Story Bridge To Close For Three Weeks Over Summer

Fortitude Valley motorists will need to rethink their usual route across the Brisbane River this summer, with the Story Bridge set to close to road traffic for three weeks during major maintenance works.


Read: Hotel Beneath Story Bridge Enters Market At $115 Million


The closure will begin at 1am on Sunday, 27 December 2026, and continue until 5am on Monday, 18 January 2027. Brisbane City will use the period to carry out resurfacing, waterproofing and structural maintenance, while the eastern footpath will remain open for pedestrians, cyclists, and scooter riders.

Major Works Planned For The Bridge

Photo credit: Google Maps/Ian Mooney

The work will cover the southern approach of the Story Bridge in Kangaroo Point, as well as sections of the Bradfield Highway on both sides of the river. The works will include structural deck maintenance, waterproofing and resurfacing. Expansion joints on the main bridge span will also undergo maintenance, with crews expected to work around the clock where weather and construction conditions allow.

BCC has scheduled the closure across the December and January holiday period, when traffic demand is typically lower. The timing is intended to minimise disruption while the work is carried out.

The Story Bridge carries about 100,000 vehicles each day, making it a major transport link between Fortitude Valley, Kangaroo Point and other parts of Brisbane.

How Will Valley Travellers Be Affected?

Photo credit: Google Maps/Steve Jayatilake

Drivers who normally use the Story Bridge will need to use alternative river crossings while the bridge is closed. The most suitable route will depend on each traveller’s destination, while navigation apps can help motorists choose an alternative crossing.

BCC expects delays during the closure and is advising drivers to plan their journeys ahead of time and check traffic information before setting out. Public transport users are also advised to check Translink for updated service information during the closure period.

The closure will apply to road traffic, but people travelling through the area on foot, by bicycle or by scooter will still have a way across the river. The eastern footpath will remain open, while the western footpath will temporarily close to support construction activities. Emergency vehicles responding to urgent incidents with lights and sirens will continue to have access across the bridge.

Maintenance Ahead Of Major Renewal

The three-week project is part of the ongoing maintenance of the heritage-listed Story Bridge and is separate from Brisbane’s broader plans to renew the ageing structure.

BCC said its longer-term renewal program is being developed using a detailed business case and specialist engineering advice. Proposed works include repairs to steel and concrete, replacement of ageing components, improvements to bridge access and upgrades to essential services.


Read: Experience the Story Bridge Adventure Climb Like Never Before at Howard Smith Wharves


The current timeline lists minor renewal works as commencing in early 2027, while major renewal works are scheduled to begin from late 2027 and beyond, subject to funding availability.

The Story Bridge is scheduled to reopen to road traffic at 5am on Monday, 18 January 2027. Until then, Fortitude Valley residents, workers and visitors who normally use the bridge will need to factor the temporary closure into their travel plans.

Published 28-September-2026

Fortitude Valley Travel Guide for Riverfire 2026

Fortitude Valley will sit on the edge of some of Riverfire’s biggest traffic restrictions, with Story Bridge access, nearby streets and riverside routes affected as crowds move towards viewing areas around Howard Smith Wharves and New Farm.



Riverfire will be held on Saturday, 5 September, with Royal Australian Air Force flyovers scheduled from 4:45 p.m. to 5:30 p.m. and fireworks beginning at 7:00 p.m. The display opens Brisbane Festival and is free to attend.

Howard Smith Wharves will draw spectators towards the river

Howard Smith Wharves is one of the official Riverfire viewing locations and places spectators directly beside the Brisbane River beneath the Story Bridge.

The precinct combines river views with dining and hospitality venues, making it one of the closest viewing options for people approaching from Fortitude Valley. Wilson Outlook Reserve, on the New Farm side of the precinct, is another elevated viewing location overlooking the Story Bridge and city skyline.

People heading towards either location will be moving through streets affected by temporary traffic controls before and during the fireworks.

Story Bridge access closes during the busiest period

The Story Bridge will be closed to traffic from 6:30 p.m. to 8:00 p.m., cutting the direct road connection between Fortitude Valley and Kangaroo Point while the display is under way.

Several streets leading towards the bridge and Howard Smith Wharves will also close or lose lanes between 6:30 p.m. and 8:00 p.m. Full closures include sections of Ivory Street, Martin Street, Harrison Lane and Bowen Terrace.

Kemp Place will have a partial closure, while lane restrictions will apply on Ann Street, Gipps Street and Wickham Street. Brisbane City Council says signed detours, traffic controllers and police will be in place to manage movements through the affected area.

Ann Street and Wickham Street will remain open with restrictions

Fortitude Valley’s main north-south roads will not be completely shut, but motorists can expect reduced capacity near the Story Bridge approaches.

One of four southwest-bound lanes on Ann Street between Kemp Place and Brunswick Street will close during the Riverfire period. A north-eastbound lane on Wickham Street between Gotha Street and Gipps Street will also close, while two of three lanes on Gipps Street between Wickham Street and Barry Parade will be unavailable.

Drivers travelling through the Valley rather than attending Riverfire may encounter delays around these approaches between 6:30 p.m. and 8:00 p.m.

Trains remain a key option for Valley travellers

Fortitude Valley railway station will continue to provide access to the broader train network, while Translink is adding services across the network after the fireworks.

Free post-event travel will run from 7:30 p.m. to 9:30 p.m. from selected inner-city train and bus stations. Central and Roma Street stations are included in the free-travel zone, but Fortitude Valley station is not listed among the designated free departure points.

Passengers using buses should also check Riverfire service changes before travelling. Translink has advised that major alterations will apply to many Brisbane City bus services after the fireworks, and some additional services will not appear in journey-planning or real-time information.


Saturday night crowds will extend beyond the fireworks

Riverfire falls on a Saturday night in a precinct already known for late-night dining, entertainment and nightlife. Road restrictions around the Story Bridge and Howard Smith Wharves will overlap with regular evening activity in Fortitude Valley.

People moving between the Valley, CBD and riverside precincts will therefore face a different transport pattern before and immediately after the 7:00 p.m. display. Story Bridge access will reopen after 8:00 p.m., but other event-related traffic controls may remain in place longer as crowds disperse.



Riverfire opens three weeks of Brisbane Festival

Riverfire marks the opening weekend of Brisbane Festival, but the citywide program continues well beyond Saturday night. Brisbane Festival runs from 4–26 September, with theatre, music, dance, installations, family activities and free events scheduled across Brisbane, including a substantial program at South Bank. Events range from Bright Nights, running throughout the festival, to concerts, workshops, community celebrations and performances at Festival Village.

Published 4-Sept-2026