;
      }

      .cb-author-photo {
        width: 150px;
        max-width: 65%;
        height: auto;
        margin: 0 auto;
      }

      .cb-author-copy h3 {
        font-size: 20px;
      }
    }
  

  

    
      
    

    
      About Cathy Brand

      
        Cathy Brand is the Chief
        Executive Officer of
        Brooks Australia,
        a provider of fire detection and warning
        technology. Through her work in the fire
        safety industry, she advocates for greater
        awareness of residential fire protection,
        interconnected smoke alarm systems and
        solutions that consider the needs of
        different households.
      
    

  

  
    Home Fire Safety with Cathy Brand is a five-part
    sponsored editorial series presented in
    partnership with Brooks Australia.
  




Published 27-October-2026




]]></description>
<content:encoded><![CDATA[




By Cathy Brand | Fire Safety Advocate and CEO of Brooks Australia



A Queensland homeowner could have several working smoke alarms throughout their property and still fall short of the state's requirements when the final stage of its smoke alarm reforms takes effect on 1 January 2027.



The changes go well beyond replacing ageing devices. They affect where alarms must be installed, how they communicate with one another and the type of technology permitted. For households that have relied on the same arrangement for years, becoming compliant may involve a more substantial upgrade than expected.



With just over two months remaining, the approaching deadline also presents an opportunity to consider whether the warning system provides everyone in the home with the best possible chance of escaping a fire.



A decade of reform reaches its final deadline



Queensland's smoke alarm reforms have been introduced progressively over the past decade, beginning with new homes and substantial renovations in 2017. Properties being sold or leased were required to meet the upgraded standards from January 2022, while the final stage, commencing on 1 January 2027, applies to the remaining domestic dwellings.




  
    .cb-history-box,
    .cb-history-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-history-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px 26px;
      background: #f5f6f7;
      border: 1px solid #d9dee2;
      border-left: 5px solid #40566a;
      border-radius: 7px;
      color: #26323b;
      font: 16px/1.65 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-history-box h3 {
      margin: 0 0 17px;
      color: #203b50;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
      hyphens: none;
    }

    .cb-history-box p {
      margin: 0 0 14px;
      line-height: 1.65;
      hyphens: none;
    }

    .cb-history-box p:last-child {
      margin-bottom: 0;
    }

    .cb-history-box strong {
      color: #203b50;
    }

    .cb-history-box a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-history-box a:hover,
    .cb-history-box a:focus {
      color: #40566a;
    }

    @media (max-width: 600px) {
      .cb-history-box {
        padding: 19px 16px;
        margin: 22px 0;
        font-size: 15px;
      }

      .cb-history-box h3 {
        font-size: 19px;
      }
    }
  

  The Slacks Creek Tragedy That Changed Queensland's Smoke Alarm Laws

  
    On 24 August 2011, a house fire at Slacks Creek,
    south of Brisbane, claimed 11 lives, including
    eight children. The disaster became
    a defining tragedy in Queensland's
    approach to residential fire safety,
    ultimately helping drive some of the country's
    most significant smoke alarm reforms.
  

  
    The coronial inquest, whose findings were
    delivered on 28 November 2014, examined
    the failure of the home's smoke alarms.
    The coroner concluded there was a reasonable
    prospect that some or all of those who died
    could have escaped had the alarms been working.
  

  
    The coroner's recommendations helped shape
    sweeping changes to Queensland's smoke alarm
    laws. Legislation passed in 2016 introduced
    a ten-year transition towards photoelectric,
    interconnected alarms installed in bedrooms,
    connecting hallways and on every storey.
  

  
    The reforms began taking effect in January 2017,
    with the final stage due on 1 January 2027.
  

  
    The changes reflect a fundamental lesson from
    the tragedy: providing an earlier warning
    throughout a home can give occupants more
    time to escape.
  




The legislation requires photoelectric smoke alarms complying with Australian Standard AS 3786:2014, without an ionisation sensor. They must be less than ten years old, operate when tested and be interconnected so that when one alarm activates, all connected alarms sound.



Placement is equally important. Alarms are required in every bedroom, in hallways connecting bedrooms to the rest of the dwelling and on each storey, with additional provisions for levels without bedrooms. A home with functioning alarms in its hallways, for example, may still need additional units inside bedrooms to satisfy the requirements.



One common misconception is that compliance necessarily involves extensive rewiring. Queensland permits compliant alarms powered by non-removable ten-year batteries in existing dwellings where appropriate, and wireless interconnection can provide an alternative to running interconnect cables throughout a property.



However, an existing hardwired smoke alarm must be replaced with another hardwired unit, with the electrical work undertaken by a licensed electrician. New homes and substantial renovations have separate hardwiring requirements. Depending on the home's existing installation, a combination of hardwired and compatible wireless interconnected alarms may also be suitable.





  
    .cb-compliance-box,
    .cb-compliance-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-compliance-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px;
      background: #fff7f8;
      border: 1px solid #e8cbd1;
      border-left: 5px solid #CF0A2C;
      border-radius: 7px;
      color: #2E2A25;
      font: 16px/1.55 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-box h3 {
      margin: 0 0 12px;
      color: #CF0A2C;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-box .cb-intro {
      margin: 0 0 19px;
      line-height: 1.6;
    }

    .cb-compliance-grid {
      display: grid;
      grid-template-columns: repeat(2, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-compliance-item {
      min-width: 0;
      padding: 14px 15px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-item strong {
      display: block;
      margin-bottom: 5px;
      color: #CF0A2C;
      font-size: 15px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-item p {
      margin: 0;
      color: #2E2A25;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-install-section {
      margin-top: 24px;
      padding-top: 19px;
      border-top: 2px solid #e8cbd1;
    }

    .cb-install-section h4 {
      margin: 0 0 8px;
      color: #CF0A2C;
      font-size: 19px;
      line-height: 1.35;
      font-weight: 700;
    }

    .cb-install-intro {
      margin: 0 0 15px;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-install-grid {
      display: grid;
      grid-template-columns: repeat(3, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-install-item {
      min-width: 0;
      padding: 14px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
    }

    .cb-install-item strong {
      display: block;
      margin-bottom: 7px;
      color: #CF0A2C;
      font-size: 15px;
      line-height: 1.4;
    }

    .cb-install-item p {
      margin: 0;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-compliance-note {
      margin: 20px 0 0;
      padding-top: 14px;
      border-top: 1px solid #e8cbd1;
      color: #403a37;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-compliance-note strong {
      color: #CF0A2C;
    }

    @media (max-width: 650px) {
      .cb-compliance-box {
        padding: 18px 15px;
        margin: 22px 0;
      }

      .cb-compliance-box h3 {
        font-size: 19px;
      }

      .cb-compliance-grid,
      .cb-install-grid {
        grid-template-columns: minmax(0, 1fr);
        gap: 9px;
      }

      .cb-compliance-item,
      .cb-install-item {
        padding: 12px 13px;
      }

      .cb-install-section h4 {
        font-size: 18px;
      }

      .cb-compliance-note {
        font-size: 13px;
      }
    }
  

  
    Queensland's 2027 Smoke Alarm Rules:
    A Homeowner's Checklist
  

  
    By 1 January 2027, all remaining private homes,
    townhouses and units in Queensland must comply
    with the state's upgraded smoke alarm requirements.
  

  

    
      Alarm type
      
        Required alarms must be photoelectric,
        comply with AS 3786:2014 and contain
        no ionisation sensor.
      
    

    
      Age
      
        Alarms must be less than ten years old
        from their manufacture date.
      
    

    
      Interconnection
      
        All required alarms must be interconnected
        so that when one activates, they all sound.
      
    

    
      Bedrooms
      
        An alarm must be installed in every bedroom.
      
    

    
      Hallways
      
        Alarms must be installed in hallways connecting
        bedrooms to the rest of the dwelling. Where
        there is no hallway, an alarm must be installed
        between the bedrooms and other parts
        of the storey.
      
    

    
      Every storey
      
        Each level requires appropriate coverage.
        On storeys without bedrooms, an alarm must
        be installed in the most likely path of
        travel to an exit.
      
    

    
      Power source
      
        Alarms must be hardwired or use a
        non-removable ten-year battery, as permitted
        for the property. New homes and substantial
        renovations require hardwired alarms.
      
    

    
      Hardwired replacements
      
        Existing 240V hardwired smoke alarms must
        be replaced with compliant hardwired
        photoelectric alarms, not battery-only models.
        A licensed electrician must carry out
        the electrical replacement.
      
    

    
      Operation
      
        All alarms must work when tested.
      
    

  

  

    Who Can Install Your Smoke Alarms?

    
      Queensland law does not require every smoke
      alarm to be installed by an electrician.
      The requirements depend on the alarm's
      power source and whether electrical work
      is involved.
    

    

      
        1. New hardwired alarms
        
          A licensed electrician is required
          to install 240V hardwired smoke alarms.
          This includes electrical wiring and
          connections to mains power.
        
      

      
        2. Battery-powered alarms
        
          Homeowners can generally install compliant
          photoelectric alarms powered by non-removable
          ten-year batteries themselves, provided
          no electrical work is required. All alarms
          must be correctly positioned and interconnected
          in accordance with Queensland's prescribed
          placement distances and installation requirements.
        
      

      
        3. Replacing hardwired alarms
        
          Existing 240V hardwired smoke alarms
          must be replaced with compliant
          hardwired photoelectric alarms,
          not battery-only models.
          A licensed electrician must carry
          out the electrical replacement.
        
      

    

  

  
    Important:
    Smoke alarm placement and power-source requirements
    depend on the dwelling's layout and existing
    installation. Consult the
    
      Queensland Fire Department's official guidance
    
    or a suitably qualified installer if uncertain.
  






A fire doesn't wait for smoke to reach your bedroom



A fire may begin in a part of the house far removed from where occupants are sleeping. In a conventional arrangement of independent alarms, someone at the opposite end of the property may not receive a warning until smoke reaches an alarm closer to their bedroom.



Interconnected alarms address that delay by activating throughout the home when any one of the connected devices detects smoke.



The practical importance becomes particularly clear in larger houses, multi-storey properties and homes where bedroom doors are kept closed overnight. A fire starting in one sleeping area can trigger alarms elsewhere, alerting other occupants who may be able to assist.



In my own home, our bedroom is at one end of the house and our children's bedrooms are at the other. They sleep with their doors closed, as many children do. If a fire were to start in one of their rooms, I would want to know immediately, rather than wait for smoke to reach an alarm closer to where we sleep.



That is why interconnection matters. We want the warning travelling through the house faster than the smoke, giving everyone the earliest possible opportunity to respond.



The last-minute rush Queenslanders could do without



Despite years of public information campaigns, awareness of the legislation has not necessarily translated into completed installations.



The Queensland Fire Department's 2025 Community Insights Survey found that 72 per cent of respondents were aware of the interconnected smoke alarm legislation, but only 54 per cent knew about the 1 January 2027 deadline. At the time of the survey, 52 per cent reported having interconnected alarms installed.



These figures reflect what respondents reported rather than independently verified compliance, but they indicate that a substantial number of Queensland households may still need to review their arrangements.



A concentrated rush in the final weeks could also place pressure on product availability and electrician appointments. While shortages are not inevitable, households that act earlier have more time to understand their options, obtain advice and arrange any necessary installation work.



An initial assessment need not be complicated. Homeowners can begin by checking the location and manufacture date of their existing alarms, confirming whether they are photoelectric and interconnected, and testing that they operate correctly. They should also establish whether every required sleeping area and storey has appropriate coverage.



For households with existing hardwired systems, advice from a licensed electrician can help determine what needs replacing and how additional alarms can be incorporated.



A compliant home isn't necessarily a safer home for everyone



Queensland's legislation establishes a minimum standard for residential smoke alarm protection, but the circumstances of the people living in each home can be just as important as the building itself.



An audible warning, for example, may not be sufficient for someone who is deaf or hard of hearing, while a person with limited mobility may require additional time or assistance to evacuate. These considerations do not change the legal requirements, but they can influence whether a household needs supplementary warning equipment or other safety arrangements.



Families should also develop and practise an escape plan that accounts for the needs of everyone living in the home, including children, older residents and people who may require assistance. Installing compliant alarms is important, but knowing how to respond when they sound is another essential part of household fire safety.



Homeowners who have yet to complete their upgrades should begin by reviewing their existing alarms, checking the requirements for their property and arranging professional advice where needed. Leaving the work until the final weeks of December may unnecessarily limit their options.



Queensland's smoke alarm reforms were introduced to improve the warning people receive when fire breaks out at home. Meeting the requirements before 1 January 2027 is an important step, but the greater responsibility is ensuring that everyone in the household knows what to do when those alarms sound.




  
    .cb-author-box,
    .cb-author-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-author-box {
      width: 100%;
      max-width: 100%;
      margin: 30px 0;
      padding: 23px;
      background: #f7f8f9;
      border: 1px solid #dce1e5;
      border-radius: 7px;
      color: #283740;
      font: 15px/1.6 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      hyphens: none;
    }

    .cb-author-main {
      display: grid;
      grid-template-columns: 145px minmax(0, 1fr);
      gap: 22px;
      align-items: start;
    }

    .cb-author-photo {
      width: 145px;
      max-width: 100%;
      height: auto;
      display: block;
      border-radius: 5px;
      object-fit: contain;
    }

    .cb-author-copy h3 {
      margin: 0 0 10px;
      color: #203b50;
      font-size: 21px;
      line-height: 1.3;
      font-weight: 700;
    }

    .cb-author-copy p {
      margin: 0;
      line-height: 1.65;
    }

    .cb-author-copy a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-author-copy a:hover,
    .cb-author-copy a:focus {
      color: #40566a;
    }

    .cb-author-box .cb-series-note {
      margin: 19px 0 0;
      padding: 13px 0 0;
      border-top: 1px solid #dce1e5;
      color: #586670;
      font-size: 13px;
      line-height: 1.6;
      font-style: italic;
    }

    @media (max-width: 600px) {
      .cb-author-box {
        padding: 19px 16px;
        margin: 24px 0;
      }

      .cb-author-main {
        grid-template-columns: minmax(0, 1fr);
        gap: 15px;
      }

      .cb-author-photo {
        width: 150px;
        max-width: 65%;
        height: auto;
        margin: 0 auto;
      }

      .cb-author-copy h3 {
        font-size: 20px;
      }
    }
  

  

    
      
    

    
      About Cathy Brand

      
        Cathy Brand is the Chief
        Executive Officer of
        Brooks Australia,
        a provider of fire detection and warning
        technology. Through her work in the fire
        safety industry, she advocates for greater
        awareness of residential fire protection,
        interconnected smoke alarm systems and
        solutions that consider the needs of
        different households.
      
    

  

  
    Home Fire Safety with Cathy Brand is a five-part
    sponsored editorial series presented in
    partnership with Brooks Australia.
  




Published 27-October-2026




]]></content:encoded>
</item><item>
<title><![CDATA[Brisbane Dawn Economy Consultation Opens as City Plans for Early Risers]]></title>
<link>https://newfarmnews.com.au/brisbane-dawn-economy-plan-2026/brisbane-dawn-economy-plan-2026</link>
<media:content url="https://newfarmnews.com.au/wp-content/uploads/2026/10/Brisbane-Dawn-Economy-FI.png" medium="image"/>
<media:thumbnail url="https://newfarmnews.com.au/wp-content/uploads/2026/10/Brisbane-Dawn-Economy-FI.png"/>
<enclosure url="https://newfarmnews.com.au/wp-content/uploads/2026/10/Brisbane-Dawn-Economy-FI.png" length="1624527" type="image/png"/>
<pubDate>Wed, 28 Oct 2026 01:47:47 +0000</pubDate>
<dc:creator><![CDATA[New Farm News]]></dc:creator>
<guid isPermaLink="true">https://newfarmnews.com.au/brisbane-dawn-economy-plan-2026/</guid>
<description><![CDATA[


Brisbane's early-morning routines could receive greater attention under a new citywide plan examining improvements to public facilities, walking and cycling routes, transport connections and opportunities for businesses trading before sunrise.



Brisbane City Council opened&nbsp;public consultation&nbsp;on 20 October 2026, inviting residents to share how they use the city between 4:00 a.m. and 7:00 a.m. The five-minute survey closes at 11:59 p.m. on Sunday, 22 November 2026, with responses intended to guide future planning and investment.




HAVE YOUR SAY




Better lighting, paths and public facilities under consideration



The proposed&nbsp;Dawn Economy Plan&nbsp;considers improved lighting along walking and running routes, more drinking fountains and public toilets, additional shade and seating in parks, and better connections between pedestrian and cycling paths.



Residents are being asked where they go, what activities they undertake and which improvements would make Brisbane easier to navigate in the early hours. Public transport connections and opportunities for early-trading businesses are also part of the consultation.



No suburb-specific upgrades have been approved through the plan. Council will use community feedback to help establish priorities, while businesses and precinct representatives will be consulted about opportunities to support morning activity.



Brisbane's early trading leads other capitals



Research by Ingenium&nbsp;found that one in eight Brisbane food and drink venues was trading at 5:00 a.m., compared with one in 25 in Sydney and one in 33 in Melbourne and Perth.



Further analysis by researcher Dr Anna Edwards found that approximately one-third of Brisbane's food and drink businesses were operating between 6:00 a.m. and 7:00 a.m., with around half open by 8:00 a.m.



Dr Edwards identified Brisbane's established early-trading patterns as an economic advantage, supported by the city's outdoor lifestyle and demand for morning hospitality and recreation.



Council has also highlighted Brisbane's 19 Saturday parkruns, which attract thousands of runners, walkers and volunteers, as evidence of the city's established appetite for early outdoor activity.



Lord Mayor Adrian Schrinner said the consultation would help identify practical improvements for residents who already use Brisbane's parks, pathways, pools and hospitality venues before the conventional working day begins.



Five precinct connections proposed across Brisbane



The&nbsp;Committee for Brisbane's Dawn Economy Position Paper, released on 18 October, examines economic activity between 5:00 a.m. and 9:00 a.m. and proposes stronger connections between major recreation, cultural, education and business precincts.



Its recommendations identify five potential corridors spanning the Brisbane River, education and research centres, recreation areas, cultural destinations and sporting facilities.



The proposed connections include South Bank and Kangaroo Point along the river, Mt Coot-tha and Victoria Park through the recreation corridor, and Fortitude Valley, New Farm and West End through the cultural corridor. No construction commitments have been announced for these recommendations.





  Five Proposed Dawn Economy Connections Across Brisbane

  
    The Committee for Brisbane has identified five potential
    connections between major activity precincts.
  

  
    River corridor
    Howard Smith Wharves, CBD, Botanic Gardens,
    South Bank and Kangaroo Point.
  

  
    Knowledge corridor
    Herston, Kelvin Grove, Roma Street, CBD,
    Gardens Point and Boggo Road.
  

  
    Recreation corridor
    Mt Coot-tha, Victoria Park, Spring Hill,
    CBD and Kangaroo Point.
  

  
    Cultural corridor
    Fortitude Valley, New Farm, Howard Smith Wharves,
    Queensland Cultural Centre and West End.
  

  
    Sports corridor
    Ballymore, Victoria Park, RNA Showgrounds,
    Woolloongabba and Queensland Tennis Centre.
  

  
    Planning status:
    These connections are recommendations, not approved
    or funded construction projects.
  

  
    Source:
    
      Committee for Brisbane, Dawn Economy Position Paper
    , October 2026, page 13.
  



.bson-dawn-box {
  background: #f3f7fb;
  border: 1px solid #d5e1ed;
  border-left: 5px solid #23608c;
  border-radius: 6px;
  padding: 24px;
  margin: 28px 0;
  color: #263746;
  font-family: inherit;
  line-height: 1.65;
}

.bson-dawn-box h3 {
  font-size: 21px;
  line-height: 1.35;
  color: #183b56;
  margin: 0 0 12px;
  font-weight: 700;
}

.bson-dawn-intro {
  margin: 0 0 18px;
  font-size: 15px;
}

.bson-dawn-item {
  border-top: 1px solid #d5e1ed;
  padding: 13px 0;
}

.bson-dawn-item h4 {
  font-size: 16px;
  font-weight: 700;
  color: #205c83;
  margin: 0 0 4px;
}

.bson-dawn-item p {
  margin: 0;
  font-size: 15px;
}

.bson-dawn-box .bson-dawn-note {
  background: #e5eef6;
  border-radius: 4px;
  padding: 12px 14px;
  margin: 16px 0 12px;
  font-size: 13px;
}

.bson-dawn-source {
  font-size: 12px;
  color: #586a79;
  margin: 0;
}

.bson-dawn-source a {
  color: #205c83;
  text-decoration: underline;
}

@media (max-width: 600px) {
  .bson-dawn-box {
    padding: 18px;
  }

  .bson-dawn-box h3 {
    font-size: 19px;
  }

  .bson-dawn-item p,
  .bson-dawn-intro {
    font-size: 14px;
  }
}





The Committee also advocates a coordinated 24-hour economy strategy, opportunities in wellness tourism and greater use of Brisbane's outdoor lifestyle as the city prepares for the 2032 Olympic and Paralympic Games.



Committee for Brisbane chief executive Jen Williams has identified early-morning activity as an opportunity to strengthen the city's economy alongside its established night-time hospitality and entertainment sectors.



Queensland's&nbsp;draft State Planning Policy&nbsp;also recognises dawn and night-time economic activity as considerations in land-use planning. Public consultation on the draft closed on 26 October, with the final policy yet to be settled.



Existing recreation investment and transport priorities



Brisbane City Council has separately announced a $5.6 million investment in&nbsp;Move Well Brisbane, expanding its existing Active and Healthy programme. Council says the initiative will deliver 20,000 free and low-cost activity sessions over two years and involve approximately 400 local businesses.



Activities will be available across mornings, evenings and weekends, including fitness, nutrition and wellbeing programmes. Funding for Move Well Brisbane is separate from any future infrastructure commitments arising from the Dawn Economy Plan.



Council Opposition Leader Jared Cassidy criticised the survey as unnecessary, arguing that council should prioritise earlier public transport services and improved lighting in parks and along bikeways, particularly during winter mornings.



The Dawn Economy Plan remains in development, with no confirmed list of suburb-specific upgrades, construction timetable or dedicated infrastructure budget. Feedback from residents, businesses and precinct representatives will help inform the council's next steps.



Published 27-Oct-2026Featured Image Credit: Committee for Brisbane




]]></description>
<content:encoded><![CDATA[


Brisbane's early-morning routines could receive greater attention under a new citywide plan examining improvements to public facilities, walking and cycling routes, transport connections and opportunities for businesses trading before sunrise.



Brisbane City Council opened&nbsp;public consultation&nbsp;on 20 October 2026, inviting residents to share how they use the city between 4:00 a.m. and 7:00 a.m. The five-minute survey closes at 11:59 p.m. on Sunday, 22 November 2026, with responses intended to guide future planning and investment.




HAVE YOUR SAY




Better lighting, paths and public facilities under consideration



The proposed&nbsp;Dawn Economy Plan&nbsp;considers improved lighting along walking and running routes, more drinking fountains and public toilets, additional shade and seating in parks, and better connections between pedestrian and cycling paths.



Residents are being asked where they go, what activities they undertake and which improvements would make Brisbane easier to navigate in the early hours. Public transport connections and opportunities for early-trading businesses are also part of the consultation.



No suburb-specific upgrades have been approved through the plan. Council will use community feedback to help establish priorities, while businesses and precinct representatives will be consulted about opportunities to support morning activity.



Brisbane's early trading leads other capitals



Research by Ingenium&nbsp;found that one in eight Brisbane food and drink venues was trading at 5:00 a.m., compared with one in 25 in Sydney and one in 33 in Melbourne and Perth.



Further analysis by researcher Dr Anna Edwards found that approximately one-third of Brisbane's food and drink businesses were operating between 6:00 a.m. and 7:00 a.m., with around half open by 8:00 a.m.



Dr Edwards identified Brisbane's established early-trading patterns as an economic advantage, supported by the city's outdoor lifestyle and demand for morning hospitality and recreation.



Council has also highlighted Brisbane's 19 Saturday parkruns, which attract thousands of runners, walkers and volunteers, as evidence of the city's established appetite for early outdoor activity.



Lord Mayor Adrian Schrinner said the consultation would help identify practical improvements for residents who already use Brisbane's parks, pathways, pools and hospitality venues before the conventional working day begins.



Five precinct connections proposed across Brisbane



The&nbsp;Committee for Brisbane's Dawn Economy Position Paper, released on 18 October, examines economic activity between 5:00 a.m. and 9:00 a.m. and proposes stronger connections between major recreation, cultural, education and business precincts.



Its recommendations identify five potential corridors spanning the Brisbane River, education and research centres, recreation areas, cultural destinations and sporting facilities.



The proposed connections include South Bank and Kangaroo Point along the river, Mt Coot-tha and Victoria Park through the recreation corridor, and Fortitude Valley, New Farm and West End through the cultural corridor. No construction commitments have been announced for these recommendations.





  Five Proposed Dawn Economy Connections Across Brisbane

  
    The Committee for Brisbane has identified five potential
    connections between major activity precincts.
  

  
    River corridor
    Howard Smith Wharves, CBD, Botanic Gardens,
    South Bank and Kangaroo Point.
  

  
    Knowledge corridor
    Herston, Kelvin Grove, Roma Street, CBD,
    Gardens Point and Boggo Road.
  

  
    Recreation corridor
    Mt Coot-tha, Victoria Park, Spring Hill,
    CBD and Kangaroo Point.
  

  
    Cultural corridor
    Fortitude Valley, New Farm, Howard Smith Wharves,
    Queensland Cultural Centre and West End.
  

  
    Sports corridor
    Ballymore, Victoria Park, RNA Showgrounds,
    Woolloongabba and Queensland Tennis Centre.
  

  
    Planning status:
    These connections are recommendations, not approved
    or funded construction projects.
  

  
    Source:
    
      Committee for Brisbane, Dawn Economy Position Paper
    , October 2026, page 13.
  



.bson-dawn-box {
  background: #f3f7fb;
  border: 1px solid #d5e1ed;
  border-left: 5px solid #23608c;
  border-radius: 6px;
  padding: 24px;
  margin: 28px 0;
  color: #263746;
  font-family: inherit;
  line-height: 1.65;
}

.bson-dawn-box h3 {
  font-size: 21px;
  line-height: 1.35;
  color: #183b56;
  margin: 0 0 12px;
  font-weight: 700;
}

.bson-dawn-intro {
  margin: 0 0 18px;
  font-size: 15px;
}

.bson-dawn-item {
  border-top: 1px solid #d5e1ed;
  padding: 13px 0;
}

.bson-dawn-item h4 {
  font-size: 16px;
  font-weight: 700;
  color: #205c83;
  margin: 0 0 4px;
}

.bson-dawn-item p {
  margin: 0;
  font-size: 15px;
}

.bson-dawn-box .bson-dawn-note {
  background: #e5eef6;
  border-radius: 4px;
  padding: 12px 14px;
  margin: 16px 0 12px;
  font-size: 13px;
}

.bson-dawn-source {
  font-size: 12px;
  color: #586a79;
  margin: 0;
}

.bson-dawn-source a {
  color: #205c83;
  text-decoration: underline;
}

@media (max-width: 600px) {
  .bson-dawn-box {
    padding: 18px;
  }

  .bson-dawn-box h3 {
    font-size: 19px;
  }

  .bson-dawn-item p,
  .bson-dawn-intro {
    font-size: 14px;
  }
}





The Committee also advocates a coordinated 24-hour economy strategy, opportunities in wellness tourism and greater use of Brisbane's outdoor lifestyle as the city prepares for the 2032 Olympic and Paralympic Games.



Committee for Brisbane chief executive Jen Williams has identified early-morning activity as an opportunity to strengthen the city's economy alongside its established night-time hospitality and entertainment sectors.



Queensland's&nbsp;draft State Planning Policy&nbsp;also recognises dawn and night-time economic activity as considerations in land-use planning. Public consultation on the draft closed on 26 October, with the final policy yet to be settled.



Existing recreation investment and transport priorities



Brisbane City Council has separately announced a $5.6 million investment in&nbsp;Move Well Brisbane, expanding its existing Active and Healthy programme. Council says the initiative will deliver 20,000 free and low-cost activity sessions over two years and involve approximately 400 local businesses.



Activities will be available across mornings, evenings and weekends, including fitness, nutrition and wellbeing programmes. Funding for Move Well Brisbane is separate from any future infrastructure commitments arising from the Dawn Economy Plan.



Council Opposition Leader Jared Cassidy criticised the survey as unnecessary, arguing that council should prioritise earlier public transport services and improved lighting in parks and along bikeways, particularly during winter mornings.



The Dawn Economy Plan remains in development, with no confirmed list of suburb-specific upgrades, construction timetable or dedicated infrastructure budget. Feedback from residents, businesses and precinct representatives will help inform the council's next steps.



Published 27-Oct-2026Featured Image Credit: Committee for Brisbane




]]></content:encoded>
</item><item>
<title><![CDATA[Where to Get Sandbags in Brisbane and Moreton Bay During Heavy Rain]]></title>
<link>https://newfarmnews.com.au/sandbag-stations-brisbane-moreton-bay-heavy-rain/sandbag-stations-brisbane-moreton-bay-heavy-rain</link>
<media:content url="https://newfarmnews.com.au/wp-content/uploads/2026/10/Sandbags-FI.png" medium="image"/>
<media:thumbnail url="https://newfarmnews.com.au/wp-content/uploads/2026/10/Sandbags-FI.png"/>
<enclosure url="https://newfarmnews.com.au/wp-content/uploads/2026/10/Sandbags-FI.png" length="1399203" type="image/png"/>
<pubDate>Thu, 22 Oct 2026 01:43:48 +0000</pubDate>
<dc:creator><![CDATA[New Farm News]]></dc:creator>
<guid isPermaLink="true">https://newfarmnews.com.au/sandbag-stations-brisbane-moreton-bay-heavy-rain/</guid>
<description><![CDATA[


Residents preparing for flooding across Brisbane and Moreton Bay have different sandbag collection arrangements depending on where they live, with five established collection points in Brisbane and emergency-activated stations across Moreton Bay.



Following heavy rainfall on Thursday, 22 October, Brisbane City Council's five permanent storm-season collection points remained covered by its published 24-hour arrangements. City of Moreton Bay, meanwhile, operates temporary self-service stations that must be activated before residents can collect sandbags.



Brisbane's five sandbag collection points



Brisbane City Council provides pre-filled sandbags from five depots throughout the October-to-March storm season. Its published arrangements specify collection 24 hours a day, seven days a week, at the following locations:




Darra: South Depot, 38 Shamrock Road



Lota: Depot, 58 Herbert Street



Morningside: Balmoral Depot, 9 Redfern Street



Newmarket: SES Depot, 66 Wilston Road



Zillmere: North Depot, 33 Jennings Street




The collection points are part of the council's established storm-season service rather than temporary locations opened solely in response to Thursday's rainfall. Individual stock levels have not been confirmed, and residents should check official updates before travelling.



Additional self-service stations may be established across Brisbane during significant severe weather. No extra location was independently verified during this review.



Moreton Bay stations require activation



City of Moreton Bay operates free sandbag collection stations when significant rainfall or potential flooding is forecast. Its published register identifies 13 sites across the region, although their operating status can change during severe weather.



The following locations are among those designated for emergency activation:




Caboolture: Council Depot Car Park, 98 Beerburrum Road



Narangba: 910 Oakey Flat Road, between Raynbird Road and Sovereign Drive



Deception Bay: SES, 2–22 Old Bay Road



Petrie: 3 Woonara Drive



Arana Hills: SES, 2 Pine Hills Drive, off Jinker Track



Margate: Jull Street, opposite the council depot



Bongaree: Bribie Island SES, 208 First Avenue



Beachmere: Rogers Street Sports Ground, 57 Rogers Street




Other designated locations are in Dayboro, Elimbah, Toorbul and Woodford, which has two collection sites.



The council's indexed station register displayed all 13 locations as closed during this research. However, its live dashboard map could not be independently checked, so the current operating status of individual sites remains unconfirmed.



Residents should consult the Moreton Bay Disaster Dashboard before leaving home. Operating locations are identified by green shovel icons, while activated stations are generally available around the clock until supplies run out.



What residents need to bring



Brisbane's regular collection points provide pre-filled sandbags. Moreton Bay's activated stations operate differently, with residents required to fill their own bags using sand supplied by the council.



Moreton Bay advises bringing a shovel, gloves, enclosed shoes, string or zip-ties, and spare empty bags. Council provides polypropylene bags when available, but supplies may run out.



Sandbags should be filled no more than two-thirds full to make them easier to carry and position. Queensland SES advises leaving the tops untied when laying the bags, although they may be secured for transport. Collection limits and assistance arrangements at individual stations have not been independently confirmed.







Before You Collect Sandbags



Check before travelling.
Stations may close or run out of supplies.
Never walk or drive through floodwater.



Brisbane: Five established storm-season
collection points provide pre-filled bags under
published 24-hour arrangements. Stock is not guaranteed.



Moreton Bay: Stations open only when
activated. Look for green shovel icons on the council
disaster dashboard. Collection is free and self-service.



What to bring in Moreton Bay



A shovel and spare empty bags
Gloves and enclosed shoes
String or zip-ties for transporting bags



Using sandbags safely



Fill bags halfway to two-thirds full.
Leave bag tops untied when positioning them.
Use plastic sheeting beneath staggered rows.
Keep at least one doorway accessible.
Do not rely on sandbags to stop major flooding.



Need help? SES:
132 500.
Life-threatening emergencies:
000.




Moreton Bay Disaster Dashboard





Brisbane emergency dashboard




Council arrangements checked 22 October 2026.
Confirm current station operations before travelling.







Heavy rainfall and flood safety



The Bureau of Meteorology recorded intense rainfall around Caboolture, Morayfield and Burpengary on Thursday morning.



A warning issued at 7:02 a.m. reported 131 millimetres at Caboolture, 128 millimetres at Sheep Station Creek in Morayfield and 127 millimetres at Burpengary during three-hour periods ending at 6:45 a.m. Those figures describe morning observations, not rainfall totals for the entire day.



Sandbags can reduce water entering buildings but cannot completely prevent flooding. Residents should place them where water may enter, using plastic sheeting beneath staggered rows, while keeping at least one exit accessible.



Never walk or drive through floodwater to collect supplies. For storm or flood assistance, contact the State Emergency Service on&nbsp;132 500. Call&nbsp;Triple Zero (000)&nbsp;for life-threatening emergencies.



Current warnings, local road closures and sandbag activation information are available through the Brisbane and Moreton Bay emergency dashboards.



Published 22-Oct-2026
]]></description>
<content:encoded><![CDATA[


Residents preparing for flooding across Brisbane and Moreton Bay have different sandbag collection arrangements depending on where they live, with five established collection points in Brisbane and emergency-activated stations across Moreton Bay.



Following heavy rainfall on Thursday, 22 October, Brisbane City Council's five permanent storm-season collection points remained covered by its published 24-hour arrangements. City of Moreton Bay, meanwhile, operates temporary self-service stations that must be activated before residents can collect sandbags.



Brisbane's five sandbag collection points



Brisbane City Council provides pre-filled sandbags from five depots throughout the October-to-March storm season. Its published arrangements specify collection 24 hours a day, seven days a week, at the following locations:




Darra: South Depot, 38 Shamrock Road



Lota: Depot, 58 Herbert Street



Morningside: Balmoral Depot, 9 Redfern Street



Newmarket: SES Depot, 66 Wilston Road



Zillmere: North Depot, 33 Jennings Street




The collection points are part of the council's established storm-season service rather than temporary locations opened solely in response to Thursday's rainfall. Individual stock levels have not been confirmed, and residents should check official updates before travelling.



Additional self-service stations may be established across Brisbane during significant severe weather. No extra location was independently verified during this review.



Moreton Bay stations require activation



City of Moreton Bay operates free sandbag collection stations when significant rainfall or potential flooding is forecast. Its published register identifies 13 sites across the region, although their operating status can change during severe weather.



The following locations are among those designated for emergency activation:




Caboolture: Council Depot Car Park, 98 Beerburrum Road



Narangba: 910 Oakey Flat Road, between Raynbird Road and Sovereign Drive



Deception Bay: SES, 2–22 Old Bay Road



Petrie: 3 Woonara Drive



Arana Hills: SES, 2 Pine Hills Drive, off Jinker Track



Margate: Jull Street, opposite the council depot



Bongaree: Bribie Island SES, 208 First Avenue



Beachmere: Rogers Street Sports Ground, 57 Rogers Street




Other designated locations are in Dayboro, Elimbah, Toorbul and Woodford, which has two collection sites.



The council's indexed station register displayed all 13 locations as closed during this research. However, its live dashboard map could not be independently checked, so the current operating status of individual sites remains unconfirmed.



Residents should consult the Moreton Bay Disaster Dashboard before leaving home. Operating locations are identified by green shovel icons, while activated stations are generally available around the clock until supplies run out.



What residents need to bring



Brisbane's regular collection points provide pre-filled sandbags. Moreton Bay's activated stations operate differently, with residents required to fill their own bags using sand supplied by the council.



Moreton Bay advises bringing a shovel, gloves, enclosed shoes, string or zip-ties, and spare empty bags. Council provides polypropylene bags when available, but supplies may run out.



Sandbags should be filled no more than two-thirds full to make them easier to carry and position. Queensland SES advises leaving the tops untied when laying the bags, although they may be secured for transport. Collection limits and assistance arrangements at individual stations have not been independently confirmed.







Before You Collect Sandbags



Check before travelling.
Stations may close or run out of supplies.
Never walk or drive through floodwater.



Brisbane: Five established storm-season
collection points provide pre-filled bags under
published 24-hour arrangements. Stock is not guaranteed.



Moreton Bay: Stations open only when
activated. Look for green shovel icons on the council
disaster dashboard. Collection is free and self-service.



What to bring in Moreton Bay



A shovel and spare empty bags
Gloves and enclosed shoes
String or zip-ties for transporting bags



Using sandbags safely



Fill bags halfway to two-thirds full.
Leave bag tops untied when positioning them.
Use plastic sheeting beneath staggered rows.
Keep at least one doorway accessible.
Do not rely on sandbags to stop major flooding.



Need help? SES:
132 500.
Life-threatening emergencies:
000.




Moreton Bay Disaster Dashboard





Brisbane emergency dashboard




Council arrangements checked 22 October 2026.
Confirm current station operations before travelling.







Heavy rainfall and flood safety



The Bureau of Meteorology recorded intense rainfall around Caboolture, Morayfield and Burpengary on Thursday morning.



A warning issued at 7:02 a.m. reported 131 millimetres at Caboolture, 128 millimetres at Sheep Station Creek in Morayfield and 127 millimetres at Burpengary during three-hour periods ending at 6:45 a.m. Those figures describe morning observations, not rainfall totals for the entire day.



Sandbags can reduce water entering buildings but cannot completely prevent flooding. Residents should place them where water may enter, using plastic sheeting beneath staggered rows, while keeping at least one exit accessible.



Never walk or drive through floodwater to collect supplies. For storm or flood assistance, contact the State Emergency Service on&nbsp;132 500. Call&nbsp;Triple Zero (000)&nbsp;for life-threatening emergencies.



Current warnings, local road closures and sandbag activation information are available through the Brisbane and Moreton Bay emergency dashboards.



Published 22-Oct-2026
]]></content:encoded>
</item><item>
<title><![CDATA[New Farm's Merthyr Melodies Brings Dementia-Friendly Singing to Thursdays]]></title>
<link>https://newfarmnews.com.au/new-farms-merthyr-melodies-brings-dementia-friendly-singing-to-thursdays</link>
<media:content url="https://newfarmnews.com.au/wp-content/uploads/2026/10/unnamed-file.png" medium="image"/>
<media:thumbnail url="https://newfarmnews.com.au/wp-content/uploads/2026/10/unnamed-file.png"/>
<enclosure url="https://newfarmnews.com.au/wp-content/uploads/2026/10/unnamed-file.png" length="981114" type="image/png"/>
<pubDate>Sun, 25 Oct 2026 19:18:45 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[Brisbane community]]></category>
<category><![CDATA[community singing]]></category>
<category><![CDATA[dementia carers]]></category>
<category><![CDATA[dementia-friendly choir]]></category>
<category><![CDATA[Merthyr Melodies]]></category>
<category><![CDATA[Merthyr Road Uniting Church]]></category>
<category><![CDATA[new farm]]></category>
<dc:creator><![CDATA[New Farm News]]></dc:creator>
<guid isPermaLink="true">https://newfarmnews.com.au/?page_id=78726</guid>
<description><![CDATA[
Morning tea comes before the music at New Farm's newest community choir, where a dementia-friendly approach is helping make singing accessible to people living with the condition, their carers and anyone else who enjoys a tune.



Read: Where to Get Sandbags in Brisbane and Moreton Bay During Heavy Rain



Merthyr Melodies, an initiative of Merthyr Road Uniting Church, began meeting in August under the direction of Louise Osborne. The group welcomes people regardless of whether they have a connection to dementia, with its sessions designed to be friendly, enjoyable and considerate of participants who may need additional support.



A Choir With Room For Different Voices



Osborne has described singing together and building connections as the guiding purpose of Merthyr Melodies. Rather than limiting membership to people affected by dementia, the choir brings together anyone interested in taking part, while remaining mindful of the needs of those living with the condition and their carers.



Photo Credit: Merthyr Melodies/Facebook



The weekly gathering includes time for morning tea before rehearsals, giving participants an opportunity to meet and socialise alongside the singing. Helping the choir find its feet during its opening weeks was Graham Godfrey, a pianist, organist and tenor who has performed in Australia, the United Kingdom and Europe. Godfrey joined Osborne as an accompanist while the group's initial repertoire was being prepared. At the time of the choir's launch, organisers had not secured a permanent accompanist. Godfrey was scheduled to assist during the first few weeks and remain available as a back-up when needed.



Photo Credit: Merthyr Melodies/Facebook



From Six Weeks of Practice To A Public Performance



Merthyr Melodies soon took its singing beyond the rehearsal room, appearing at Palliative Care Queensland's Good Life Good Death Expo on 19 September 2026. The appearance was the choir's first public performance, coming approximately six weeks after rehearsals began. The group subsequently shared feedback from an audience member who praised the quality of the performance, particularly the familiar, cheerful songs and the preparation achieved in such a short period.



The performance followed the choir's inaugural term, which ran from 6 August to 17 September. Its second term began on 8 October, continuing the Thursday morning sessions at the church. Merthyr Melodies meets at 52 Merthyr Road, New Farm, every Thursday during school terms. Morning tea is available from 9:30 am, with singing scheduled between 10:00 am and 11:00 am.



Read: CityCat Bar Proposal Could Bring Drinks Aboard New Farm River Trips



Sessions cost $5 per person, with the inaugural session having been offered free of charge. The current term is scheduled to run until 10 December 2026, and further details are available through the Merthyr Melodies official social media page.



Published 20-October-2026
]]></description>
<content:encoded><![CDATA[
Morning tea comes before the music at New Farm's newest community choir, where a dementia-friendly approach is helping make singing accessible to people living with the condition, their carers and anyone else who enjoys a tune.



Read: Where to Get Sandbags in Brisbane and Moreton Bay During Heavy Rain



Merthyr Melodies, an initiative of Merthyr Road Uniting Church, began meeting in August under the direction of Louise Osborne. The group welcomes people regardless of whether they have a connection to dementia, with its sessions designed to be friendly, enjoyable and considerate of participants who may need additional support.



A Choir With Room For Different Voices



Osborne has described singing together and building connections as the guiding purpose of Merthyr Melodies. Rather than limiting membership to people affected by dementia, the choir brings together anyone interested in taking part, while remaining mindful of the needs of those living with the condition and their carers.



Photo Credit: Merthyr Melodies/Facebook



The weekly gathering includes time for morning tea before rehearsals, giving participants an opportunity to meet and socialise alongside the singing. Helping the choir find its feet during its opening weeks was Graham Godfrey, a pianist, organist and tenor who has performed in Australia, the United Kingdom and Europe. Godfrey joined Osborne as an accompanist while the group's initial repertoire was being prepared. At the time of the choir's launch, organisers had not secured a permanent accompanist. Godfrey was scheduled to assist during the first few weeks and remain available as a back-up when needed.



Photo Credit: Merthyr Melodies/Facebook



From Six Weeks of Practice To A Public Performance



Merthyr Melodies soon took its singing beyond the rehearsal room, appearing at Palliative Care Queensland's Good Life Good Death Expo on 19 September 2026. The appearance was the choir's first public performance, coming approximately six weeks after rehearsals began. The group subsequently shared feedback from an audience member who praised the quality of the performance, particularly the familiar, cheerful songs and the preparation achieved in such a short period.



The performance followed the choir's inaugural term, which ran from 6 August to 17 September. Its second term began on 8 October, continuing the Thursday morning sessions at the church. Merthyr Melodies meets at 52 Merthyr Road, New Farm, every Thursday during school terms. Morning tea is available from 9:30 am, with singing scheduled between 10:00 am and 11:00 am.



Read: CityCat Bar Proposal Could Bring Drinks Aboard New Farm River Trips



Sessions cost $5 per person, with the inaugural session having been offered free of charge. The current term is scheduled to run until 10 December 2026, and further details are available through the Merthyr Melodies official social media page.



Published 20-October-2026
]]></content:encoded>
</item><item>
<title><![CDATA[CityCat Bar Proposal Could Bring Drinks Aboard New Farm River Trips]]></title>
<link>https://newfarmnews.com.au/citycat-bar-proposal-could-bring-drinks-aboard-new-farm-river-trips</link>
<media:content url="https://newfarmnews.com.au/wp-content/uploads/2026/10/CityCat2.png" medium="image"/>
<media:thumbnail url="https://newfarmnews.com.au/wp-content/uploads/2026/10/CityCat2.png"/>
<enclosure url="https://newfarmnews.com.au/wp-content/uploads/2026/10/CityCat2.png" length="1561389" type="image/png"/>
<pubDate>Thu, 15 Oct 2026 01:41:58 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[Brisbane CityCat drinks]]></category>
<category><![CDATA[Brisbane River]]></category>
<category><![CDATA[Brisbane river tourism]]></category>
<category><![CDATA[CityCat bar proposal]]></category>
<category><![CDATA[licensed ferry bars]]></category>
<category><![CDATA[new farm]]></category>
<category><![CDATA[New Farm CityCat]]></category>
<category><![CDATA[New Farm Park ferry]]></category>
<category><![CDATA[Sydney Street Ferry Terminal]]></category>
<dc:creator><![CDATA[New Farm News]]></dc:creator>
<guid isPermaLink="true">https://newfarmnews.com.au/?page_id=78683</guid>
<description><![CDATA[
New Farm passengers could eventually enjoy a drink while travelling past Brisbane's riverfront landmarks, with licensed bars being considered for selected CityCats.



Read: New Farm Leads Australia In 2026 World’s Coolest Neighbourhoods List



Existing service desks could become refreshment counters



Under the reported proposal, existing service desks aboard some CityCats could be converted into counters selling food and alcoholic drinks. Double-decker vessels are among those being considered, with a limited trial proposed before any wider introduction.



Committee for Brisbane chief executive Jen Williams has reportedly welcomed exploring the idea, citing opportunities to build on the popularity of recreational ferry trips and Brisbane's river tourism. She also emphasised the importance of maintaining safe and reliable public transport.



Photo Credit: BCC



The idea emerged on 14 October 2026, with Lord Mayor Adrian Schrinner reportedly interested in trialling food and alcohol sales aboard the city's ferries. The proposed service could add another option for passengers taking longer river journeys, although no trial has been approved.



New Farm's CityCat connections at Sydney Street and New Farm Park already provide access to destinations across Brisbane. The New Farm Park terminal is also close to Brisbane Powerhouse and the surrounding parklands, where ferry travel forms part of the area's established recreational connections.



Council considers bars for 10 CityCats



Brisbane City Council has confirmed it is exploring a pilot involving 10 double-decker CityCats. Cr Andrew Wines said the idea was still in its early stages, with Council interested in offering passengers the option of purchasing food and drinks during their journeys.



Cr Wines added that CityCat patronage was higher than weekday patronage, prompting consideration of ways to improve the experience for passengers. Council is seeking public feedback on the concept, while operating hours and the range of food and beverages remain undecided.



Responding to concerns about alcohol aboard public transport, Cr Wines said any trial would comply with liquor licensing and responsible service of alcohol requirements. He distinguished the proposed offering from a party boat, describing it instead as an opportunity for passengers to enjoy an occasional drink during their journey.



Onboard drinks proposal draws mixed reactions



The possibility of licensed CityCat bars has prompted mixed responses on social media, with some welcoming the prospect of evening drinks on the river and others questioning affordability and alcohol consumption.



In a Lady Brisbane Instagram discussion, one commenter suggested the service could be profitable during evening trips, while another doubted whether ordinary passengers would be able to afford onboard drinks. Others raised concerns about alcohol on public transport or recalled enjoying drinks aboard Sydney ferries.



The discussion also included suggestions that tourists could be among the main customers, although no intended customer market or drinks pricing has been announced.



Photo Credit: Wikimedia/John Robert McPherson/CC 4.0



Sydney ferries already offer drinks onboard



Licensed bars are already part of some Australian ferry services. Sydney's Manly Fast Ferry, which operates between Circular Quay and Manly, offers onboard alcohol sales during its approximately 18-to-20-minute harbour crossing.



The service provides an existing example of refreshments being sold aboard passenger ferries, although Brisbane's proposed CityCat arrangements have yet to be determined.



Current ferry rules would need consideration



Translink's existing Passenger Code of Conduct prohibits consuming food and drinks aboard public transport services. Any CityCat trial would therefore need to address how onboard refreshment sales would operate under the applicable passenger rules.



Queensland's liquor licensing framework includes provisions for commercial vessels where alcohol sales are secondary to the main business. A licensed CityCat operation would require appropriate approval and compliance with responsible service of alcohol requirements, including applicable staff training and the management of intoxicated patrons.



Read: The New Farm Bubbler That Was Crowned Brisbane’s Best



Further consideration of the proposal is reportedly linked to negotiations involving ferry operator RiverCity Ferries. Details of participating vessels, permitted service hours and food and beverage pricing have not been publicly confirmed.



Published 15-Oct-2026
]]></description>
<content:encoded><![CDATA[
New Farm passengers could eventually enjoy a drink while travelling past Brisbane's riverfront landmarks, with licensed bars being considered for selected CityCats.



Read: New Farm Leads Australia In 2026 World’s Coolest Neighbourhoods List



Existing service desks could become refreshment counters



Under the reported proposal, existing service desks aboard some CityCats could be converted into counters selling food and alcoholic drinks. Double-decker vessels are among those being considered, with a limited trial proposed before any wider introduction.



Committee for Brisbane chief executive Jen Williams has reportedly welcomed exploring the idea, citing opportunities to build on the popularity of recreational ferry trips and Brisbane's river tourism. She also emphasised the importance of maintaining safe and reliable public transport.



Photo Credit: BCC



The idea emerged on 14 October 2026, with Lord Mayor Adrian Schrinner reportedly interested in trialling food and alcohol sales aboard the city's ferries. The proposed service could add another option for passengers taking longer river journeys, although no trial has been approved.



New Farm's CityCat connections at Sydney Street and New Farm Park already provide access to destinations across Brisbane. The New Farm Park terminal is also close to Brisbane Powerhouse and the surrounding parklands, where ferry travel forms part of the area's established recreational connections.



Council considers bars for 10 CityCats



Brisbane City Council has confirmed it is exploring a pilot involving 10 double-decker CityCats. Cr Andrew Wines said the idea was still in its early stages, with Council interested in offering passengers the option of purchasing food and drinks during their journeys.



Cr Wines added that CityCat patronage was higher than weekday patronage, prompting consideration of ways to improve the experience for passengers. Council is seeking public feedback on the concept, while operating hours and the range of food and beverages remain undecided.



Responding to concerns about alcohol aboard public transport, Cr Wines said any trial would comply with liquor licensing and responsible service of alcohol requirements. He distinguished the proposed offering from a party boat, describing it instead as an opportunity for passengers to enjoy an occasional drink during their journey.



Onboard drinks proposal draws mixed reactions



The possibility of licensed CityCat bars has prompted mixed responses on social media, with some welcoming the prospect of evening drinks on the river and others questioning affordability and alcohol consumption.



In a Lady Brisbane Instagram discussion, one commenter suggested the service could be profitable during evening trips, while another doubted whether ordinary passengers would be able to afford onboard drinks. Others raised concerns about alcohol on public transport or recalled enjoying drinks aboard Sydney ferries.



The discussion also included suggestions that tourists could be among the main customers, although no intended customer market or drinks pricing has been announced.



Photo Credit: Wikimedia/John Robert McPherson/CC 4.0



Sydney ferries already offer drinks onboard



Licensed bars are already part of some Australian ferry services. Sydney's Manly Fast Ferry, which operates between Circular Quay and Manly, offers onboard alcohol sales during its approximately 18-to-20-minute harbour crossing.



The service provides an existing example of refreshments being sold aboard passenger ferries, although Brisbane's proposed CityCat arrangements have yet to be determined.



Current ferry rules would need consideration



Translink's existing Passenger Code of Conduct prohibits consuming food and drinks aboard public transport services. Any CityCat trial would therefore need to address how onboard refreshment sales would operate under the applicable passenger rules.



Queensland's liquor licensing framework includes provisions for commercial vessels where alcohol sales are secondary to the main business. A licensed CityCat operation would require appropriate approval and compliance with responsible service of alcohol requirements, including applicable staff training and the management of intoxicated patrons.



Read: The New Farm Bubbler That Was Crowned Brisbane’s Best



Further consideration of the proposal is reportedly linked to negotiations involving ferry operator RiverCity Ferries. Details of participating vessels, permitted service hours and food and beverage pricing have not been publicly confirmed.



Published 15-Oct-2026
]]></content:encoded>
</item>
</channel>
</rss>
<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/?utm_source=w3tc&utm_medium=footer_comment&utm_campaign=free_plugin

Page Caching using Disk: Enhanced 

Served from: fortitudevalleynews.com.au @ 2026-11-16 09:12:44 by W3 Total Cache
-->